插孔箱 的英文怎麼說

中文拼音 [chākǒngxiāng]
插孔箱 英文
jack-box
  • : 動詞1. (把細長或薄的東西放進、擠入、刺進或穿入; 插上; 插進) stick in; insert 2. (中間加進去; 加進中間去) interpose; insert
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • 插孔 : socket; jack; receptacle; hub; tip jack; plughole; rabbet插孔成型機 receptacle forming machine; ...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. About 355 guestrooms, included 10 apartment, 16 executive suite and 1 president suite. each guest room is furnished with electronic lock, energy - conservation fit, online computing jack, independence controlled air conditioner, hair - dryer, satellite tv, mini - bar and refrigerator. also, non - smoking room and disabled room

    其中包括10間公寓, 16間行政套間和1套總統套房。每間客房都配有電子門鎖節能裝置電腦上網獨立可調控空調吹風機衛星電視迷你酒吧及冰
分享友人