方位及坡度 的英文怎麼說

中文拼音 [fāngwèi]
方位及坡度 英文
bearing and slope
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ動詞1 (達到) reach; come up to 2 (夠得上; 比得上) can compare with; be comparable; be up to ...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 方位 : position; bearing; direction; points of the compass; placement
  • 坡度 : falling gradient; slope; inclination; declivity; pitch; batter
  1. A i med at the badu ( k343 ) i arge seale i andslide in the nankun railway, geophysical exploration techniques such as seismic reflection of high resolution and geological radar are appi ied to detect the geologic characteristics of the landslide mass including 3d - conformation, perimeter, geometric parameters, si ippage pattern and distribution of displacement field in this dissertation. besides, acoustic method is used for detection of the former anti - slide piles and potency losing causations of the piles are analyzed and the sound geological conditions for upgrade of the piles are ascertained by the above investigations

    本文針對南昆鐵路八渡( k343 )大型滑,運用高解析反射地震、地質雷達等地球物理探測技術對滑體地質進行了詳細的勘測,揭示了八渡滑體的空間形態、邊界與幾何參數、滑動式以移場分佈特徵;同時,利用聲波探測對原抗滑樁進行了檢測,分析了失效原因,並查清了擬建抗滑樁地段的地質條件。
  2. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑體穩定性分析的綜合分析評價體系,並取得了如下幾個面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑形成或古滑復活的主要因素,一面是由於地下水升高降低了滑體的有效應力,另一面是由於地下水的長期浸泡降低滑體滑帶的力學強,這兩面的因素均將直接降低滑的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑體上的力系和庫水在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水、地震以庫水由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算法,使在庫區岸滑體穩定性分析評價時對計算工況選擇其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑體穩定性綜合分析評價系統,使對滑體穩定性分析計算更便、更準確; ( 5 )將上述滑體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑穩定性分析的具體事例中,分析結果表明,本文所提出滑體穩定性綜合分析評價法對三峽庫區的滑穩定性分析是實用可行的。
  3. Based on an analysis of dynamic conditions for migration and precipitation of gold grains in water system and their diffusion in soil, this paper has advanced a discriminant formula for surfacce ore potential of gold anomalies from 1 : 50000 stream sediment survey, recounted methods for estimating the highest gold grade ores within the anomalies, calculated the discriminant indices for qinba area, and summed up index characteristics of ore - induced gold anomalies in 1 : 10000 soil survey, estimation formulae for orebody location as well as coefficients and constants of slope angles of various orders and grades

    摘要在分析金粒在水系中運移、落淤和在土壤中擴散動力條件的基礎上,本文建立了五萬分之一水系沉積物測量金異常地表含礦性的判別公式,闡述了推算異常內礦石最高金品法並計算了秦巴地區的判別指數;總結出萬分之一土壤測量礦致金異常的標志特徵、礦體定的估算公式各級次地形角的系數和常數。
  4. Inversion analysis of measured displacements is used extensively in geotechnical engineering, structural engineering, information construction, and trauma diagnosis, etc. in this dissertation, parameters identification of original geostress and medium physical property in cavern, slope, tunnel and dam are taken as a cut - in point. macroscale inversion analysis of displacements and numerical solutions of inverse problems of mechanics are researched profoundly. scientific theories of multiscale problems are connected with numerical inversion approaches

    本文以地下洞室、邊工程、隧道工程與大壩等領域的初始地應力參數和介質物性參數識別為切入點,對宏觀尺移反演分析和力學反演問題數值求解法進行了比較深入的研究,並將多尺問題科學理論和反演數值法聯系起來,初步探討了結構性承載材料(如巖石、骨材料等)的多尺力學模型其反演法。
  5. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高,涵洞截面尺寸,溝谷底部寬,溝壁角,填築體性狀,施工速,地下水對豎向移場涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填涵洞頂部土壓力簡化計算法。
  6. Maxwell ' s equations conserve certain properties ? the magnetic field intensity, the electric displacement field and the poynting vector that describes the electric flux of an electromagnetic field

    麥克斯韋程中有某些特性是恆定不變的磁場強、電移場以描述電磁場電通量的印廷矢量。
  7. In the process of investigation and practice of exploration project, qinghai oilfield company insists closely aiming at the exploration targets, paying much attention to prophase preparation and exploration benefit, resolves the problems such as project goal being not clear and not careful management, increases thy geophysical exploration load and strengthening the explored well location argumentation white project arranging and implementing, introduces and applies in time some available technique and method to ensure the effect of exploration, and as a result, a passel of litho - stratigraphic traps such as the southeastern slope of gasi, qigequan and hongliuquan have been discovered

    摘要青海油田在勘探項目管理的探索與實踐中,按照「緊密圍繞勘探目標、注重前期準備、注重勘探效益」的工作思路,糾正了項目目標不明確、管理不精細的問題,在項目部署和實施上加大了物探工作量和探井井論證的力時引進和推廣應用了適用的勘探技術、法,保證了勘探效果,發現了尕斯東南斜、七個泉、紅柳泉等一批巖性地層圈閉。
  8. The control of the deep - seated structural - magmatic process over the metallogenic system around the middle - lower yangtze river reaches is shown as : ( 1 ) the mantle uplift belt is closely related to the general geological background of the metallogenic system ; ( 2 ) the primitive magma originated from different parts of the mantle uplift belt ( mantle ridge or mantle slope ) shows differences in style of formation and composition and results in different magmatic series and metallogenic subzones, respectively ; ( 3 ) the varying depths of structural - magmatic chambers may form a " three - layered structure " ( central type, network - like and ring - like ) and this is the primary factor that controls the different magmatic series and the concerned cluster of ore deposits ; ( 4 ) the alkaline basaltic magma derived from the mantle ridge forms high - potassium and calcium alkaline magma and shoshonitic magma due to its altering intensity of afc process with the lower crustal material, which has something to do with the copper - gold and iron - sulphur metallogenic subsystems, respectively

    深部構造巖漿作用對長江中下游成礦帶安徽沿江地區成礦系統的控製表現為: ( 1 )地幔隆起帶與成礦系統的總體地質背景的演變密切相關; ( 2 )源於地幔隆起帶不同部(幔脊與幔)的原始巖漿,其生成式和物質組成不盡相同,它們分別產生相應的不同巖漿巖系列和成礦亞帶; ( 3 )不同深的構造巖漿房組成中心式網格式環帶式「三層結構」 ,是控制區內不同巖漿巖系列有關礦床集中分佈的主要因素; ( 4 )源於地幔隆起帶脊部的堿性玄武巖漿,由於與下地殼物質發生的afc作用強不同,形成了高鉀鈣堿性巖漿和橄欖安粗巖漿,分別與銅、金成礦亞系統和鐵、硫成礦亞系統有關。
  9. Considering the contents of slope model, practice of slope engineering and the present research situation on models for slope and their application situation, this paper puts forward a geological engineering model for slope, and states its definition, contents and establishment methods. this paper then points out, firstly, that the geological engineering model for slope is the product of the unification of engineering and geological conditions of slope, which are complemented to and interacted with each other ; secondly, that engineering conditions are vital in this model, and the stability of slope is up to the coupling degree of engineering conditions and geological conditions, which increases as the degree grows and decreases as it lowers

    從模型的內涵和邊工程的實際出發,根據目前邊中模型的研究和應用現狀,提出了邊地質工程模型,並論述了邊地質工程模型的含義、內容以建模法,指出邊地質工程模型是邊工程條件和工程地質條件一體化的產物,兩者相輔相成、互饋作用,工程條件在邊地質工程模型中有著重要的地與作用,邊的穩定性取決于這兩個因素的耦合作用程,耦合程越高,邊越穩定,反之越不穩定。
  10. In numerical calculations, the effects of rainfall pattern, shape of slope layer and changing slope to the development and decline of subsurface flow were examined

    數值計算驗算了降雨的式,斜地層的形狀以的變化對地下水進展和衰退過程的影響。
  11. Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter

    龜山滑於寶泉抽水蓄能電站引水發電系統下庫進出水口的上,滑體長550 800m ,寬260 350m ,最大厚210m ,平均110m ,總量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫整個電站的安全。
  12. The overall fill amount of the airport is 1091. 2347 noyriastere and the height of the fill is almost 60m, with pertains to the high fill projects of the airport, whose site to prography and lithology is very varied. the basement of the till area is a slope dip place of slow dip downhill roch. there the research on the stability of the side slope filled is very necessary, this is because not only the design construction operation and investment of project is under influence, but also the feasibility of the projecct is also restricted, which is the key of the successful construction of the airport

    為開發資源,改善投資環境而興建的荔波機場於貴州省荔波縣東北約12km ,機場總填量1091 . 2347萬m ~ 3 ,填近60m ,屬高填機場,其場址地形巖性復雜,填區基底為緩傾角順巖層的斜地區,因此填的穩定問題研究是十分必要的,因為不僅影響到工程設計、施工、運行和工程投資,甚至制約著工程的可行性,是機場安全順利建設的關鍵。
  13. In this dissertation, rainfall infiltration, runoff, and soil water redistribution on a hillslope were studied by simulated rainfall experiments, and soil water cycling was investigated by site observation and soil sampling methods. moreover, the reasons for the desiccation of deep soil layer were analyzed, and its assessment indexes and standards were presented. the main results are as follows : ( 1 ) rainfall infiltration into a planar hillslope with a homogeneous isotropic soil could be simply regarded as one - dimensional infiltration process, if soil erosion was prevented

    針對當前該區植被恢復重建中存在的科學問題,以植被建設的關鍵性限制因素?土壤水分為出發點,通過室內外模擬降雨試驗,研究了地降雨入滲、產流土壤水分再分佈規律,同時採用定觀測和采樣分析相結合的法,分析了地土壤水分的循環與轉化特徵,並初步建立了深層土壤乾燥化程的評價標準,取得的主要結論如下: ( 1 )在防止土壤侵蝕的條件下,均質地的降雨入滲過程可以簡化為一維。
  14. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊的土工格柵,在一系列拉拔試驗的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差回歸分析法,探討了加筋土邊承載力與筋類、筋長、層間距、角4因素的相關關系,獲得了在外荷載作用下加筋土邊的側向移隨高的變化規律(並進行了定性解釋)和頂的豎向移特性,並分析其主要控制因素。
  15. A new method for stability assessment of the slope was proposed so as to give rise to reliability of the numerical simulation, which estimated the stability of the slope through the comprehensive analysis of the movement trend of velocity at the tracing points in the model, the failure zone as well as the displacement

    在判斷邊的穩定性時提出了一種新的判斷法,即運用邊移動速的變化趨勢結合邊移量以破壞場范圍判斷邊的穩定性,提高了數值計算分析的可靠性。
  16. Transit and rail industries in many nations have already adopted the digital system as their regular radio communications system. in asia for example, the digital trunked radio system has already been adopted for system expansion or replacement by several organizations. these include the transit northeast line in singapore 1991, the mass transit system smrt in singapore 1998, the high speed railway in malaysia 2000, the guang - zhou subway in china 2000, the west line of guang - jiu railway in china 2000, the peking light railway in china 2001, and the new delhi transit system in india 2001

    據了解現在各國新建捷運路網無線電系統規劃式,有往數干線式無線電系統發展之趨勢,並且已成各國捷運鐵道工業無線電通信的主流標準,以亞洲為例:新加捷運東北線( 1998年) 、新加高運量捷運smrt ( 1998年) 、馬來西亞快速鐵路( 2000年) 、中國廣州地鐵( 2000年) 、中國廣九鐵路西線( 2000年) 、印德里捷運( 2001年) 、中國北京輕軌系統( 2001年) .均已於系統擴建或新建時規劃採用數干線式無線電系統。
  17. This thesis puts forward a systemic method to analyze stability of bridge bank slope in gorge area. it includes elementary field geological evaluation, calculation of stable angle of bank slope with empirical formula, simulation of slope stress state with fem and rockmass strength judgement. then rational laying position of bridge piers can be confirmed

    本文提出了峽谷區橋基岸的穩定性分析的系統法,包括野外初步地質評價、經驗公式法確定岸穩定角、岸應力場的有限元模擬分析,進而綜合評價岸穩定性,並確定橋基合理埋置置。
  18. Earth embankment and geogrid reinforced embankment with various slope, various spacing and length of the reinforcements, various heights were calculated by fem. each factor ' s influence on the tensile stress of the geogrids, the stress and displacement distribution in the cross sections of embankments and the response of foundations were analyzed

    採用有限元理論與法對不同高、不同邊、不同加筋密、不同加筋長的土工格柵加筋路堤不加筋路堤進行了計算與分析,研究了各因素對格柵內拉力分佈、路堤橫截面上應力分佈的影響以地基的響應情況。
分享友人