斷開的開關 的英文怎麼說

中文拼音 [duànkāidekāiguān]
斷開的開關 英文
open switch
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ動詞1 (使開著的物體合攏) close; shut 2 (圈起來) shut in; lock up 3 (倒閉; 歇業) close down...
  • 斷開 : break; discon; disconnect; disconnection; interrupt; off; open; opening; switch off; throw off; t...
  1. The design of rcd snubber and voltage feedback loop is introduced. finally, a 1kw prototype is researched and developed successfully to verify the operation principle of the combined converter

    該變換器中管實現了在零電壓下,而且其中兩個管在零電流零電壓下通。
  2. It only reports data about the disconnected context

    它只報告有上下文數據。
  3. In order to solve this contradiction, reservoir engineering methods are used to estimate the exploitation process about the block, which including water drive curve method, the correlation experience method, the method of the flow pipe budgetary estimate and the method of well net density. on the basis of these method, the author studied the macrocospical distributing of remaining oil in each layer

    針對單元發過程中存在突出矛盾,運用水驅曲線法、相經驗公式法、流管概演算法、合理井網密度法等油藏工程方法對發歷程進行評價,在此基礎上進行各小層剩餘油宏觀研究。
  4. Cut the wire and attach its free ends to a switch.

    把導線切,把兩端接到一個上。
  5. The concept of minimum distribution part ( mdp ) is put forward together with the adjacent table based method to divide a distribution network into several mdps. based on above theory ; a novel way to identify fault sections of a distribution network is presented. algorithm to isolate the fault section with minimum switch operations and identifying of over - tripped switches are discussed

    提出最小配電區域概念,並基於等長鄰接表數據結構建立了最小配電區域分解方法,在此基礎上發展了一種新穎配電網故障區域判和隔離方法,研究了以最少操作隔離故障區域方法和越級跳閘問題,探討了針對採用重合分段器配電網故障區域判和隔離問題。
  6. Standard for metal - enclosed low - voltage power circuit breaker switchgear - amendment 1 : short - time and short - circuit withstand current tests ; minimum areas for multiple cable connections

    金屬殼密封低壓電力線路路器設備標準.修改1 :短時間和短路可耐電流測試;多電纜連接最小區域
  7. With the development of the electronic technology, the higher requirements of power supply are raised including high efficiency, high power density, low emi and rapid dynamic response

    隨著電子技術發展,用設備對電源要求不提高,電源正向著效率高、功率密度大、可靠性高、電磁干擾低、無噪聲、維護方便方向發展。
  8. With the development of the electronic technology, the higher requirements of power supply are raised including high efficiency, high power density, low emi and rapid dynamic response. a hysteresis - band instantaneous current control pwm technique is popularly used because of its simplicity of implementation, fast current control response, and inherent peak current limiting capability

    隨著電子技術發展,用電設備對電源要求不提高,電源正向著效率高、功率密度大、可靠性高、電磁干擾低、無噪聲、維護方便方向發展。
  9. 5 all switch socket outlets and switches shall be labeled referencing each outlet to its respective breaker in the electrical distribution board

    控制箱中所有空氣路器都有標示其所聯和插座。
  10. And then, a segment feature extract algorithm based on etab ( sfe _ etab ) is proposed. the basic idear of this algorithm is to find the inflexion, end point and broken point in the thinned image by utilizing the specialty of which complicated segements naturally disassemble basic segements after etab thinned a character primarily. after that, it joins the segments to get the beeline corresponding to each segement

    在上述研究基礎上,提出了一種基於邊界細化筆段提取演算法,演算法基本思想是利用基於字元邊界細化演算法初步細化后字元中部分復雜筆劃已分解成筆段特點,找出細化圖像中拐點、端點、點;然後利用原圖連通系把基本筆段進行合併;最後進行筆段提取。
  11. In addition, with the development of the hydraulic technology, the experiment table may be in step with the developing need of the hydraulic teaching by applying the enlarged module of the plc and ameliorating the pc control program

    不僅如此,而且隨著液壓技術發展,該實驗臺可以通過增加可編程式控制制器量和模擬量擴展模塊,並且完善相應上位機數據採集控製程序,增加相應控制柜上所需按鈕,滿足不發展液壓教學需要。
  12. Serial - parallel combined two - transistor forward converter is presented for high input voltage and high power application, and the operation principle of the topology is analyzed in this paper. all switches are turned off with zero voltage switching, and the two switches of them are turned on with zero current and zero voltage switching. the difference of input capacitances, conducting voltage drop of switches, duty cycle and windings of the transformer of the combined converter influences the voltage balance of the input capacitors

    本文介紹了雙管正激變換器兩種穩定工作狀態,詳細分析了帶lcd無損箝位網路並?並組合式雙管正激變換器工作原理,該組合式變換器中管實現了零電壓,並介紹了該電路拓撲特點和lcd網路參數設計,採用pspice軟體進行了模擬和分析,最後,研製出一臺2 . 3kw樣機。
  13. From a switching pressure of 0. 3 bar and up to a maximum pressure of 400 bar, tecsis offers mechanical pressure switches as break contacts, make contacts or changeover contacts

    從0 . 3 bar到最大400 bar壓力, tecsis都能提供機械壓力,起到閉合和轉換作用。
  14. Interrupter switches for alternating current, rated above 1000 volts

    額定電壓在1000v以上選擇電流路器
  15. The system had auto startup and stop function by software. the dsp based motor control system had lower current harmonic, more efficient use of supply voltage than spwm, less switch loss. on the other hand, this system make a lower noise for the pwm modulation. frequency is up to 20khz

    本系統實現了電機軟啟動、軟功能,電機電流諧波失真較少,電壓利用率比常規正弦波脈沖寬度調制( spwm )有了較大提高,器件損耗也得到了明顯減少。
  16. Thirdly, the snubbers are designed to compress the switching voltage transient. when igbt is abruptly turned off, trapped energy in the circuit stray inductance is dissipated in igbt, causing a voltage overshoot and damaging igbt. this paper analyzes the principle of the snubber and discusses the impact of the parameters of the snubber on voltage overshoot

    針對igbt工作過程中出現電壓尖峰、電流尖峰和大損耗問題,本文首先從理論上詳細分析了igbt逆變橋緩沖電路工作原理,推導出緩沖電路各元件參數計算公式,討論了緩沖電路各元件參數對電壓波形影響並進行了模擬分析。
  17. Vacuum breaker is widely applied in the reactive power compensation as the switch of shunt capacitor banks, which will cause reignition and over - voltage after the switching performance gets deteriorated

    進行無功補償時廣泛使用真空路器作為並聯電容器組控制元件,其操作性能劣化后,突出表現就是極易發生重燃和操作過電壓危害。
  18. Utilities are faced with fault current which can exceed the rated capacity of the installed circuit breakers and other equipments. to correct this problem, a fault current limiter ( fcl ) is available

    而另一方面,系統容量擴大將直接導致短路容量增加,這對電網原有和新投運設備能力是一個嚴峻考驗。
  19. The act or an instance of turning off

    閉,閉、掉或行為或事例
  20. The substation fault diagnosis system runs on - line and in real time, which diagnoses the fault by the information of switch and breaker coming from scada. it also can tell the operator how to deal with the fault

    本系統知識庫具有很多特點和優點。該變電站故障診系統實時在線運行,它根據監控系統得到和保護動作信息來診故障,並提示運行人員應如何處理。
分享友人