據預測 的英文怎麼說

中文拼音 []
據預測 英文
it is noted above that
  • : 據Ⅰ動詞1 (占據) occupy; seize 2 (憑借; 依靠) rely on; depend on Ⅱ介詞(按照; 依據) according...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • 預測 : calculate; forecast; prognosis; divine; forecasting; foreshadowing; predetermination
  1. A rare meteor shower is predicted to hit earth september 1, 2007. the meteors will appear to come from the constellation auriga, the charioteer, and so are called aurigids

    據預測2007年9月1日將會有一場罕見的流星雨降臨地球。這場流星雨看上去將會是來自御夫星座,所以它被稱為御夫座流星雨。
  2. The storm which drenched the florida keys is expected to swing out into the atlantic today and regain strength before heading georgia and carolinas

    據預測席捲佛羅里達基島的風暴今天會侵入亞特蘭大,在登陸喬治亞和卡羅來納前重新聚集能量。
  3. Chapter five describe the real example of the project of dwdm. related with the project of the east - north loop of fiber transmission system, research the layout of the network, analysis the performance of the transmission and bring out the frondose project of construction, inculde the number of the wave length, the speed of the transmission, the style of he fiber etc. chapter six is the summary of the article

    第五章是dwdm技術在通信工程建設中的實際應用,本論文以作者參與的一項具體的工程設計? ?中國移動集團公司建設的東北環光纜傳輸工程中dwdm技術的運用為實例,根據預測業務發展的要求,從傳輸性能的分析,到網路的規劃,技術上的實現,提出了其具體的建設方案,包括波長數目、傳輸速率、光纖類型、光復用段、設備制式等。
  4. For rotor steel ( 30crlmolv steel ), the tests of low - cycle fatigue property are done under different temperatures. the fatigue life under different temperatures is researched to make up for the defects of the testing for foreign similar materials. when pull - stretch data is attempted to evaluate low - cycle fatigue data, the result shows that four - point associated method in middle - low life zone is done well under room temperature, but there are large errors of four - point associated method and general - slope method under other temperatures

    在本文中,通過與國外同類材料的性能進行比較,國產材料與國外材料共有的材料特徵基本相同;對轉子鋼( 30crlmolv鋼)進行了不同溫度下的低周疲勞性能實驗,研究其在不同溫度下疲勞壽命,以彌補國外對同類鋼材試的不足;採用拉伸數據預測低周疲勞壽命時發現,室溫條件下用四點關聯法在中低壽命區較好,在高溫條件下四點關聯法和通用斜率法都有較大誤差,需要進行改進。
  5. ( 4 ) through level division of the predict result which favorable for mineralize district in the studied areas. we put up a graduate method which is used to divide graduations of statistical result. this kind of dividing method is different from traditional interval or non - interval graduate method, it can avoid a subjectivity for level division and is favorable to divide the high value of the result. ( 5 ) in the light of rank points and weight of the predicting factors, minerogenetic prediction map had been made. on the basis of the map, six favorable districts to mineralize had been determined

    這種劃分方法不同於傳統的等間距、不等間距劃分方法,避免了劃分的主觀性,更有利於對結果高值區域的劃分; ( 5 )根據預測因子的級別分數和權重,通過gis疊加分析操作,生成一系列的成礦系列圖件,根據預測圖件,在研究區圈定6個成礦有利區。
  6. It is predicted that the deltan people have less than 500 years before the greater radiation of their parent star makes geodesa uninhabitable

    據預測,德爾塔居民還有最多500年的時間,直至在巨大的輻射量致使該星球不適宜於人們居住。
  7. Based on prediction of wto, the number of international tourism allover the world is more than 1. 6 billion, and the amount of income is more than $ 2000 billion

    據預測,到2020年,國際旅遊人數將超過16億人次,旅遊收入將超過2萬億美元。
  8. Finally, it also discusses the sign ifi cance of thermal fluid flow to pool - forming dynamics : ( 1 ) provides a new ex planation way to abnormal vitrinite reflectance, which can enlarge the fields of hydrocarbon exploration and development ; ( 2 ) provides some important evidences to research of hydrocarbon migration, which support to choose exploration targ e ts ; and ( 3 ) provides means to study diagnesis and porosity evolution of reservo ir rocks, which can be used to predict the development units of deep reservoir s

    最後,探討了熱流體活動對成藏動力學研究的重要意義,認為其可為有機質演化異常提供新的成因解釋途徑,擴大油氣勘探領域;為油氣運移的研究提供線索,優化勘探目標選擇;為成巖-孔隙演化的動態研究提供依深部儲層發育層段。
  9. Moreover, special aspects of self - similar traffic are summarized. for long - range dependent traffic, two prediction models are given and discussed the prediction results can be applied to reduce loss ratio in allocation of memories in network nodes. the first model is farima ( fractional autoregressive integrated moving average )

    自相似業務流的長相關特性,本文重點討論了兩種數學模型,目的是用這兩種模型對自相似業務流進行,進而根據預測結果對計算機網路節點的存儲器資源進行合理的分配,使得丟失率達到最小。
  10. Estimate of future performance using currently - available data

    使用當前數據預測未來趨勢。
  11. Gmdh neural network application to prediction

    神經網路在數據預測中的應用
  12. By that time macau will become the far east las vegas

    據預測,未來兩年赴澳門旅遊的客人將增長到3500萬人次。
  13. It is predicted that there will be 5 scientific breakthroughs in the 21st century

    據預測21世紀科學將出現五大突破。
  14. It starts friday and forecasters are predicting a spate of named storms

    該颶風季周五開始,據預測將有一連串猛烈的暴風雨襲擊。
  15. It is predicted that 2008 will become a key year to popularize ftth applications

    據預測, 2008年將成為推廣ftth技術應用的關鍵時期。
  16. Fifty years from now, according to some projections, each hectare will have to cater for 43

    據預測, 50年後每公頃不得不滿足43人的需要。
  17. Fifty years from now, according to some projections, each hectare will have to cater [ 2 ] for 43

    據預測, 50年後每公頃稻田將必須為43個人供應口糧。
  18. Based on forecast, the third party logistics will be the main logistics form in 21 century

    據預測,第三方物流服務將成為21世紀國際物流發展的主流。
  19. Based on forecast, the third - party logistics will be the main logistics form in 21 century

    據預測,第三方物流服務將成為21世紀國際物流發展的主流。
  20. It studies the operation systems and the management systems of the investment project of road bridge. also it sets up the relative model of evaluation after the investment project of road bridge. it seeks for the scientific and reasonable quantification solution of the determination of the nature of target, then takes out the quantification analysis ; in the meantime, the forecast model of dynamical uncertainty sets up to predict the operational profits of the project in the future periods, so as to scientific evaluate and analysis to this project with the result of predict

    本文從路橋投資項目的特點入手,首先將后評價的視野向前後兩個方向深度拓展,研究了路橋投資項目后評價的監督機制、管理機制和執行機制,構建了路橋投資項目后評價的數學模型,尋求定性指標科學、合理的量化方法,並對其進行量化分析;同時,建立動態不確定性模型,對項目未來一段時期的運行效益進行,並根據預測結果對項目進行科學的評價和分析。
分享友人