接樁 的英文怎麼說

中文拼音 [jiēzhuāng]
接樁 英文
pile extension
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  1. Specification for welded steel bollards - vertical type

    鋼系船規范.第1部分:立式
  2. Specification for welded steel bollards - cruciform type

    鋼系船規范.第2部分:十字形
  3. The program can analyze the coactions of pile and soil, simulate the process of construction, and consider the two dimensional biot concretion

    還可以考慮土之間的相互作用,在土之間設置觸面來模擬土與體的相互作用。
  4. Pass to analyze the cement powder spray a problem for reuniting the foundation sink to decline the calculation esse, the suggestion uses to sink to decline the proceeding correction to the bottom layer in response to the dint correction coefficient, its result with actual than near to, from but for the engineering ' s design with applied to provide the basis

    摘要通過分析水泥粉噴復合地基沉降計算存在的問題,建議用應力修正系數對下臥層的沉降進行修正,其結果與實際較近,從而為該工程設計和應用提供了依據。
  5. Contact nonlinear finite element analysis on the pressing block tooth in underwater skirt pile gripper

    基於觸的水下夾器壓塊齒非線性有限元分析
  6. But these were uncased auger-drilled poured pilings, with the grout in direct contact with the native materials.

    不過這些都是露出地面經鉆孔繞灌而成的,灰漿同天然材料直觸。
  7. B 160m of dual 2 - lane approach ramp of piled in - situ deck construction for connecting to existing roads in the lok ma chau control point ; 120m of two - lane overbridge for passenger vehicles

    興建一條160米長,現場基橋面施工的雙程雙線分隔駁斜道,以連高架引道至落馬洲控制站的現有路面
  8. They were ready to go to church ; the beautiful bride, mr. lorry, and miss pross - to whom the event, through a gradual process of reconcilement to the inevitable, would have been one of absolute bliss, but for the yet lingering consideration that her brother solomon should have been the bridegroom

    美麗的新娘羅瑞先生和普洛絲小姐都已作好去教堂的準備。經過了一個適應過程,普洛絲小姐已逐漸受了那無法逃避的事實,這婚事對她只剩下絕對的歡樂了,盡管她仍然戀戀不舍,希望當新郎的是她的弟弟所羅門。
  9. He climbed out and from hard saplings cut stakes and sharpened them to a fine point.

    他爬了上來,著從一些尖硬的幼樹上,砍下一些小,又把它們削得尖尖的。
  10. Angle joints with screw studs, with rivet studs

    用螺鉚釘螺的角形連
  11. Some conclusions are drawn : 1 ) effect of inertial force from superstructures on the lateral seismic response of single pile can not be ignored ; 2 ) the lateral seismic response of single pile induced by far - field earthquake are mainly affected by acceleration mass of superstructure > site eigenperiod. it increases with the increment of accele ration and mass of superstructure. as the site characteristic frequency approaches the self - oscillation frequency of the pile, sympathetic vibration occurs and the value of lateral seismic response reaches maximum ; 3 ) as the stiffness ratio of pile to soil increase, the relative displacement of pile to soil increases ; 4 ) the lateral seismic response of fixed - head pile is much smaller than that of free - head pile

    將其解析解與具體的的抗震設防烈度和場地特徵周期結合起來,計算分析了成層地基中單的橫向地震響應,得到了以下結論: 1 )上部結構慣性力對的橫向地震響應的影響不可忽略; 2 )成層地基中的單的橫向地震響應主要受地震基本加速度、場地特徵周期、上部結構質量的影響,隨地震基本加速度、上部結構質量的增大而增大;場地特徵頻率越基自振頻率,基地震響應越大,等於自振頻率時,由於發生共振現象,基響應幅值最大; 3 )土剛度比越大,土之間的相對位移的幅值越大; 4 )頂固的連方式,可以有效地降低地震時單的橫向地震響應。
  12. Going through the customs is a tiresome business.

    受海關檢查是令人生厭的事。
  13. But this method could n ' t reflect the influence of the variance of pile capacity on capping beam internal force and the partaking of soil to the load. combined with the item " the optimal design theory and research of pile capping beam " financed by natural science fund of hunan province, a new method which can consider the pile - soil interaction and tide over the disfigurement of the winkler soil model is used to adjust the foundation base reactions in this paper. by this method, the proper solution about the internal force of capping beam can be achieved and the relative stiffness and the relative position of soil spring are thought out well

    本文結合湖南省自然科學基金項目「基承臺梁優化設計理論與方法研究」 ,考慮梁下土體和基對承臺梁的共同作用,提出了能對梁下地基反力進行自動調整的一種新型方法,其克服了文克爾地基模型所存在的缺陷,該法在調整過程中,充分考慮了梁下各土體彈簧之間的相對剛度,相對位置,更近承臺梁的實際工作情況,有利於獲得承臺梁內力的正確解答。
  14. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔施工採用鋼筋砼護壁確保挖孔的安全成型,使用柔性連鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  15. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法施工,現實地解決了、土與筏板觸面的變形協調關系;通過對、土受荷過程的實際測試,得出了、土分擔荷載比例和變化過程,從而為、土的荷載計算提供實際依據;從設置的大量沉降觀測點中所得到的沉降資料,得出荷載、沉降變化規律,從而指導在實際施工中,防止加載過快而導致速沉,避免由此帶來的土體破壞的嚴重後果;通過沉降規律分析,得出了適用於軟土地區的基沉降計算方法,用於指導實際施工,以滿足沉降控制的強制性標準。
  16. Fem - based nonlinear contact analysis of pile - group soil in digang large - span project

    荻港大跨越群土非線性有限元觸分析
  17. The soil plug has an important effect on the pile driveability, and the pile diameter has an important effect on the property of soil plug, too. then the plugged effect judging method and nonlinear model of soil plug of the large ( super large ) diameter, super length, deep penetration pile have been established. hyperbolic model of soil plug was also proposed to calculate the inside static resistance

    3 .土塞對大直徑、超長的可打入性有重要影響,而徑大小直影響土塞特性,本文建立了大直徑(超大直徑) 、超長、深貫入土塞閉塞效應判斷方法和土塞非線性雙曲線計算分析模型,並提出了「內側極限摩阻力動態分佈」模式。
  18. 44 she had explained that interviews were the only way to keep the case in public consciousness

    她曾解釋道,見記者是使公眾不至忘卻這案件的唯一辦法。
  19. Shaking table testing of shock insulation by soft soil - hinged pier system

    接樁體系隔震性能的振動臺試驗研究
  20. The main steps of the rectification - joining method for broken tube piles were as follows : to rectifying sloping piles, closing cracks, concrete filling and quality testing, with some ways to deal with the problems during practical manipulation

    處理傾斜斷裂的管的糾直接樁法的主要實施步驟可總結為斜糾直、縫隙閉合、填芯補強和質量檢驗,並得出在具體操作過程中各種問題的解決辦法。
分享友人