攔河閘 的英文怎麼說

中文拼音 [lánzhá]
攔河閘 英文
regulating dam
  • : 動詞(不讓通過; 阻擋) bar; block; hinder; obstruct; hold back
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : anchor gate
  1. The old aswan dam was a barrage.

    老的阿斯旺壩是一個攔河閘
  2. Study on repair technique of sluice and dam destroyed by flood

    水毀攔河閘壩修復修補技術研究
  3. Design of energy - dissipating structure for wushi sluice rehabilitation

    烏石攔河閘除險加固工程消能建築物的設計
  4. Discussion on optimizing design of stilling pool in low - head sluice across river

    低水頭攔河閘消力池優化設計探討
  5. Study on renewal of gates and lifts of liuqiao sluice on tuhaihe river

    徒駭劉橋攔河閘門及啟閉機更新改造研究
  6. Discussion of the dam design and management from the danger occurring in jimei sluice

    從積美攔河閘壩出險談壩工程的設計與管理
  7. Causation analysis and rehabilitation technique research of flood damage in sanhe river sluice

    三合攔河閘水毀成因分析與改造技術研究
  8. Liuqiao sluice on tuhaihe river is a sluice with 10 gates built on the downstream of tuhaihe river in liaocheng city, which operates for many years

    摘要徒駭劉橋攔河閘是聊城市境內徒駭下游一座10孔節制,已運行多年。
  9. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘壩和八級抽水站。
  10. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  11. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建壩、橋梁、碼頭和其他、跨、臨建築物,鋪設跨管道、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的技術要求。
  12. The river had been dammed here to form three lakes.

    這條在這里用住,形成了三個湖。
  13. When building permanent dams and sluice gate structure on navigable or bamboo and log rafting streams, the construction unit must simultaneously build facilities for ship or log passage or, after being approved by departments authorized by the state council, take other remedial measures and also make adequate arrangements for navigation and bamboo and log rafting during the construction period and the initial filling period, and bear the expenses thereby incurred

    在通航或者竹木流放的流上修建永久性攔河閘壩,建設單位必須同時修建過船、過木設施,或者經國務院授權的部門批準採取其他補救措施,並妥善安排施工和蓄水期間的航運和竹木流放,所需費用由建設單位負擔。
分享友人