控頂距 的英文怎麼說

中文拼音 [kòngdǐng]
控頂距 英文
distance of face roof under control
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (距離) distance 2 (雄雞、雉等的腿的後面突出像腳趾的部分) spur (of a cock etc )Ⅱ動詞...
  1. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據工程實踐,提出了用全站儀直接測量平、高差來代替測斜、天作四等及四等以下制網測量的理論依據和方法,並以張河灣抽水蓄能電站施工制網為例進行了比較計算。
  2. If increasing drawing interval, the movement and flow range of top coal will enlarge, and the velocity gradient on flow cross - section will diminish, so that it is good for controlling the flow rate of thin sand among loose top coal

    研究表明,加大放煤步煤運移流動的范圍變大,流動斷面內速度梯度變小,有利於制細砂的下竄速度。
  3. With regard to the second phase water supply pipe project of no. 4 dongguang waterworks, an introduction was given to the selection of pipe jacking system, measures for resistance alleviation, application of intermediate jacking room, and control of axes in jacking construction of long distance steel pipe with large caliber, these may provide the reference for the construction of resembling project

    摘要結合東莞市第四水廠二期給水管道工程過107國道段的管施工,介紹了大口徑鋼管進行長進施工時管機的選型、減阻措施的選用、中繼間的運用、軸線制等問題,可供以後同類工程參考和借鑒。
  4. The test results show that the drawing interval of 1. 5 m is helpful for controlling dead - unconsolidated thin sandstone of coal seam roof and reduce sand ratio of drawn top - coal

    試驗結果表明,放煤步採用三采一放有利於板極鬆散細砂巖,降低放出煤的含砂率。
  5. The general idea behind the second one is approximation. the control mesh is subdivided until the error between the control vertices and corresponding subdivision surface is less than a given threshold. then the vertices substitute those points on the surface approximately. the last step is to calculate offset point for every vertex and connect them to form an offset surface

    第二種演算法採用逼近思想,首先通過對制網格進行細分,當點和細分曲面的離滿足一定誤差要求時,近似用點代替細分曲面上的點,然後對各個點分別求等點。
  6. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強度)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊坡的土工格柵,在一系列拉拔試驗的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊坡模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊坡承載力與筋類、筋長、層間、坡角4因素的相關關系,獲得了在外荷載作用下加筋土邊坡的側向位移隨坡高的變化規律(並進行了定性解釋)和坡的豎向位移特性,並分析其主要制因素。
  7. Gets or sets the padding width for the top edge of a docked control

    獲取或設置停靠制項的邊緣的邊寬度。
  8. The slide mechanism mainly by pushing for and the hydraulic power system with the necessary supporting wireless sensor detection and computer control system and network components, equipment is small in size, light forces, carrying capacity, a high degree of automation, convenient operation flexibility, security and reliability, the slip lifting the weight of components, and standard features such as unlimited distance

    連續推機器人主要由推器、液壓動力系統以及與之配套的傳感檢測和計算機無線和網路制系統等組成,具有設備體積小、自重輕、承載能力大,自動化程度高,操作方便靈活,安全可靠性好,被滑移、升構件的重量、尺度和離不受限制等特點。
分享友人