放置試驗 的英文怎麼說

中文拼音 [fàngzhìshìyàn]
放置試驗 英文
shelf test
  • : releaseset freelet go
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 放置 : lay up; lay aside; place
  • 試驗 : trial; experiment; test
  1. Place the tester adapter over the opening.

    器連接裝在加油口上。
  2. Those research results will be applied on some important civil engineering such as china national high level radioactive waste deposal, energy storage project, the deep exploitation of petroleum and gas, and the construction of the exceed deep and exceed long tunnel of “ south to north of water ” project

    開展大型材料模擬技術、節理巖體三場耦合理論和關鍵技術的研究,為國家高廢物處、能源戰略儲存、石油深層開采、南水北調西線超深超長隧道營建等重大工程服務。
  3. Place all testing devices on the testing machine in the following order : bearing plate, emery cloth ( with the granular surface facing upward ), the resilient pad to be tested, emery cloth ( with the granular surface facing downward ), short rail ( make sure the short rail is placed within the action area of the resilient pad to be tested )

    機上,安順序為:支承鋼板、砂布(有砂粒面朝上) 、被測彈性墊層、砂布(有砂粒面朝下) 、短鋼軌(確保短鋼軌在被測軌下彈性墊層起作用的區域) 。
  4. The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc

    分析表明,採用將淤閘布設在彎道上段的凹岸、彎道設溢流堰、淤沙條渠的合理分區和科學調度等措施,可以實現工程淤粗排細的目標。
  5. We select ni / cr alloy resistor as element together with ceramic embedding hearth ; select small flat - and - disc heat - even hubby ceramic sample holder, select ni / cr & ni / si thermoelectric couple ( type k ) as thermoscope with threads 0. 5 mm in diameter which is installed in the middle of the holders symmetrically ; select aluminum silicate fire - retardant fiber as materials for heat preservation ; design some hardware, for example temperature controller & transporter, signal amplifier etc ; design controlling curve to heat stove ; and introduce the method of least squares nonlinear regression and subsection function to deal with data. in order to obtain the reasonable operation conditions and operation curve, we have also done many theory analysis and experiment discussions

    通過理論和探討,選用鎳鉻合金電阻絲作為加熱元件,配以陶瓷質埋入式爐膛;選用陶瓷質小尺寸扁平?圓盤均熱塊體型樣品支持器;選用0 . 5mm絲徑鎳鉻?鎳硅熱電偶( k )作為測溫元件;熱電偶對稱安在樣品支持器容器的中部;選用硅酸鋁耐火纖維作保溫材料;合理選用和設計了溫度控制器、溫度變送器、信號大電路等硬體;採用升溫曲線來控制爐膛供熱過程;採用最小二乘法非線性回歸與分段函數相結合的曲線模擬方法,進行圖形處理。
  6. Its field trial showed that the free grain loss is reduced and sp ecially invented windrowing device closely behind the stripping rotor located ju stified itself by the clear cutting with shorter stubble and being center - deliv ered windrow of the straw

    田間表明落粒損失減少,作者發明的設於摘脫流通筒後面的切割摟集裝工作性能良好:割茬低條鋪在兩履帶之間。
  7. Rotation - cavitation mechanism was outlined based on the experiment results and the essential conditions for the occurrence of auxetic properties in polyolefin blends were concluded as followed : firstly there must be at least two phases, the matrix can be soft materials which were able to be networks when being stretched, as well as suitable consistence must be provided between two phases. fracture stress work measurement was optioned to characterize the force between two phases. finally, the auxtic property repeatability of the blends was measured and the fact that the auxetic property could only occur in the elastic range was certificated by the result that only the specimens which were stretched for 5s, 10s had repeatability after being retained for 1 months

    工作的最後一部分研究了體系負泊松比效應的可重復性,選取穩定的負泊松比共混體系在測數據採集時間為55 、 105 、 155 、 205條件下進行測,將樣條l天、 10天、 30天進行測,測結果表明,在5s 、 105條件下測樣在一個月後泊松比測結果具有可重復性,證實了體系的負泊松比現象發生在材料的彈性形變范圍內。
  8. Separately, we have also developed various schemes including taxi drop - off points and lifting many stopping restrictions. we shall be testing a pilot taxi pick - up and drop - off point scheme in march to further strengthen the role of taxis in providing point - to - point service

    另外,我們亦分別制訂多項計劃,包括設的士落客點、寬多個停車限制區,以及劃設的士上落客點等去加強的士點到點的服務。
  9. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強螺栓連接的實過程及實分析結果,介紹了各組件的形狀尺寸、加載裝、測量儀器安、測點的布等;給出加載方式及測出的m -曲線;計算出節點的初始剛度;推導水平集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。
  10. The experimental results show that the wave shaper can control the moving direction of the rod fragments after the warheads exploded and ensure the integrity rate of the rod and that there is a close relationship between the flight attitude and the positioned angle, which is mainly reflected by the rotation velocity of the rod

    結果表明:採用波形控制器可以較好地控制戰斗部爆炸后桿形破片的飛散方向,以及保證桿條的完整率;桿條的飛行姿態與角有密切關系,主要通過桿條旋轉速度表現出來。
  11. Test results indicated : with the hoist of altitude, the increase of ice amount and the rise of pollutant, the average flashover voltage reduced. the character exponent generally depends on the insulator profile, ice amount, ice state and pollution severity etc. by means of a high - speed camera, a data acquisition system and high voltage test facilities, a series of the flashover processes on ice surfaces were record. the experimental results form this study and the subsequent theoretical analyses suggested : the thermal ionization of the air in front of an arc root resulted in arc movement ; the electrostatic force had an auxiliary effect of impelling arc propagation ; the electrical

    通過對攝像機、數據採集系統及高壓記錄覆冰絕緣子表面閃絡電弧的發展過程的結果進行理論分析得出:弧根周圍空氣的熱電離導致了電弧的發展,靜電場力對電弧的發展起到了加速作用,電擊穿僅發生在閃絡最終的跳躍階段;通過測量閃絡過程中的電電壓、泄漏電流、閃絡時間、覆冰水電導率、電弧長度及電弧半徑等參數,得到了不同階段電弧(電弧起弧階段、電弧發展階段及完全閃絡)的發展速度、臨界電弧長度均隨覆冰水電導率的增加而減小。
  12. Discharge influencing factors of spark test device

    影響火花電因素的探討
  13. Through the theory of light radiation and intensity, we can use the fewest leds to satisfy the luminous intensity demand. through image segmentation theory, we can accurately pick module up from the test stripe when it is put in wrong directions. through image processing theory, we can acquire correct information and avoid the bad effects from the asymmetric chemistry reaction and instability of the devices

    用光的輻射和強度理論,我們計算出了獲得足夠圖像強度所需的最少光源;用圖像分割理論,我們在紙條傾斜或有垂直方向上的偏移時,準確地提取出了各模塊的數據;用平滑濾波和均值濾波理論,我們濾除了由於反應不均勻及硬體設備不穩定帶來的噪聲;用交遇區設計線性分類器的方法,我們降低了有限樣本設計線性分類器帶來的誤差,提高了檢準確度。
  14. Electrical disturbance tests for measuring relays and protection equipment. part 2 : electrostatic discharge tests

    量度繼電器和保護裝的電氣干擾第2部分:靜電
  15. Standard test method for measurement of smoke obscuration using a conical radiant source in a single closed chamber, with the test specimen oriented horizontally

    使用錐形射源在有水平樣的單一密閉室內測量煙霧蒙朧性的標準方法
  16. Nuclear instrumentation ; amplifiers and preamplifiers used with detectors of ionizing radiation ; test procedures

    核儀表.使用離子輻射探測器的大器和前大器.程序
  17. Adopt two kinds of match ways now : one send instruction carriage come to our company, we match in gui lin ; another is that we match the vehicle according to whole factory. there are the following several kinds of our match technological schemes mainly 1 tech. scheme

    為了降低摩托車的尾氣排污染物,我公司根據整車廠的需求,及各車型的具體排狀況,現採用兩種匹配方式:一種是整車廠發車來我公司,我們在桂林進行匹配另一種是根據整廠所要匹配車輛各零部件的配情況,我們沿用已有的成功匹配方案進行匹配。
  18. Reciprocating internal combustion engines - exhaust emission measurement - part 9 : test cycles and test procedures for test - bed measurement of exhaust gas smoke emissions from compression ignition engines operating under transient conditions

    往復式內燃機.廢氣排測量.第9部分:瞬時條件下工作的壓縮點燃裝的廢氣煙霧排床測量的循環和過程
  19. Fire - resistance tests - fire dampers for air distribution systems - test of thermal release mechanism

    耐火.用於空氣調節系統的防火閥.熱釋
  20. Charge and discharge operation test for battery and charge equipment

    蓄電池和充電裝的充
分享友人