  1. For reinforcement concrete corbel with the shear span to depth ratio ( a / ho ) less than 1, has its performance of mechanics that is close to cantilever deep beams, it is an important kind of components in architectural structure which sustains roof trusses, brackets, tray " beams, frame " beams, wall " beams and crane " beams

    剪跨比a h _ 0 1的短鋼筋混凝土牛腿,其受力性能接近於懸臂深梁,在建築結構中是承屋架、屋面梁、托架、托架梁、框架梁、梁和吊車梁等的要構件。
  2. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁護結構」的發展、應用和優缺點;第二章分析其護機理、結構特點,並與土釘和無嵌入排樁多錨護進行了結構受力對比分析;第三章介紹該護結構的設計計算方法步驟,詳細介紹了護結構各部分的設計方法;第四章介紹預應力錨桿肋梁護系統最要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  3. Prestressed cable truss has some characters of transparency, safety, simplicity, dexterity, and beauty. due to these peculiarities there is a splendid prospect when the structure is used in the glass curtain. therefore, it is becoming warm and important problems to study its structural components and behaviors

    預應力索桁承體系具有通透、安全、靈活、工藝感強以及環保節能等諸多特點,決定了該體系在點式玻璃幕中具有廣闊的應用前景,因此,對其受力性能進行研究,日益成為結構工程學科研究的要方向和熱點問題。
  4. The heavy walls of the structure transmitted their loads to the steel frame, the columns of which collapsed.

    建築物的壁把它的荷載傳送到鋼構架上面來,構架柱已經被折斷。
  5. Concerning the tests, analyses, design and calculation of performances for light gauge steel framing, this paper focuses on following items : ( 1 ) the calculation of light gauge steel framed compound bearing walls ( lgsfcbw ) in compression and bending. based on north american specification and commentary for the design of cold - formed steel structural members, which was published by the american iron and steel institute, the detailed design requirements of wall stud assemblies are given considering the structural contribution of the attached sheathings and shear diaphragm is discussed briefly. then the calculational theoretic and method for sheathing braced wall stud assemblies complying with national code is brought up in compression and bending

    本文圍繞輕鋼龍骨體系結構性能的試驗、分析、設計和計算,主要進行了以下四方面的研究工作: ( 1 )輕鋼龍骨復合承載體的受壓、受彎計算:以美國鋼鐵協會發行的北美冷成型鋼構件設計規范及其規范說明為依據,點考慮罩面材料對龍骨設計的影響,給出了目前對承龍骨設計的具體要求,並對剪力蒙皮進行了簡要討論;然後提出了符合我國規范術語的剪力蒙皮作用的輕鋼龍骨復合承載體(即罩面龍骨)受壓、受彎的計算理論和方法;最後對提出的計算進行簡化,使之完全與我國規范相符。
  6. After current account ' s convertibility and before capital account ' s convertibility, in order to supervise balance of payment scientifically, prevent capital account fund flow into current account, strike foreign exchange flee, arbitrage and cheating, anti money washing, guarantee the stability of foreign exchange market and maintain the authenticity and safety of government ' s taxation base, current account ' s authenticity management is still of great essential to be the final " fireproof break " of foreign exchange management

    在經常項目可兌換后、資本項目可兌換前,出於對國際收科學監管、防止資本項目混入經常項目、打擊逃套匯與騙匯活動、反洗錢、保證外匯市場穩定以及國家稅基真實安全的需要,經常項目外匯真實性管理作為我國外匯管理最要一道「防火」仍有其存在的必要性。
  7. If serious, some irrational affairs may appear. as to some situations affecting the beauty of door appearance, explain to the user first and listen to their advice attentively and analyze the advantages and disadvantages to them. for example, if the wall is not vertical enough and it will cause bordures position leave the wall, leave the decision to the user and make analysis according to the situation of the scene

    沒有與顧客解釋疑點,造成顧客懷疑,嚴會造成顧客的挑剔並做出不合理的事情,應對會影響美觀的情況先和顧客解釋,並認真聽取顧客的意思,為顧客分析輕,例如顧客的面不夠垂直,會導致包邊位某邊離開面,應會顧客讓顧客作出決定,並按現場的情況作出分析。
  8. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘護的一階邊坡、二階邊坡進行分析,點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘護面板背土體中卸荷拱的存在對面板受力有利等結論。
  9. In the paper, the theory of access control 、 the concept of system call 、 the mechanism of loadable module and multiple security strategy framework - - gfac are introduced in emphasis. the paper also introduce particularly the architecture 、 function components 、 design and implementation of operating system firework and its each component " design and implementation

    論文點介紹了訪問控制的理論、系統調用的概念、可卸載內核模塊的機制以及多安全策略持框架gfac ;並詳細闡述了操作系統級防火的體系結構、各個功能模塊、設計與實現以及操作系統級防火各個組件的設計與實現。
  10. When there is original stage support only, the load ratio of surrounding rock gets more and more bigger with the increasing of crust stress, correspondingly, the load ratio of initial stage support gets smaller. when the initial stage support and the second support act each other, the load ratio of surrounding rock is more than fifty percent, and it has little change with the increasing of crust stress. the whole analysis of the surrounding rock and support shows that the bottom arch of liner and the feet of liner have serious stress concentration, so do the sidewalls and the foot of a wall of the surrounding rock

    通過屈曲理論分析結果對比表明,彈性屈曲和突變失穩分析的結果比非線性屈曲分析的結果要大得多,非線性分析由於考慮了材料非線性和幾何非線性,因而結果與實際接近實際;當只有初期護時,隨著地應力的增加,圍巖的荷載分擔率增大,相應地,初期護的荷載分擔率就減小了;當有初期護和二次襯砌共同作用時,圍巖的荷載分擔率在50以上,這一分擔率隨地應力的增加其變化不大;護和巖體的整體分析表明,襯砌底拱及拱腳處應力集中嚴,隧道巖體側角圍巖的應力集中也較大。
  11. By adopting the calculating analysis method of elastic - plastic three - dimensional fem numeric simulation, this paper makes a simulation analysis on the structure stability of the shallow cover and unsymmetrically loaded parts in tongyoushan tunnel, mainly simulates the effects caused by different construction orders on surroundings and supporting structure stability, and it centers on the analysis on the weak part, the midwall in the lining of the connecting - arch tunnel

    摘要採用彈塑性三維有限元數值模擬計算分析的方法,對桐油山隧道淺埋、偏壓地段結構穩定性進行了模擬分析,主要模擬了不同施工順序對圍巖及護結構穩定性的影響,點對連拱隧道整體襯砌中的薄弱環節中進行了分析。
  12. Under wind load, the horizontal displacement of the cable is a important index for the design of the support structure of point - supporting glass curtain

    拉索在受到風荷載作用后,產生的水平位移是玻璃幕承體系設計的一個要指標。
  13. The biggest stress of glass plate appears around the hole, so the loading properties of point - supporting glass curtain are influenced by the stress states of hole ' s edge significantly

    在風荷載作用下的其最大應力出現在孔邊,因此,孔邊應力狀態對點式承玻璃幕承載性能有非常要的影響。
  14. Reattach the unit to the wall bracket. reconnect the water supply and outlet piping as outlined on page 5 of this manual

    新安裝架。新按照本說明書第5頁的說明新連接冷水管道和熱水管道。
  15. To take an actual example, the triple pipe method has been adopted to consolidate the surrounding soil by rotary shot grouting pile and swaying shot diaphragm wall in the construction of vertical shaft and access drift of running tunnel from martyr ' s park to dong shan kou station in no. l line of guangzhou metro. it turns out that this method has met the double effect of both construction support and waterproof

    作為施工實例,在廣州地鐵一號線烈士陵園至東山口區間隧道的豎井及聯絡通道施工中,採用三管法對周圍地層實施了旋噴樁和擺噴加固,達到了施工護和防水止滲的雙效果。
  16. Soil - nail wall supporting technology formed a gravity earth retaining wall by embedding some given size and given density slender bars and sprayed concrete in reinforced soil

    摘要土釘護技術通過在被加固土體內植入一定長度和密度的細長桿件與噴射混凝土面板,形成了一個類似力式擋土
  17. The pile building enclosure with two or three bracing pieces and the gravity retaining wall are particularized as example in this paper. from the antithesis with datum practically measured, it indicates that the fem which is adopt by this paper is logical and feasible

    本文分別對兩道和三道撐的樁()式圍護結構及力式擋圍護結構基坑工程進行了有限元模擬計算,根據與實際監測資料的對比分析,表明本文所採用有限元方法是合理可行的。
  18. Furthermore, not all of network devices support snmp. for example, the early devices and nor - core devices ( ups, nas etc. ). if these nor - snmp devices want to be managed in the same platform with snmp device, the best way is to add a proxy agent between snmp manager and managed devices

    另一方面,並不是所有的網路設備都持snmp協議,如早期的產品以及一些非網路核心設備( ups 、附網存儲器等) ,還有一些要軟體服務(網路防火、數據庫等)也逐步被納入網路管理范圍之內。
  19. Fifteen degree or so of nail and anchor inclination is the optimized. some certain value of nail space is proposed by which soil nailing structure and earth nail wall can be differentiated. the method to analyze the gravity retaining wall is applied to earth nail wall

    建議土釘和錨桿傾角採用15左右為宜;當土釘間距小於某一值,或土釘密度大於某一定值時,土釘護形成力式擋土,即土釘,此時可以採用力式擋土的分析方法對土釘護進行分析。