排流量 的英文怎麼說

中文拼音 [bèiliúliáng]
排流量 英文
discharge capacity
  • : 排構詞成分。
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. The upper of the east model boundary remains constant head and the at the lower of it, there might exists a diffluent interface. so the east and west sides of the diffluent interface are respectively the drainage area of east and west karst - groundwater of yellow river

    模型東界上部以黃河水位為第一類水頭已知邊界,下部必存在一個分面,分面東西兩側分別是黃河東西兩塊巖溶水的泄區,該分面可視為零邊界。
  2. The amount or rate of emission or ejection

    速,或出的速度
  3. With a big flow rate, it is suitable for the use of plain river network area and hilly irrigation and drainage, piscina water supply and drainage industrial water supply and drainage

    本產品大,適用於平原河網地區和丘陵灌區,特別適用於農田灌、魚塘供水及工業供水。
  4. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重試驗看,在正常運用下,水庫產生泥沙異重的機率較大,能否運動到壩前出庫外,還要看異重潛入點位置、入庫、洪峰歷時、入庫含沙、水庫閘門運用等因素,需要做好異重預報監測工作。
  5. Finding a feasible and efficient load balanced strategy for the ultra - scalable multi - plane multi - stage switch architecture is a top of nowadays research. the dissertation proposes a two - stage load balanced scheme for the ultra - scalable multi - plane multi - stage switch architecture based self - routing and non - blocking permutation benes network. the approach uses reasonable and efficient logical queueing strategy and schedule scheme in ingress traffic managers and switch planes to realize the two - stage load balancing of ip traffic which for different destination addresses

    本文提出一種適用於基於完全可重無阻塞benes拓撲構建的多平面多路徑(多級)超大容交換結構的兩級負載均衡策略,通過在輸入管理器和benes交換平面內部實施合理而高效的隊列組織調度方法,有效實現了基於不同目的地址的ip在兩個層次上的負載均衡,較好彌補了ciscocrs - 1系統在平面選擇和中間級選擇時所採用的簡單隨機或輪循方案的不足。
  6. The system has good adaptive ability : its control is still effective when the traffic flow and the basic vehicle exhaust changes and when some special traffic flows emerge

    該系統具有較好的適應性,對交通和車輛基準的變化、特殊交通等情況的出現均能實現有效控制。
  7. But now it ' s urgent to adopt new methods for calculating the head loss of regional drainage due to some factors such as long length, large flow quantity and probable strong topographic change

    由於存在管線長、大以及區域地形變化幅度可能較大等因素,建設區域水系統需要採用新的方法較為準確地計算水頭損失。
  8. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋式豎井泄洪洞應用於高水頭、大泄情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導洞改建,對高水頭( 252m ) 、大泄( 1400m ~ 3 s )條件下旋式豎井中的水運動特徵進行了比較全面的測,包括空腔形態、徑向速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水總摻氣估算方法,為導氣方案的設計提供了參考依據;六、在高水頭、大條件下,豎井空腔段下部速很高,盡管水螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  9. Standards for municipal wastewater discharge measurement. broad - crested weir

    城市堰槽測標準.寬頂堰
  10. According to the distribution peculiarity of the two characteristic moments, the accessibility of water quality in taizhou source of yangtze river has been analyzed based on the maximal contamination zone of entire tide and the relationship between the length of contamination zone and the pollutant load. simultaneously, every project has been analyzed and compared by using the model in wuli lake water environmental renovation for getting some theoretic gist and technical supports for the engineering

    在此基礎上進行泰州江段水水質數值模擬,建立污混合帶范圍與關系曲線,並對泰州江段供水水源地水質可達性進行了分析;將模型應用於五里湖水環境治理工程中,預測各引水方案下湖體水質狀況並進行各方案分析,從而為工程實施提供一定的理論依據和技術支持。
  11. During wet weather, the flows in the communal drainage system will increase substantially, thereby dispersing and diluting any wastewater therein. after the wastewater has been discharged into the sea, most viruses in the seawater will eventually be killed by the ultraviolet radiation of sunlight and therefore public health should not be affected

    在雨天時,由於水渠的水增加,渠內的污水會被收集到的雨水沖散及稀釋,到海里后,水中的病毒受到陽光中的紫外線照射一般便會逐漸死亡,所以不會影響公眾健康。
  12. The experiments include also two part, one is experiment of electromagnetic valve ' s flux character, the other is experiment of exhaust character

    通過測定電磁閥特性來控制二甲醚摻燒比例,通過測柴油機的放特性來確定二甲醚摻燒比例。
  13. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓滲場結點虛法的基礎上,結合可精細模擬密集水孔復雜滲水力行為的改進水子結構技術,付某地下廠房廠區洞室群圍巖區三維滲場進行了有限元求解分析,著重研究了防滲水系統中的帷幕和水幕的滲特性。
  14. Takes several energy saving measures for air conditioning system, nick a large capacity centrifugal chillers working with variable frequency nil capacity chillers, variable frequency and variable flow control on secondary pump water systems, cooling tower for four - pipe water system in winter, fan - coil unit for commercial peripheral zones aid all - air systems for interior zones, variable frequency control on supply and exhaust air fain, enthalpy control on fresh air cooling in winter and intermediate season

    採用了多項空調節能措施:大冷離心冷水機組搭配變頻小冷機組,二次泵變頻變空調水系統,四管制風機盤管冬季用冷卻塔換冷供冷設計,商業外區風機盤管、內區全空氣空調系統,送風機、風機變頻控制,過渡季、冬季利用室外新風通風降溫的焓值控制設計。
  15. By using a same boundary dimensions high efficient and new type copper exchanger substituted carbon steel oil condenser, and increasing flow rate of circulation water to reduce the temperature of freezing oil which feeds into compressor stage, to eliminate the malfunction during compressor operation, and improve running efficiency of the machine

    採取將碳鋼材質的油冷卻器更換成等外形尺寸的高效新型銅管換熱器、增加循環水的方法,降低了進入二段壓縮機冷凍油溫度,除了壓縮機運行中的故障,改善了機組的運行效率。
  16. Topics covered include : sorting ; search trees, heaps, and hashing ; divide - and - conquer ; dynamic programming ; amortized analysis ; graph algorithms ; shortest paths ; network flow ; computational geometry ; number - theoretic algorithms ; polynomial and matrix calculations ; caching ; and parallel computing

    課程主題包含了:序、搜尋樹、堆積及雜湊;各個擊破法、動態規劃、攤提分析、圖論演演算法、最短路徑、網路、計算幾何、數論演演算法;多項式及矩陣的運算;快取及平行計算。
  17. Thereby this paper puts forward four ways to reduce no, emissions : reduction of the highest combustion temperature, fuel emulsification, exhaust gas recirculation and selective catalytic reduction. according to the marpol convention, no, emissions are defined as per engine power of nox mass flow rate

    Marpol公約附則規定的no _ x的放標準為柴油機單位制動功率氣中no _ x的質(單位: g kw ? h ) ,因此要想對被測試的柴油機的no _ x放進行判定,必須得到氣中no _ x的質和柴油機的制動功率。
  18. Measurement of intake air or exhaust gas flow of diesel engines

    柴油機進的測
  19. Iso 7842 - 88 automatic steam traps ; determination of discharge capacity ; test methods iso 7842 : 1988 ; german version en 27842 : 1991

    自動凝汽閥.排流量的測定.試驗方法
  20. The design capacity of the communal drainage system is intended for handling the surface runoff arising from rainstorms, the volume of which is much higher than the volume of wastewater being inappropriately discharged into the drainage system. even though some wastewater may find its way into the communal drains, the drainage system which is serving a large catchment area should be able to handle it without increasing the risk of flooding

    公用水系統的設計,是要把大雨所引致的地面徑收集並走,其容排流量遠遠超過錯誤入的污水,加上集水區的面積廣闊,就算有污水錯誤入,公用水系統都足以應付,不會增加水浸的風險。
分享友人