接力負載試驗 的英文怎麼說

中文拼音 [jiēzǎishìyàn]
接力負載試驗 英文
tensile load test
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 接力 : relay
  • 負載 : [電學] load
  • 試驗 : trial; experiment; test
  1. Then following reality constituent of engine and connecting component interface, a nonlinear signal cylinder engine model has been created, though fire interval and fire order, a control - oriented four cylinders engine is build. following dynamometer is seen as load, performance of engine is simulated and researched under the condition of constant torque and speed, validation of the math and simulation model have been confirmed by comparison result between simulation with test result of engine performance simulation software dyno

    按照發動機的實際組成,根據各部件的介面類型連模型庫中的部件,建立了單缸發動機非線性模型,在此基礎上,依據發動機實際發火間隔和順序,建立了面向控制的四缸汽油機模型,並以測功器為,通過恆轉矩和恆轉速方式進行了發動機性能模擬和研究,模擬結果和發動機動性能模擬軟體dyno測結果的對比證了數學模型和模擬模型的正確性。
  2. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、電氣強度、絕緣電阻、地連續性、泄漏電流、微波泄漏、功率、溫升、濕熱、灼熱絲、水平燃燒、垂直燃燒、漏電起痕、球壓、防雨淋、防濺水、粉塵、鹽霧、耐久性(壽命)、電機、電源線彎折、電源線提拉、拉扭、燈頭互換性、安全結構檢查等。
  3. Methods of test for ancillary components for masonry - part 3 : determination of shear load capacity of welds in prefabricated bed joint reinforcement

    圬工輔助成份方法.第3部分:預制床連處增強的焊剪切測定
  4. Standard test method for apparent shear strength of single - lap - joint adhesively bonded metal specimens by tension loading metal - to - metal

    用拉法測定單面搭粘結的金屬樣表面剪切強度的標準方法
  5. Used the metering - out control system in which the hydraulic cylinder was the executive element as research object in this thesis, the experimental research about the effect on the pressure p1, p2 of the hydraulic cylinder chambers when series - connecting throttle valve or governor valve on the return oil - line under the step load changing have made

    本文以單出桿液壓缸為執行元件的出口節流調速系統為研究對象,在其迴路上分別串節流閥和調速閥,當發生階躍變化時,對液壓缸兩腔壓p _ 1 、 p _ 2的影響進行了研究。
  6. Accorded to the experimental research, under different flow area of flow valve and different adjusted pressure of relief valve, conclusion that the regulation of the pressure p1, p2 in the two cylinder chambers varied with the change of step load were as follows : when the throttle valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod decreased, meanwhile, it ' s time of rise, time to peak and the governing time all decreased. while the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    通過研究得出系統在不同的流量閥開度、不同溢流閥調節壓(進口壓)下,液壓缸兩腔壓p _ 1 、 p _ 2隨階躍變化的規律:當出口節流調速系統的回油路上串節流閥時,隨階躍的增加,在相同流量閥開度、相同溢流閥調節壓的情況下,液壓缸有桿腔壓p _ 2 ( t )的超調量是減小的,上升時間、峰值時間以及調整時間也是減小的;液壓缸無桿腔壓p _ 1 ( t )的超調量是增加的。
  7. Plastics piping systems - end - load - bearing and non - end - load bearing assemblies and joints for thermoplastics pressure piping - test method for long - term leaktightness under internal water pressure

    塑料管道系統.熱塑性壓管用端和無端支承組件和頭.內部水壓下長期密封性的方法
分享友人