排泥口 的英文怎麼說

中文拼音 [bèikǒu]
排泥口 英文
sludge outlet
  • : 排構詞成分。
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  1. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地下室,下水道,水管,,水和混凝土,地基等相關的結構設備進行每季度,每半年,每年的檢查和修理。
  2. Standard features include : 3 ” waste outlet valve, left side service, 2 ” fresh water outlet valve, sight glasses, hose bracket, strap tie - down brackets, bumper hitch, rear mud - flaps, wand holster, unique baffle design, keyed locking cabinets

    標準系統包括: 3 "大小閥,左邊服務系統, 2 "大小清水閥、視鏡、軟管支架、捷牽制下拉支架、防撞緩沖器、後方瓣、棒皮套、獨特設計擋板、可鎖壁櫃。
  3. Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore

    本文在查閱大量文獻的基礎上,對疏浚泵及管道的動態特性現象進行了分析,並應用面向對象的c + +語言開發了比較通用的計算機程序,對緊急關閥、水下挖掘機具(如絞刀、斗輪等)吸堵塞以及事故拋泵等典型的動態工況特性進行了計算和分析。
  4. Conceptual planning and test on waterway regulation, river trainning and harbour engineering. analyzing sedimentation in hydraulic structures, water intakes and drainage project, etc

    航道整治、河道治理、內河港的規劃設計及試驗分析研究。水工建築、電廠取水等工程沙的分析研究及處理。
  5. In addition, the application of the present model to the " design of new sediment sluice at the taohe mouth in the liujiaxia reservoir " supports the experimental results conducted by the department of sediment research, iwhr

    在運用此模型對尚在立項中的「劉家峽水庫增建洮河沙洞方案」進行計算時,計算結果支持了中國水利水電科學研究院沙研究所的動床物理模型試驗結果。
  6. The pattern of shoujinliao ' s climatic design : first, it talks about shoujinliao ' s ventilation, analyses every stale belong to each compose of space appeared in shoujinliao. sum up that ventilation system is made up by draught and wind route, by showing data and photograph, then, it talks about shoujinliao ' s methods of sunshade and heat insulation, that is, sunshade of concentrated, sunshade of small yard, sunshade of eaves, sunshade of balcony. heat insulation of outward wall, clay tiled roof and composition neatly

    著重分析手巾寮結合氣候的模式,首先談及手巾寮建築通風經驗,深入分析各種空間高低組合情況下手巾寮的通風情況,藉助調研資料和實景照片對通風系統中通風和風道的合理安進行介紹;其次是手巾寮其他氣候經驗,如遮陽方式主要體現在連房密集遮陽、小天井遮陽、檐下灰空間遮陽、陽臺遮陽等,又如隔熱途徑有墻體隔熱、灰苫背瓦屋面隔熱及規整形隔熱,再如綠化水體的降溫措施,上升到環境高度看待建築,探討手巾寮組織天井綠化、利用街巷綠化、配合周邊水域的建造經驗。
  7. The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward

    文中介紹了2個電站進水沙底孔的沙模型試驗情況,提出了一種新的「格柵式沙廊道沙底孔」的組合型式(簡稱格柵式沙底孔) ,取得了理想的沙效果,較好地解決了工程實際問題。
  8. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條沙洞,擔負著泄洪、沙、調節徑流和保證進水不被沙淤堵的任務.根據沙洞的水庫運用要求,灌漿帷幕下游沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  9. The regulation of estuaries ; the sediment transport problems in harbors and navigation channels ; the environmental problems in water intakes and outlets of electricity plants

    多從事河整治、港航道建設中的沙問題、電廠取布置等咨詢業務。
  10. Sludge disposal system availability range from c13 superscript bin discharging sludge dewatering mouth, until dry sludge provide material, burning, smoke and ash emissions purification of the entire output of mechanical equipment, process pipelines, electrical equipment, instrument control system and civil engineering, including the whole project within the scope of the design, construction, manufacture, installation, and trial run and test run after the normal operation of the after - sales service

    處置系統供貨范圍從c13標脫水污料倉出料開始,直到干化污出料、焚燒、煙氣凈化放和灰渣輸出為止的整套機械設備、工藝管道、電氣設備、儀控系統和土建工程,包括整個工程范圍內的設計、施工、製造、安裝調試、試運行及正常運行后的售後服務。
分享友人