  1. Based on the analysis of mechanism for joint region, the " frame - wall " and " aslope compression stub column " mechanical models and yielding patterns of core zone of the joints are set up. the shear load - carrying formulation for joint core zone is also given in terms of plastic ultimate analysis. and then, the comparisons between the formulas given in this paper and that of chinese design code ( draft ) and nonlinear fem as well are presented

    對節點核區的抗剪,通過受力機理的分析,建立了鋼「框架剪力」加混凝土「壓短受力體系及其屈服機制,根據塑性極限分析,給出了節點核區抗剪承載力計算的迭加公式, 《規程》公式和非線性有限元近似模擬分析結果進行了比較。
  2. As the balancing platform tends to make the barycenter move backward, a more balancing stress distribution under the wall, a higher and steadier wall can be achieved. furthermore, the resupine back of the downward wall not only works reasonably, but also can reduce the amount of excavation and filling obviously. so gravity retaining walls with balancing platform are applied heavily

    衡重式擋土因具有衡重臺使身重后移、底應力趨于平衡,可提高擋土高度、增強體穩定性;且仰式下不僅受力合理、還可減少開挖與回填量等優點而被大量採用。
  3. The retaining wall reclining on the slight slope built on soft foundation is usually used in protecting the shore of river, the contradiction between the lack of impartiality in stress of the base and the small stress allowed by the foundation as well as the lack of stabilization of the breast wall is a hard nut to crack in the engineering. in the paper, a tenon - base is added under the base of the retaining wall, on the study of the choice of the parameters and formulas used in calculation and the research of theory used in calculation, method used to deal with the load, etc, the writer gives a way to crack the nut mentioned above paragraphs and presents a qualitative and quantitative analysis about them, such as the equivalent inner friction - angle ( d ) and the passive press of the clay ( ep ), etc. in the end of the paper, using modern optimization method, a design of the retaining wall reclining on the slight slope built on soft foundation is done, the result is economical, and accords with the fact

    軟基上的仰式擋土在水利工程河道護岸中經常遇到,仰式擋土基底偏應力較大和軟基土地基容許承載力偏小的矛盾以及擋土抗滑穩定不足是工程中難以解決的難題。本文在對仰式擋土設計中有關計算參數的選擇、公式的選用應該注意的問題進行了研究,對河道護岸軟基礎上的仰式擋土採用凸榫基礎處理的方法,就其計算理論、設計驗算中各荷載的具體處理方法進行了較為細致的研究,提出了解決軟基礎上的水工仰式擋土難以解決的難題的方法,並對有水情況下粘土等效內摩擦角_ d 、凸榫被動土壓力e _ p等在計算中的取值提出了定性和定量的分析。最後利用現代優化方法對軟基礎上的水工仰式擋土進行了結構優化設計,得出了符合實際的結果,與其它重力式擋土形式進行比較,取得了明顯的經濟效益。
  4. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,和壩基防滲的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土和壩基垂直防滲方案、瀝青混凝土和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲不同彈性模量對體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  5. Introduces some anti - seepage high embankment dams in the world with bitumen concrete inclined core wall, and analyzes, taking the existing maopingxi embankment dam as an example, the effect of slope thereof on the stress and deformation of the wall by non - linear adhesive elastic finite element calculation changing the type and thickness of the core wall

    摘要介紹世界上幾座瀝青混凝土斜心墻防滲高土石壩,並結合國內已建的茅坪溪瀝青混凝土壩,通過改變其形式和厚度,並用非線性粘彈性有限元對其進行計算分析,探討了斜心墻的傾率對的應力與變形的影響。
  6. To ensure the safety of the dam and provide the technology for the decision during the process of construction and store water. in this article, the elastic - plastic stress - deformation of dam is calculated and the consolidation is analyzed. including the rock - fill dam, the stress and deformation distribution of cut - off wall, the deformation of sloping core, the incresment and subduction of pore water pressure and the effective stress situation calculation

    為確保大壩安全,並為大壩施工期和蓄水期運行決策提供必要的技術支持,本論文根據上壩土料的應力一應變一強度特性、滲透和固結等特性,對壩體進行了彈塑性應力變形計算和固結分析,包括大壩堆石體、防滲的應力及變形分佈和斜心墻的變形、孔隙水壓力增長及消散和有效應力狀態計算等。