新項目向導 的英文怎麼說

中文拼音 [xīnxiàngxiàngdǎo]
新項目向導 英文
new project wizard
  • : Ⅰ形容詞1 (剛出現的或剛經驗到的) new; fresh; novel; up to date 2 (沒有用過的) unused; new 3 (...
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • : 動詞1. (引導) lead; guide 2. (傳導) transmit; conduct 3. (開導) instruct; teach; give guidance to
  • 項目 : item; article; clause; subject of entry; [體育] event
  1. By analyzing engineering manage mode and supervision market, considering the whole development of the building industry, this article draw these conclusion as follows : the thought mode of the engineering service should be developed from accepting passively the service claim to actively bring up the project intention to owner and guiding industry development by grasping the industry tendency ; the engineering service method should be changed from providing several independence engineering service to the integral complex service ; the engineering service object should be altered from only serving for owner to providing service to diversification customer ; the engineering service means should be altered from depending on the single software to manage the engineering to the management information system, then the supervision service can acquire new development

    通過對工程管理模式和監理市場的分析,從建築業整體發展的角度出發,本文得出如下結論即:工程服務思想應從被動接受服務請求掌握行業動並主動提出行業建設發展;工程服務方式應由提供多個獨立的工程服務提供一體化綜合服務發展;工程服務對象應從僅僅為業主服務多元化服務發展;工程服務手段應從依靠單個軟體管理工程管理系統信息化發展,唯此,我國建設監理服務才能走出發展的低谷,邁一個的發展階段。
  2. According supermarket for leading, high tech content, high adding science and technology for core, insist on innovation style, science and technology style, intensivism style ' s corporation development road, by getting up the corporation ' s core competitive power, to let the career of sunry always young

    以市場為,以建設高技術含量、高附加值的科技為核心,堅持走創型、科技型、集約型的企業發展道路,通過提升企業核心競爭力,實現聖雷事業基業長青!
  3. For details on deleting a custom wizard and removing the wizard from the new project dialog box, see

    有關刪除自定義和從「」對話框移除的詳細信息,請參見
  4. The plan is to finger out the laws and rules in favor of the venture capital ' s operation in order as soon as possible, establish the leading fund provided by government, offer governmental credit assurance and stock, reduce the tax to the high - tech enterprise, construct the polarizing investor frame including government, corporation, international investment company, achieve the legalization of private - collecting fund, quicken the course of endowment insurance fund of investment to the venture capital, that can solve the problem of capital shortage, to improve the rule - framework of the investment company, and expect to carry out the limited and partnership company. through the way of theoretics education and practice, introduce into the advanced technology and talent to promote the ability of investment specialist, strengthen the inspection to medi - agency and exploit the operation scope, bring forward a set of high - tech enterprise evaluating system suitable to choose the enterprise invested by the investment company. last, buy by corporation, and - techniqufi - and property right dealing market is the practicable exit channel comparatively

    即盡快制定有利於風險投資規范運作的法規及條例,建立政府基金,為高技術企業提供政府信用擔保、政府采購以及稅收優惠等政策支持;構造由政府、大公司、國際投資公司構成的多元化投資者結構,盡快實現私募基金的合法化,加快社會養老保險基金進入風險投資的進程,以此方式解決資金短缺的問題;在前有限責任和股份有限機構組織形式的基礎上,改善風險投資機構的法人治理結構,並建議早日實現有限合夥制組織形式;以理論教育結合實踐,引進國外先進技術和人才等方法促進投資專業人才能力的提高;通過加強對中介機構的監管和拓展中介機構風險投資中介服務,促進中介機構的建設,並結合實際提出一套適合於風險投資公司選擇投資的高技術企業評估體系;最後建議以大公司收購和技術產權資本交易的方式作為前較為可行的風險投資退出渠道。
  5. Use microsoft visual c 2005 to generate a new project of the same type, then either move your existing code into the new project or cut - and - paste the wizard - generated portions of the new project into the existing one

    使用microsoft visual c + + 2005生成同一類型的,然後將現有代碼移動到中,或將生成的部分剪切並粘貼到現有中。
  6. Second, with reference to western evaluations system and methods of vc, applying multi - layer structure analyzing method, the paper puts forward a feasible vc evaluation model

    其次,在借鑒西方風險投資評價理論及方法的基礎上,運用多層次結構分析法、分指標評價方法構建了適合我國國情的風險評價模式,在此,創性的提出退出評估原則。
  7. The canadian ambassador to china, joseph caron will be traveling to inner mongolia to review cida bilateral projects and visit field sites for the " biodiversity protection and community development project ", the " sustainable agriculture development project ", the " dairy cattle project " and introduce the small farmers in global markets project

    加拿大駐華大使joseph caron先生將到內蒙古參觀cida的政府雙邊合作:生物多樣性保護和社區發展可持續發展農業以及奶牛。同時還將藉此機會當地政府部門介紹啟動的小農戶適應全球市場發展,徵求在呼和浩特的自治區領的意見。
  8. If the wizard encounters a problem while creating the new team project, you will see an error message describing the problem and suggesting corrective action

    如果在創建的團隊遇到問題,您將會看到一條錯誤信息,該錯誤信息描述出現的問題並給出更正操作建議。
  9. If the wizard encounters a problem while it is creating the new team project, you will see an error message describing the problem and suggesting corrective action

    如果在創建的團隊遇到問題,您將會看到一條錯誤信息,該錯誤信息描述出現的問題並給出更正操作建議。
  10. The budget major new investment in education and skills such as the delivery of twenty first century facilities in primary schools and significant investment in further education colleges, and plans to enhance workforce skills including continued support for the employer training pilots

    該預算在教育和技能方面列出了的投資計劃,如小學提供具有21世紀水平的設施;大力增加對繼續教育大學的投資;並計劃提高勞動者的技能,包括繼續對「僱主培訓指的支持。
  11. When you create a new team project, the new team project wizard generates a set of standard reports according to the specifications in the process template

    建團隊時, 「建團隊」會根據過程模板中的規范生成一組標準報告。
  12. New team project wizard warnings and errors

    建團隊」的警告和錯誤
  13. Explains how to launch the new team build type creation wizard and how to select the solutions to build, the steps in the build process, and the drop location

    說明如何啟動「團隊生成類型創建」以及如何選擇要生成的解決方案,並說明了生成過程中的步驟以及放置位置。
  14. The project portal is a windows sharepoint services site created by the new team project wizard

    門戶是由「建團隊」創建的windows sharepoint services站點。
  15. Run the new team project wizard and create a test team project

    請運行「建團隊」並創建一個測試團隊
  16. The new team project wizard is used by project leads to create new team projects

    主管使用「建團隊」來創建的團隊
  17. When a new team project is created, the new team project wizard retrieves the list of process templates from the team foundation server, and then you must select one

    建一個團隊時, 「建團隊」會從team foundation server中檢索過程模板列表,您必須從中選擇一個過程模板。
  18. Create new project from existing code files wizard, which helps you port existing code into a new project

    「從現有代碼文件創建新項目向導」 ,可幫助您將現有代碼入到中。
  19. To start the bridge - creation process, select the java - com bridge project entry in the eclipse new project wizard, as in figure 2

    要開始橋的創建過程,請在eclipse新項目向導中選擇java - com橋,如圖2所示。
  20. When you create a team project, the new team project wizard creates a number of focal points by which to centralize the team efforts

    創建團隊時, 「建團隊」將創建一些關鍵點,通過這些關鍵點將團隊力量集中在一起。
分享友人