接水 的英文怎麼說

中文拼音 [jiēshuǐ]
接水 英文
water impact
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. Roofing accessories. roof skylight with gutter and rain water head for slate and plain tiled roof tops. terminology. dimensions

    屋頂附件.石板或平瓦屋頂用帶接水槽和箱屋頂天窗.術語.尺寸
  2. Similar to the access pipe of the game to help small toddy to find him a good friend grindstone

    類似於接水管的游戲,幫助小toddy找到他的好朋友就是了!
  3. Introduction : similar to the access pipe of the game to help small toddy to find him a good friend grindstone

    類似於接水管的游戲,幫助小toddy找到他的好朋友就是了!
  4. In the early times, we once lived on a piece of land where there was a dilapidated house leveled almost to the ground. master was able to build a simple house on the remaining foundation and walls. she did everything herself, mixing concrete, laying bricks, plastering walls, setting up wooden frames, hammering big nails, and even doing the plumbing

    當時我們所住的那塊地上,有一處幾乎只剩地基的斷垣殘壁,師父就順著它所殘留的形勢在地上繼續蓋起一棟簡單的房子,從拌泥砌磚塊抹墻壁架木頭槌大釘接水管等等,無不親自動手。
  5. Roofing accessories. propped gutter brackets

    屋頂附件.英國式接水槽用支架
  6. Resistance welding equipment - secondary connecting cables with terminals connected to water - cooled lugs - dimensions and characteristics

    電阻焊設備.連接水頭的二次線電纜.尺寸和特性
  7. Water - cooled secondary connection cables for resistance welding - test requirements

    電阻焊接水冷次級線圈連電纜.試驗要求
  8. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引道,可連接水塘隧道的亞賓尼濾池及配庫,該引道用石及磚砌成,每天可輸700萬加侖; (三)位於亞賓尼渠東部的六個過濾池,該濾系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖,原過濾后,經一條直徑18寸鐵管,流入花園道與寶雲道交界的配庫。
  9. Does the detail drawing and common file fit each system arrangement ( light support, wet pan and so on )

    零件圖和通用圖是否與各系統圖(例如燈架系統、接水盤等等)相配?
  10. The u - shaped water traps of the water closets, the basins and the bathtubs did not have the same problem as these fixtures were frequently used

    接水廁、洗手盆和浴缸的u形聚器,由於經常使用,則不會出現相同的問題。
  11. You come here and make toilets, dig for water, plant trees, and build the meditation hall. you cut the grass, make the road, make the yard for people to sit in, and all the international people come here and enjoy. so, you pay the whole thing all in one go

    現在,我們在哥斯大黎加這里有一個道場,你們來這里蓋廁所接水種樹蓋大殿,或是割草鋪路蓋花園給大家休息,讓全世界的人都來這里享受,這樣就可以一次全部付清了。
  12. Iour company have designing and processing of ability and we can manufacture the various kinds melted - zinc - bath of specifications and shapes, and we also can produce the machine equipment, for example, there are a lot of stamping dies and stretching dies ect.,

    一根據用戶要求可製作各種規格形狀的鍍鋅鍋槽,備有全套沖壓和拉伸模具等加工設備,有先進的焊接水平,採用電弧氣刨來保證焊縫質量。
  13. The effects of direct water extraction, enzymatic hydrolysis and biological fermentation on the yield of water - soluble dietary fiber from rice bran were studied

    摘要研究了直接水浸提法、酶解法、生物發酵法對米糠溶性膳食纖維得率的影響。
  14. The results indicated that the yields of water - soluble dietary fiber from rice bran by direct water extraction, enzymatic hydrolysis and biological fermentation were 10. 78 %, 16. 32 % and 10. 28 % respectively, and the method of enzymatic hydrolysis was more suitable for preparation of water - soluble dietary fiber

    結果表明:直接水浸提法、酶解法和生物發酵法溶性膳食纖維得率分別為10 . 78 % 、 16 . 32 %和10 . 28 % ,酶解法更適合制備溶性膳食纖維。
  15. Does drain pots of wet pans match pit of building drawing

    池和接水盤與建築圖上的地坑相配嗎?
  16. Container terminals are the transportation hinge linking ocean and land, an important resource of one country, a door to foreign trade and have a key role to the development of district economy

    集裝箱碼頭是連接水陸的交通運輸樞紐,是一個國家的重要資源,是對外貿易的門戶,它對于區域經濟的發展具有舉足輕重的作用。
  17. Aiming at the great challenge of deepwater oil resource exploitation in 21st century china, this paper firstly explained contents of offshore engineering joining technology, then introduced a series of important technologies such as deepwater pipeline laying welding, local dry welding, underwater hyperbaric welding, and friction stir welding, lastly put forward countermeasures to develop offshore engineering joining technology in china

    摘要在解釋海洋工程連技術內涵的基礎之上,針對21世紀我國海洋石油開發深資源的巨大挑戰,對深海底管道鋪設焊、局部乾式焊下乾式高壓焊以後摩擦疊焊等重要技術進行了介紹,最後提出了發展我國海洋工程連技術的對策。
  18. In 1992 i visited a hill village in nepal called madan pokhara where sprinkler systems supplied from small reservoirs irrigated the farms

    1992年,我造訪了尼泊爾一個名為馬丹波哈拉的山村,當地農民利用?系統,從一個儲接水灌溉農田。
  19. Pick up cementing head

    接水泥頭
  20. The construction of phase iii started in september 1935 and was completed in 1939, when the third cross - harbour pipeline had been laid. this phase included the laying of twin cross - harbour pipelines that connected kowloon and hong kong island, the building of the tunnel and pumping station, the heightening of the main dam from 115 ft. to 275 ft. and the construction of an auxiliary dam, named the pineapple pass dam

    第三期工程於1935年9月展開,至1939年第三條海底輸管建成后才告完工,主要工程包括兩條連九龍至香港的海底輸管、連接水塘與供網路的輸隧道、抽機、主壩由115尺加高至275尺,以及興建82尺高的菠蘿凹副壩。
分享友人