數值變元 的英文怎麼說

中文拼音 [shǔzhíbiànyuán]
數值變元 英文
numerical argument
  • : 數副詞(屢次) frequently; repeatedly
  • 數值 : numerical value; numerial number; figure; magnitude; value數值表 numerical tabular; 數值天氣預報 ...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限方程的計算格式,為開發運用大型商用有限軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的化規律進行了研究,分析了加錨支護對隧洞圍巖應力、形的影響。
  2. In this paper, it is shown that some atomic formulas of symbolic states generated by the algorithms can be removed to improve the model checking time - and space - efficiency. such atomic formulas are called as irrelevant atomic formulas. a method is also presented to detect irrelevant formulas based on the test - reset information about clock variables

    一個時間自動機是一個五組n , l 0 , c , e , i ,其中n為一個有窮的位置集合, l 0n是初始狀態, c是一個取實的時鐘量的有窮集合, e ng c 2 cn是轉換的集合。
  3. The scielltific computational theories and methods on bird strike to the windshield of aircraft have been systematically studied and summed up in this thesis, such as fem comptltational principles and procedures to elastic dynamic problems under the conditions of small and non - linear finite deformation, 3d viscous elastic constitutive theory and incremelltal expression under the consideration of the rate effect of non - metallic materials like the aircraft windshield, and the numerical compatational principles and key constitutions for impact - contact dynamic subjects

    2 、系統學習並歸納總結了鳥體撞擊風擋結構問題中的科學計算理論與計算方法。按照鳥撞問題計算方法逐步深入的思路,系統總結了小形結構動力學有限計算方法、有限形的幾何非線性有限計算方法、粘彈性體非線性形的本構物理關系;對于實施復雜結構有限動力學計算的載荷增量方法提出了對newmark差分的改進以及進行材料與幾何非線性計算的細致步驟。
  4. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限模擬計算程序,在程序中考慮了各種溫控措施的模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表面噴水霧、施工汛期壩頂面過水等。
  5. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd模擬的方法對溪洛渡水電站主洞排風拱頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基模型,並回歸得到了溪洛渡水電站主洞排風拱頂各個排風「虛擬分支」風量均勻系以及阻抗的計算公式。
  6. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限計算分析,得到了地基土的應力和位移場的化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  7. Firstly, second harmonic component ratio and dead angles of two phase inrush ' s dispersion in three - phase transformes are acted as input variable. secondly, the method applies improved algorithm based on the original algorithm of multi - layer forward back propagation network, that is to say, adding last variational effect of weight value and bias value to this time and making use of variable learning rate. at the same time, this method also adopts dynamic form in the number of hidden floor node

    首先,文中將三相壓器兩相涌流差流的二次諧波含量比和間斷角作為網路的輸入量;其次,利用對原有bp網路訓練演算法基礎上的改進型演算法(即在計算本次權和閾化時增加上一次權和閾化的影響以及採用學習率,與此同時隱含層神經採用動態形式) ,通過樣本訓練使網路結構模型達到最優。
  8. 4. the principle of the experiment including the isdg method is introduced. and the effect of shape and distance of the indention on strain measurement is analyzed

    4 )介紹試驗設備的組成及試驗原理,通過理論推導和有限模擬分析了拉伸試樣的凹痕標記對應測量的影響,對isdg ( interferencestrain displacementgauge )方法進行了深入的研究。
  9. Using the thermodynamic conditions describing the coexistence of two phases and the stability conditions of equilibrium state, we have calculated the normalized temperature and the normalized pressure of the triple point ( t1, p1 ), the melting curve, vapouring curve and the sublimation curve. the whole phase diagram of the 2d monatomic l - j system is obtained

    和杜宜瑾等人的方法類似,我們先給出了系統在相點時的一些參,在此基礎上,考慮占據率q的因素,利用相平衡的熱力學條件及平衡態的穩定性條件,得到了二維單l - j系統的熔化曲線、汽化曲線、升華曲線以及三相點的位置,從而給出了該系統的完整的三相圖。
  10. Based on the back - analysis data of some excavation stage, through the non - linear finite element program nef, we can predict the tendency of next excavation stage. the relative error between calculation and measurement is controlled in 25 %, demonstrate the estimate prediction is successful

    根據反演的某一階段的土體參,通過非線性有限程序nfp ,預測后一階段的邊坡形情況,實例中理論計算與實測的相對誤差控制在25 %以內,說明預測是成功的。
  11. To solve these problems, a fem preprocessing system in materials joining process has been developed in this dissertation. based on this system, a welding numerical model of a missile ’ s oil box has been established and the structure ’ s distortion rules after welding have been analyzed

    本文針對這一現狀開發了一個專門針對焊接過程模擬的有限前處理系統,並應用該系統建立了某型號導彈油箱結構的焊接有限模型,分析了該結構的焊后形規律。
  12. The wavelet transform of quaternion value function

    的小波
  13. The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method

    本文通過大量的尾礦土物理力學性質試驗資料,建立了含水量與尾礦土性質之間關系曲線;分析了水在尾礦壩區的滲流規律和不同標高時浸潤線的化情況,為分析尾礦壩的穩定性提供依據;結合生產上的工程項目,從包鋼尾礦壩的穩定性研究入手,應用有限法,通過模擬分析了水對尾礦壩的靜力、動力穩定性影響。
  14. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演規律進行了有限分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  15. ( 3 ) by choosing core faultage of axial site in luohu fracture zone i. e. geological cross section in huangbeiling faultage f8 as geological model and utilizing finite element numerical method, change tendency of huangbeiling faultage f8 under self - weight stress and building loads is stimulated. and long - term development trend of fracture zone is also predicted, which has an important guiding meaning for works of geological disaster prevention in district of luohu jiancheng

    ( 3 )選取羅湖斷裂帶軸部的核心斷層?黃貝嶺f8斷層地質剖面作為地質模型,利用有限方法模擬了黃貝嶺f8斷層在自重應力和建築物荷載共同作用下的化趨勢,預計出斷層帶的長期發展趨勢,這對羅湖建成區的地質災害防止工作有重要的指導意義。
  16. Also, the thesis calculate and analysis the transverse deflection of steel box girder deeply in multiple factors. firstly, the article introduced the calculative methods and theory of local stress and strain of bridge structure. then program software system of finite element method was introduced. after that, the influential factors to the calculatial result and their values were analysed and suggested

    本文首先介紹了橋梁結構局部應力應計算理論和方法,對有限計算程序進行了介紹,然後分析了縱橫隔板設置、梁高及梁寬化等因素對鋼箱梁橋面板在恆載作用下的橫向撓度的影響,並將這些計算結果進行對照分析,從而找出了影響橋面板橫向撓度的主要影響因素,並得出了相應的可供工程實踐參考。
  17. From the feature of the force and deformation of the tpih, 5 different elements are used to mesh the different zones of the tube, which are structural beam 3d elastic 4, structural pipe plastic straight 20, structural pipe elastic elbow 18, structural shell elastic 4 node 63 and contact 3d pt - to - surf 49 ; the contact problem is assumed to be flexible - to - flexible ; the temperature field is assumed to be body load. a mechanical model corresponding to reality has been established for numerical simulation. based on the above, the 3 - d fem numerical simulation of tpih has been carried out by using the ansys program

    針對加熱彎管過程的受力和形特點,採用三維梁單、三維塑性直管單、三維彈性曲管單、三維殼單與三維點對面接觸單等5種不同的單分別對管毛坯不同區域進行劃分,並對接觸單採用柔體-柔體的處理方法,將溫度場作為體載荷處理,建立了符合實際的加熱彎管問題模擬力學模型:在此基礎上,應用商用軟體ansys對加熱彎管過程進行三維有限模擬與研究,獲得了成形時推力、彎矩、支撐力大小及其化趨勢。
  18. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井洞室結構,就兩種襯砌結構型式分別進行了高水頭作用下的有限模擬,從調壓井襯砌結構選型角度分析對比了兩種襯砌結構型式在圍巖及襯砌結構應力與形、襯砌結構鋼筋混凝土開裂、圍巖與襯砌結構聯合承載、結構安全儲備、經濟等方面的優劣。
  19. The first stage is primary slip then followed by secondary slip ; the last stage is due to dislocation passing the slips. the cyclic stress strain ( css ) curve exhibits a stronger hardening occurred in cyclic plastic deformation than that in tensile test

    建立了拉伸和應疲勞的有限模型,使用基於晶體滑移模型的方法,對晶體內部滑移系的啟動以及滑移繫上的分解切應、切應力這些無法試驗觀測的量進行計算,分析它們對晶體塑性形的不同影響。
  20. It dwells here upon the constitutive model of tlastic creep damage of heat resistant steel, establishing a corresponding variation principle and finite element discretization form, thus introducing complete numerical variational methods

    主要提出耐熱鋼的彈性蠕損傷本構模型,建立起相應的分原理以及有限離散化形式,從而形成完整的分方法。
分享友人