支撐橫支梁 的英文怎麼說

中文拼音 [zhīchēnghéngzhīliáng]
支撐橫支梁 英文
propping
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 支撐 : 1 (抵抗住壓力) prop up; sustain; support 2 (勉強維持) support; prop up3 [建築] strut; brace; ...
  1. It is 19. 5 meters high and 15. 6 meters around at the base. built entirely of wood, the vault is supported by eight pillars. the roof has no beams but only a great number of brackets entwined within each other

    它高19 . 5米,底部直徑15 . 6米,全木結構,殿頂由8根立柱,頂無,由眾多斗拱上疊,天花板層層收縮,構成美麗的穹窿式藻井。
  2. The medieval barn is held up by oak beams made from old ships ' timbers

    這個中世紀的谷倉是用舊船木的櫟木的。
  3. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層模體系及架施工,重點分析了轉換層結構現澆混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層體系的形式及構造,詳細論述了基於極限狀態設計的架計算方法,包括縱向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層架的施工荷載計算方法。
  4. Accessory support for floor board : adjustable support, cross girder, and buffing mat, with the support height : 150 - 350mm or decided by users

    地板架配套:按地板每平方米配套可調緩沖墊架高度可根據用戶要求確定。
  5. The crossbeam will support the rotating floor, the upright column and its moving while moving in the guide track

    既要轉臺、立柱及其運動,又要沿向軌道運動。
  6. A support for a beam in the framework of a building

    柱,桿建築物框架中
  7. It is necessary to study the construction technology of concrete cable bent towers. the dissertation introduces construction sequence, construction methods ( supporter construction, slip - form construction, climbing formwork and turn - over formwork construction ), anti - overturning measures of the tilted tower, crossbeams " construction and its bracing structure

    本文主要介紹了混凝土塔柱的施工順序、施工方法(架法、滑模法、爬模法和翻模法) 、傾斜塔柱的施工抗傾措施、施工及系統。
  8. Skid support : for accomodating the objects with feet and skids which can not be lifted onto the beam

    小架:用於防止有腳的物體或放不上的運物小架。
  9. As for different requiremint for the lustration rate, we can provide you round - hole 20 - 30 %, strip - hole 40 - 50 % perforated panel. stringer, pedestal and typical rod with high - mechanic strength and loading capacity

    針對各種潔凈室潔凈度的不同需求,可提供圓孔20 % ? 33 % 、條孔40 % ? 50 %開孔率的高架鋁合金通風地板。架、及特殊的斜設計為高承載,高強度奠定了堅實的基礎。
  10. On the base of the link ways of each member joint, the dissertation also puts forth a method to simplify the crossbeam bracing structure into spatial truss , spatial stiff frame and spatial combined structure

    體系根據各桿件結點的連接方式,多簡化為空間桁架、空間剛架或空間組合結構。
  11. Putting on their gloves all set to work in a row in front of the press, an erection formed of two posts connected by a cross - beam, under which the sheaves to be drawn from were laid ears outward, the beam being pegged down by pins in the uprights, and lowered as the sheaves diminished

    她們戴上手套,在機器的前面站成一排,就開始工作了。機器是由兩條腿起來的架子,兩條腿中間用一個連接起來,下面放著一束束麥草,麥穗朝外,用銷子釘在柱子上,隨著麥束越來越少,也就越降越低。
  12. The beam bears the whole weight of the upper floor

    這根著上一層的全部重量。
  13. Finally, based on the structure of the south cable bent tower and the construction technology of the jiangyin bridge, the computation of the bridge ' s crossbeam bracing structure is carried out and an analysis of the computation ' s results is also made

    最後,根據江陰大橋南索塔結構和施工工藝,進行了體系實例計算,並對結果進行了分析。
  14. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人