採石坑礫石 的英文怎麼說
中文拼音 [cǎidànkēnglìdàn]
採石坑礫石
英文
bank run gravel-
In gravel stratum, the method combined soil nails and anchor pile is adopted in deep foundation pit bracing, it can obviously cut down engineering cost, raise efficiency and shorten construction period
在卵礫石地層中,採用土釘和錨桿樁聯合支護技術進行深基坑支護,節省工程投資,提高工效,縮短施工工期。Abstract : the traditional method of anchor pile on the deep foundation pit bracing in the gravel stratum with high hardness, poor drilling and easy slump is complicated owing to difficult construction, low efficiency and high cost
文摘:卵礫石地層硬度大,可鉆性差,易坍塌,這種地層的深基坑支護若採用傳統的錨桿樁,施工難度大,工效低,工程造價高。
分享友人