接縫蓋 的英文怎麼說

中文拼音 [jiēféng]
接縫蓋 英文
joint covering
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • : 蓋名詞(姓氏) a surname
  • 接縫 : seam; jugum; joint; kiss; unwelded joint接縫刨 jointer; 接縫構造 seam construction; 接縫灌漿 joint grouting
  1. The pattern of the roof deck panels should be set out in accordance with the design of the finish mosaic tile layout in order to minimize clashes between the open joint lines and the mosaic tile joint lines

    為減小開放介面和馬賽克瓷磚的沖突,樓頂板面板的圖案應按照完工的馬賽克瓷磚的布局來進行安排。
  2. Our product range covers drilling and demolition, direct fastening, diamond and anchoring systems, firestop and foam systems, installation, measuring and screw fastening systems as well as cutting and sanding systems

    我們的產品范圍涵鉆孔與鑿破、直固定、鉆石與安卡錨栓系統、防火與發泡填系統、安裝、定位與螺絲固定系統,以及切割與砂磨系統。
  3. The kind of welding equipment is suitable forwelding the qarts in appplications of heat exchanger in - out water pipe port of electical heater and hot pipe fittings simple operation low lost and good seam foring are the advan tages. it is an essential and special equipment in the profression of tube - making electrical and solar water heaters

    該系列焊設備適用於太陽能熱水器端及水箱內受到影響上的進出水管、熱管頭、電加熱器頭及搪瓷水箱進出水管的自動化焊,焊盛開有美觀、效率高、成本上升低,是制桶業、太陽能熱水器、電熱水器等行業必不可少的專用設備。
  4. The conclusion of reappearing analysis is that crane bridge be used as usual because main weld maximum stress of upper cover plate of main beam lower than yield limit though it higher than permissible stress. inner stress of secondary beam was over ultimate strength, and deforming is ultra big. so it was unfit for produce and secondary beam must be changed

    再現分析得出的主要結論為:橋架的主樑上板主焊的最大應力超過了許用應力,但小於屈服極限,可以繼續投入使用;副梁內部的應力遠遠超過了強度極限,變形特別嚴重,不能滿足生產要求,因此更換新的副梁;端梁內部的應力超過了屈服極限,小於強度極限,在應力較大的位置焊補強板;投入使用后,要對整個橋架進行定期檢查。
  5. Terminal slot cover

  6. Mathematic mesh is composed of folded covers and could be random set by final user, and physical mesh is composed of real material boundary, joints or discontinuities, phase interfaces etc and could n ' t be artifical

    數學網格由折疊的覆組成,物理網格則由實際的材料邊界、裂、塊體、不同材料的交面甚至不同的材料相的界面等組成。
  7. It is realized with some dynamic web techniques such as java, jsp, and developed with the framework of mvc model and kona architecture. this system is an integration of many function modules, such as basic data management, mrp management, main production plan management, bom management, workshop flow plan management, etc., realizing the non - gap connection between network and business flows of production control, so that it makes scientific, electronic and net management of enterprise production control management

    系統採用了java 、 jsp等動態web實現技術,以mvc模型為開發框架,並利用kona應用程序開發體系,集成了基礎數據管理、物料需求計劃管理、主生產計劃管理、 bom管理、車間作業計劃管理等子模塊組成等功能模塊,覆了企業生產運作的各個環節,實現了網路與生產控制業務流程的無,構建了企業生產控制系統,從而實現了公司生產控制管理的科學化、電子化和網路化。
  8. The detail procedures of the loading test on the ultimate bearing capacity under different load cases and the author ' s first - hand experience during the tests are documented in the paper. based on the experimental performance, it has been verified that the superposed floor assembled by the precast - prestressed sandwich slab working under the design and the reliability of the lateral connecting character of the slab

    在板側內施加后張法無粘結預應力,在構造上利用板側伸出的鋼筋相互搭實現橫向傳力,變單向受力為雙向受力形成裝配整體式樓結構,可明顯改善樓結構的受力性能。
  9. Resilient floor coverings - determination of seam strength

    彈性地板覆物.強度測定
分享友人