方案比較法 的英文怎麼說

中文拼音 [fāngànjiào]
方案比較法 英文
scenario comparison method
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : Ⅰ動詞1 (比較) compare 2 [書面語] (計較) dispute Ⅱ副詞(比較) comparatively; relatively; fair...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  • 比較 : 1 (對比) compare; compare with; contrast; parallel (with); comparison; by comparison; in comp...
  1. Method of addition evaluation and evaluation assessing indexes are introduced to compare and discuss how the different fixed property depreciation affects the project plan, and assess the projects scientifically and objectively, it also forms a base for later use

    這里選用增量的評價和評價指標,進行多並討論不同的固定資產折舊的影響,對該項目進行科學、客觀的評價,為項目中後期的實施奠定基礎。
  2. Abstract : large time delay exists in complicated practical processes. for example, in fccu ( fluidized catalytic cracker unit ) reactor - regenerator, the feed is preheated through heat exchanging from fractional column slurry, thus results in large time delay. a predictive control system is designed for such processes, where the kernal algorithm is dynamic matrix control. application results show that the control behavior is improved than original pid control

    文摘:實際的復雜工業過程,往往具有大的時滯,例如:煉油廠催化裂化裝置的反應再生系統,其原料油預熱通過油漿換熱實現,因此時滯特別大.本文針對這一類大的時滯過程,設計了以動態矩陣控制為核心演算的預測控制系統,運行實踐表明:這一控制原pid控制在控制質量上有大提高
  3. This paper referred to the massive domestic and foreign technical material, elaborated in the sheet forming value simulation theory essential technology in detail, points out when analysis sheet forming question should use the big distortion ball plasticity fem and introduce the application characteristic and the function summarizes of the sheet forming simulation software dynaform. secondly, analyzed the cover forming characteristic, simultaneously introduced the influence cover forming factor in detail : such as ramming direction, the craft addendum surface and the material pressing surface, the radius of convex - concave mold, draw bead, pressure strength, blank size and craft margin and so on. and simulates many typical automobiles cover panel with software : such lateral board, back taillight pedestal and storage cover

    其次,分析了覆蓋件成形的特點和要求,同時詳細介紹了影響覆蓋件成形的因素如沖壓向、工藝補充面和壓料面、凸凹模圓角、拉延筋、壓邊力、坯料尺寸和工藝切口等,並用數值模擬軟體對多個典型的汽車覆蓋件汽車后側圍板、后燈座以及轎車后備箱蓋的沖壓成形情況進行模擬,用模擬結果優化拉延工藝了內覆蓋件和外覆蓋件在成形特點和要求的一些異同點,以及常見的起皺、拉裂和回彈、成形不足等缺陷的產生機理和相應對策,重點介紹工藝補充面和壓料面的設計及優化,因為拉延是沖壓工藝的關鍵工序,而工藝補充面和壓料面的設計是拉延工序的關鍵,對消除缺陷至關重要。
  4. By reading literatures, sorting out materials and analyzing cases, with comparison method and balancing of interest, the author draws her own conclusions through comparison, analysis and induction

    本篇論文的主要研究是以文獻閱讀、資料整理和例分析為基礎,運用和利益衡量的研究,通過、分析、歸納,得出自己的結論。
  5. The comparison of constructive programs with shallow burying method and subsurface excavation method at ciqikou station in beijing metro

    北京地鐵磁器口車站淺埋暗挖進洞施工
  6. According to this kind of comprehensive evaluation of technical economy, there are little mature theory and comparative analyses approach in the world

    對于這類技術經濟綜合評價,目前國內外還沒有一套成熟的理論和選分析,我國更是尚處于初始階段,積累的經驗也不多。
  7. Focusing on this changing course of development and insisting on the guidance of historical materialism and method theory, the thesis attempts to make use of the method of document, analysis & compare, case, and necessary quantitative, to trace, dissect and comment the evolution track, main content, formulation & implement, effect of primary and middle school teachers laws and regulations. under the grand background of national politics, economic and culture, the thesis explore the inner relationship and interaction mechanism between ruling education by law, ruling teachers by law and education development to be helpful for nowadays chinese reformation of primary and middle education

    本文試圖完成的任務是:全程聚焦于這一動態的發展過程,堅持以歷史唯物主義觀點和論為指導,運用文獻、分析例研究和必要的計量,追覓、解析、評述中小學教師規的沿革軌跡、主要內容、制定實施及其所獲成效,探尋在國家政治、經濟和文化的宏觀背景下,依治教、依治師與教育發展之間的內在聯系和互動機制,以為當代中國的中小學教育改革服務。
  8. First, introduce the reasons and character of current banking m & a, then summarized the former studies of the three ways of m & a to efficiency gaining : size versus size economy, m & a versus banks efficiency, and m & a versus shareholders wealth. then introduce the research approaches of m & a efficiency gaining, especially the approaches of m & a versus banks efficiency, such as parametric frontier approaches and non - parametric frontier approaches. in the following, through roe model and dea model to study the relations between size and efficiency, finding : middle size banks efficiency is higher, larger banks have n ' t scale economy, small banks have low em, and through directly analyzing m & a efficiency of four commercial banking m & a case in china, finding : the past - merged efficiency of shanghai pudong development bank has been improved, and others have been deduced, but after three years the efficiency increased little by little

    首先,分析了當前銀行並購的主要原因、特徵以及我國銀行並購的現狀與特點;接著對銀行效率水平的概念進行分析,綜述了國外對銀行並購與效率獲利的三面的研究(考察銀行的規模與效率這種間接式、並購行並購前後的效率以及並購行與非並購行的效率和考察上市銀行並購前後股東財富的變化這兩種直接式)的有關文獻;再次對銀行並購與銀行效率獲利的分析進行了介紹,其中詳細地研究了前沿分析:參數分析和非參數分析,並指出了這些的特點;然後運用財務率分析和dea對我國商業銀行規模與效率從間接角度對銀行並購產生的效率獲利進行了實證研究,結果發現:中等規模的商業銀行的效率最佳,而小規模的銀行的em值低,同時大規模的商業銀行的規模無效;同時利用我國已發生的四個銀行並購從直接的角度對我國商業銀行並購的效率獲利進行分析,結果發現:除上海埔東發展銀行在並購後效率提高,其他三家銀行並購后的效率都有所下降,但並購后第三年效率又逐漸回升。
  9. In this dissertation, i will make comparative study on the typical cases of the excellent companies by means of comparative study and case study in order to explore ? the relationship between employee training and corporate culture. further more, i will study the employee training in china from the perspective of corporate culture

    論文採用等研究,對國內外優秀企業的一些典型例進行研究,旨在探尋企業文化與員工培訓之間的內在聯系,從企業文化角度對我國企業現行的員工培訓作一次再審視。
  10. Proficiency testing by interlaboratory comparisons. development and operation of proficiency testing schemes

    採用實驗室間的進行熟練度測試.熟練度測試的制定及運用
  11. Proficiency testing by interlaboratory comparisons. selection and use of proficiency testing schemes by laboratory accreditation bodies

    採用實驗室間的進行熟練度測試.由實驗室認證機構對熟練度測試的選擇及運用
  12. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨塔斜拉橋與兩側剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的選、設計思路、橋面系結構形式、塔柱截面設計、深水基礎的設計及施工、協作剛構的剛度選取、塔柱的直束加固等面作了詳細地計算分析和
  13. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術,最終選擇了技術先進的砂墊層預抬高分級充水預壓,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等面的實測與數據分析。
  14. This article uses fuzzy set to determine limited water level of flood control, and compares it with the real control way. it provides strong theoretical base for the determination of limited water level of flood control for yinhe reservoir. through many years run, yinhe reservoir " s conflict is profit

    用模糊集分析確定防洪限制水位,並將其與實際運用,為音河水庫的汛限水位的確定提供強的理論依據,為提高水資源的可利用量,緩解水庫防洪興利之間的矛盾提供了理論依據。
  15. According to the analysis and discuss, the new methods was effective

    通過算例分析和,證明所提出的優化是行之有效的。
  16. With the planning of shield tunneling for four stations arid three sections on the 11 ( superscript th ) tender stretch ( from lingjinghutong to xinjiekou ) on the beijing subway line 4 as the background, the paper analyzes in detail the affecting factors on the planning of shield boring, and introduces the extensive process to determine the overall planning option for the shield tunneling of the three sections through option comparison

    摘要以北京地鐵4號線11合同段(靈境衚衕新街口)四站三區間的盾構施工籌劃為例,重點分析影響盾構施工籌劃的因素;以,介紹了確定三區間總體籌劃的詳細過程。
  17. The study shows that the deck excavation schemes is good than the bench stoping schemes by calculation of limit equilibrium method and the sliding mass to the excavation the slide up to el 790m is in stabilization under vii earthquake intensity with there dimensional finite element method by means of computer simulation and calculation.,

    研究結論是,從剛體極限平衡的計算結果分析,臺階式開挖和整體開挖,整體開挖明顯要好於臺階式開挖。為了保證工程的安全性,同時兼顧工程開挖措施的經濟性,建議重點考慮開挖高程為790m的整體開挖
  18. Considering the actual condition of this tunnel, several key mechanical problems involved in the construction of the tunnel have been studied : the comparison of three - heading construction method and benching tunneling method, and the construction sequence of the two tunnels is carried out

    本文結合該工程實際,進行黃土連拱隧道的關鍵施工力學問題研究:正洞上下臺階與側壁導洞施工研究;先左洞(靠山一側)施工和先右洞施工的對
  19. With the input of a great number of data and survey information, the mcgdm system adjusted the criteria, comparative importance and weight while taking into consideration of various qualities and quantities such as shipping cost, investment scale, construction condition and development potentials, etc. the comments and recommendations on the options were resulted and a quantitative comparison became possible. it not only analyzed the cost of each option but also optimized the local container transportation network by comparing the shipping cost of each option, with the help of transportation network optimizing model and other techniques

    本文還運用了多準則群決策分析,以大量數據信息採集和多個專家意問卷調查為基礎,對各個基本準則和評價指標相對重要程度、權值進行了綜合處理,同時有機的融合了包括運輸費用、投資規規模、建港條件、發展前景等各種定量和定性分析的指標,提出了布局選擇的推薦意見,為規劃提供了量化選依據,為大型集裝箱港口規劃探索了一種更有效的和更科學的規劃工作模式。
  20. All these method have been compared from several aspects, such as technical reliability, work time, costs and site construction, then the high - pressure sprinkling grouting technology and the vibroflatation process are decided as the methods of reinforcing the xiacouba reservoir

    ,下口壩水庫大壩穩定處理採用振沖加固,大壩防滲處理採用高壓噴射灌漿。對應該處理的物理力學參數取值進行了研究。
分享友人