改造太太 的英文怎麼說

中文拼音 [gǎizàotàitài]
改造太太 英文
better your better half
  • : Ⅰ動詞1 (改變) change; transform 2 (修改) revise; alter; modify 3 (改正) rectify; correct 4 ...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : Ⅰ形容詞1 (極高; 極大) highest; greatest; remotest 2 (極; 最) extreme; most 3 (身分最高或輩分...
  • 改造 : transform; reform; remould; remake
  1. The paper analysis the geological feature of wuyang iron doposit, it study the archean geohistory of wuyang iron deposit, the paper research the developed process of zhao - an iron deposit and tie shan iron deposit, matemorphic effect, oxidation remake process of the iron deposit

    摘要分析了舞陽鐵礦地質概況,追溯了舞陽鐵礦田古代古地史和趙案莊式鐵礦、鐵山廟式鐵礦的形成過程以及變質作用,氧化作用對礦床的作用過程。
  2. On tang tai - zong ' s reform on palatial poems

    論唐宗對宮體詩的
  3. Class was converted to metre gauge from 1067mm gauge and offered to japanese army. these locomotives was brought to china zheng - tai line and named pule - a class. in 1939 zheng - tai line was converted to standard gauge

    在日中戰爭時1938年與1939年, 60輛的日本國鐵c12型蒸汽機車為米軌提供跟日本陸軍渡海中國大陸,行駛正鐵路。
  4. Xelloss ' alternate design was inspired by cao pi from dynasty warriors 5 ( the yarmulke is a carryover from the parody christmas picture ) ; i didn ' t really have anything in mind for filia, so i just gave her a haircut and a variation of her funky hat

    賽羅斯的人物設計是從《三國無雙》里曹丕的樣式的到靈感的(他戴的圓頂小帽是從聖誕節搞笑圖"借"來的) ?以至於菲麗雅?我沒有多的主意所以我就只把她的頭發畫的比較短?然後把她的帽子了一下。
  5. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合鋼(集團)有限公司第二煉鋼廠主廠房由於生產工藝要求,加大多臺重型吊車噸位及bc跨( 1 ) ( 8 )軸線框排架各層豎向(設備)荷載后,對廠房結構,尤其鋼吊車梁系統進行檢測鑒定與加固設計的實際工程,首先對廠房結構進行了現場調研、技術檢查、測試以及內力和承載能力的計算與分析(考慮抗震) ,並根據檢測、計算與分析結果,對廠房結構、構件的可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  6. One of key techniques is to add a special little weaving beam on jat610 - 280 dobby to solve the tention difference between the fancy warp ends and ground warp ends, the other is to well match multi - weave and popular color of the fabric

    研發中的關鍵技術一是織物的多組織配合和流行色搭配,二是jat610 - 280型多臂織機,加裝一個特殊的小織軸,解決了花經和地經張力差異大的問題。
  7. At the same time, a lot of electrical energy is wasted when the level is high and the working curve is displaced. so urgent affairs are choosing right timing ways to rebuild the pumps. applying frequency conversion timing to wind machines and pumps is an important technology in our country

    設計都按照長江、漢水百年一遇最低水位選擇水泵出水揚程,這樣在高水位時往往由於揚程大而偏離水泵的工作高效區,浪費了大量電能,選擇合適的調速方式對泵船水泵機組進行節能,成為當務之急。
  8. In this scheme, ethernet is applied to infranet, and opc technology is used to data acquisition from local control unit. socket communication and java applet technology are used to realize real - time data exchange. according to the design project of hydro power remote monitoring and control system, a remote monitoring experiment system is designed in this thesis

    論文以水電站自動化項目為背景,設計了中小型水電站的遠程監控系統,提出了基於web的中小型水電站遠程監控系統的具體硬體結構方案和軟體的整體設計思路,控制網路採用工業以網,實現了控制網路與信息網路的融合,應用opc技術進行數據採集,使用javaapplet和socket通信技術解決遠程實時通信問題。
  9. From 1996 to 1998, as a project manager, i finished the studies on simple constructed venturi water film scrubber desulphurization technology and equipment for small and medium _ sized coal _ fired power plant. such studies are one of the projects required to rack one ' s brain with emphasis by ministry of science and technology in " ninth _ five _ year " plan. on the basis of the aboved researches, being entrusted with jiangxi provencial electric power bureau and guizhou provincial electric power bureau, we conducted the engineering feasible researches and preliminary design for nanchang power power plant and guixi power plant in jiangxi province, guiyang power plant in guizhou province, yongji power plant and taiyuan thermal power plant no. 2 in shanxi province to use venturi water film scrubber simple constructed desulphurization technology. the major technical targets of above consultation are around 70 % of desulphurization rate and improved dust removal efficiencies comparing with original efficiencies. the key features of this new technology are advanced and practical, low in investment cost, small in land occupied, suit for renovating the existing power plant and suited to chinese conditions

    1998年完成了"九.五"國家科技攻關項目< >的開發工作.在此基礎上,受貴州省電力局,江西省電力局,山西省電力局的委託,分別對貴陽發電廠,南昌發電廠,貴溪發電廠,永濟發電廠,原第二熱電廠等進行了簡易脫硫技術的工程可行性研究以及初步設計等.上述咨詢內容中的主要技術指標是脫硫效率達到70 %左右,並可提高原除塵器的除塵效率.有投資低,佔地面積小,適合老廠,技術先進實用等特點
  10. Modification of multicyclone in taigang sintering plant

    鋼燒結廠多管除塵器的及效果
  11. The great mystery of which the rhetor had made mention, though it excited his curiosity, did not strike his imagination as a reality ; while the second aim, the purification and regeneration of himself, had little interest for him, because at that moment he was full of a blissful sense of being completely cured of all his former vices, and being ready for nothing but goodness

    修辭班教師提到的一條重要玄理雖然引起他的好奇心,但是他不認為這是本質的東西,第二個目的:凈化和自己,使他不感興趣,因為他在這時分高興地感到自己完全糾正了從前的惡習,只要全心全意去行善就行。
  12. Darkness was about to fall, and when master saw that we were working too slowly, she chastised us severely and urged us on, telling us that building this creek would have a tremendous impact on the universe. only then did we hasten to complete the work

    當天色漸暗時,師父看我們的速度慢,便疾言厲色地催促大家,並告訴我們這條河對整個宇宙影響很大,我們這才趕緊加快速度。
  13. Since 1995, being responsible for the engineerings of researening and designing for esp are as follows : 1 ) the of esp in nanjing thermal power plant ; 2 ) the central controuing of esp in panshan power plant ; 3 ) the central controlling renovation engineering of esp in luohe power plant ; 4 ) the renovation engineering of esp in taiyuan second thermal power plant ; 5 ) the renovatiun engineering of esp in zhezhou aluminium plant ; 6 ) the central controlling of esp by remote in huaneng huaiying power plant ; 7 ) the central controlling of esp in xuzhou power plant

    自1995年至今,先後負責設計及實施了以下工程: 1 )南京熱電廠除塵器集散式控制系統工程; 2 )盤山發電廠電除塵器技術; 3 )安微洛河發電廠電除塵器集散式控制系統工程; 4 )原第二熱電廠電除塵器工程; 5 )鄭州鋁廠電除塵器工程; 6 )淮陰華能發電廠電除塵器集散式控制系統工程; 7 )徐州發電廠電除塵器集散式控制系統工程。
  14. This system plays an important role in the relative movement between the west pacific plate and eurasian continental plate. thus, the paleozoic structures had been modified

    此斷層系列對于西平洋板塊與歐亞板塊之間的相對運動起重要作用,於是古生代構帶被
  15. The north - eastern structural zones which become intensity from the western part to the eastern one in gansu show a influence of marginal - west pacific indosinian - yanshan tectonic - magmatic belt on the western part of china ' s continent, and not only a important regional metallization had developed but also early - formed minerals were intense changed and enriched with the tectonic - magmatic activity

    甘肅境內由西向東增強的北東向構帶,是我國東部濱西平洋印支-燕山期構巖漿活動帶向大陸西部的延伸表現;伴隨該期構-巖漿活動,區內發生了重要的區域性成礦作用,並使處于該期構活動帶的先期金屬礦產遭受了較強的疊加與再生
  16. With the substitutive inspection equipment of valve 120 - the laboratorial table 705, this paper analyzed the problems of the conflict between the standard concerned and self - performance of valve 120 when inspecting the rebuilt emergency valve of valve 120, and then proposed some improvement measures

    對其在120閥緊急閥后檢測時所出現的諸如試驗臺某些技術標準與120閥自身性能不相符等問題進行了分析,同時提出了進建議。
  17. One way is that the rail lines for high speed are built and the high speed trains are applied. the other way is that the existing railways are improved and the tilting trains are used. besause the tilting train can ensure the ride quality of passengers, improve the speed of curving and reduce the time on trip meanwhile and do not need too much cost the second way is accord with the situation of our country and railway

    列車提速有兩種途徑:一種是修建高速鐵路開行高速列車,另一種是對既有線加以,開行擺式列車。其中,擺式列車在保證旅客乘坐舒適性的同時,能夠提高列車曲線通過的速度,縮短旅行時間,而又不需要大的投資,符合我國的國情、路情。
  18. Improvement on coarse slime system in taiyuan preparation plant

    原選煤廠粗煤泥系統的技術
  19. Technical rebuilding of coarse slime recovery system in taixi coal preparation plant

    西選煤廠粗煤泥回收系統的技術
  20. Discussion on technical renovation of coarse coal slime treatment system of taiyuan coal preparation plant

    淺談原選煤廠粗煤泥系統的技術
分享友人