施工文件 的英文怎麼說

中文拼音 [shīgōngwénjiàn]
施工文件 英文
construction documents
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 施工 : be in the process of construction; be under construction; build; construction
  • 文件 : 1 (公文、信件等) document; file; papers; instrument 2 [自動化] file; 文件保護 file protection; ...
  1. To avoid the retardation of flood water, improve the discharging conditions and reduce flooding frequency and flowage damage on flood retarding basins, huai river commission made a decision to adjust and regulate the middle courses of huai river. the authorial thesis is based on the main part of huai river flood - protection planning, i. e., the flood - protection planning of huai rivers middle courses. author of thesis participated in the drawing up and the administrating of the plan

    為了擺脫中、小洪水行洪不暢,減少行、蓄洪區在中、小洪水條下的行洪機遇,淮河水利委員會在淮河流域總體防洪規劃中,決定重點解決淮干中遊河道防洪問題,論作者親自參與制定了淮河中、上遊河道防洪規劃制定作,並組織、領導規劃中各項骨幹程的建設,前後數年之久。
  2. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  3. Article 12 mine construction projects must be constructed in accordance with the design papers approved by the authorities in charge of mining enterprises

    第十二條礦山建設程必須按照管理礦山企業的主管部門批準的設計
  4. September 28, a desk - sized machine that reproduces documents on ordinary instead of specially treated paper was introduced by haloid xerox, inc

    9月28日,樂復印機公司開發一臺辦公桌大小的機器,能夠使用普通復印,從而代替了原來特殊加的復印紙。
  5. First, the thesis gives a detailed analysis about the causes and expressions of the medium and small - sized enterprises financing problems, concerning the relationship between banks and enterprises enterprises status, related policy and finance service etc. then, in order to solve the financial problems effectively during the developing process of the medium and small sized enterprises, on the basis of the development stage, concrete environment and characteristics of the medium and small sized enterprises in our country, the thesis gives relevant suggestions about the improvement of enterprises " inside financial environment channel expansion of the indirect f inane ing, more emphasis on direct financing trend of the state ' s policy and innovation of financial instruments etc. at last, in order to welcome the coming technology economy, the thesis especially analyze how to use the capital from at home and abroad to develop risk investment, to ease up the contradiction of capital supply and demand, and to support the fast development of the hi - tech medium and small - sized enterprises

    然後,為有效解決中小企業發展中遇到的資金問題,根據我國中小企業所處的發展階段、具體環境和自身特點,結合我國金融市場的現狀和未來發展趨勢,從改善企業內源融資條、拓展間接融資渠道、注重直接融資手段、國家政策取向、金融具創新等方面,提出相應的對策建議。為迎接知識經濟的到來,本還特別探討了利用國際、國內資金發展風險投資業務,緩解我國高科技中小企業資金需求與供給的矛盾,支持高科技中小企業快速發展的措。本試圖通過對中小企業融資問題的研究,探索我國中小企業特別足高科技中小企業發展面臨的一些共性問題,為我國中小企業融資方式和融資體制的改革略陳管見。
  6. Construction supervision including shop drawings and submittals checking, qa / qc, systems startup and commissioning, plant operation troubleshooting, operation and maintenance manuals preparation, client liaison and hand over

    監督,包括加圖和提交審核、 qa / qc 、系統啟動和試車、裝置運行故障診斷、編制操作與維護手冊、客戶聯絡、項目移交。
  7. Prepare all technique file for process including tape line, weaving, coating line, rewinding, and printer and push to follow it

    準備包括拉絲、編織、覆膜、重卷、和列印在內的各序的技術,推進實
  8. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    首先對支盤樁的基本原理進行了闡述,對其過程以及成型過程進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質水,試驗目的、試驗方案、試驗設備以及試驗過程,並對試驗注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的荷載傳遞規律,並與普通抗拔樁進行了相關對比;最後,本提出了本次試驗尚未解決的一些問題,並對支盤樁的前景進行了展望。
  9. Study on common problems of working drawing design documents

    圖設計中常見問題研究
  10. This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field

    從系統理論出發研究油氣動態系統基本統計規律,結合油氣動態系統的一般特點,結構特點,兼顧油田開發規劃設計的要求,利用功能模擬原理(含神經網路方法、微分模擬方法) ,依據油田歷史數據,建立了油田開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了油田及採油廠兩級的開發動態指標預測,同時利用最優化原理,在分析「決策變量」 、 「目標」及「約束條」的基礎上建立了多個構成油田開發規劃的「優化模型」 ,這些優化模型包括:產量構成優化模型(解決陸上稀油產量、稠油熱采產量、三次採油產量、海上產量及對應的成本、作量的最優構成問題) ;措產量結構優化模型(解決壓裂、酸化、大修等各項措產量及措作量的最優構成問題) ;產量分配優化模型(將油田的產量最優地分配到各採油廠)以及油田綜合開發規劃模型。
  11. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    主要通過壩基現場抽水試驗試驗資料整理,在揭示黃土壩基降水特性規律的基礎上,確定可以反映現場抽水條的的實用降水計算模型和參數;再根據現場抽水條試驗開發的成井技術和計算模型計算壩基和壩肩兩個水地質單元的降水井方案,並按程類比法確定最終的降水方案;最後,通過過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足的要求。
  12. Abstract : the calculation method of temporary load of the continuous carrier bar with different distance span was discussed. the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient

    摘:討論了不跨連續壓桿的臨時荷載計算方法,應用該方法可以解決不跨受壓桿設計中必須解決的長度計算問題,從而使結構設計更為準確簡便
  13. Preparation of the bidding documents for the civil works of the tianshengqiao - 1 hydropower station and its bidding

    天生橋一級水電站土建程招標的編制與實
  14. This article put forward some measures as follows : job design, construct excellent corporate culture, provide fair pay and benefits, establish a sound training and development system, improve performance and work environment, purify relations with person and person within organization, rightly deal with employee ' s complaint, understand employee ' s real requirement, rightly deal with turnover put forward by employee

    提出如下措作設計、建構優秀的企業化、提供公平的薪酬福利、建立完善的培訓和發展體系、提升效益和改善條、凈化企業內人與人之間的關系、正確處理員的抱怨、了解員的真正需求、正確處理員提出的離職。當然,企業應根據自身特點、員離職原因等採取合適的留人措
  15. Furthermore, on the basis of consultancies, inquiries and evaluations from multiple sources, the model for predicting soil and water loss in dandong - zhuanghe highway construction is developed. moreover, considering the characteristics of the highway, the covering area of the project is divided into three parts such as main body area, soil - fetching area and soil - spoiling area. for these three preventive areas, the perfect precaution measures for preventing and curing the soil and water loss during the road construction in which a number of vegetal cover measures are taken

    中詳細調查並介紹了項目情況及沿線自然、社會經濟狀況;收集研究了公路建設項目水土流失預測的基本內容和方法,在多方查詢、請教專家及分析研究的基礎上,提出了丹莊高速公路水土流失預測模型,針對項目不同區域進行了水土流失預測和分析,為水土保持措的設計提供了定量依據;論根據高速公路項目的特點,將丹東至莊河高速公路項目區分成了主體程、取土場、棄土場三個水土流失防治區,並在初步設計的基礎上,針對三個水土流失防治區進行了較為完善的水土保持防治措設計;論在丹東至莊河高速公路水土保持方案設計中大量採用了植被防護措,為了更有力地指導植被措,論中還就植被保持水土的有效性進行了研究探討。
  16. Scientific supervisory methods for normalization of construction documents

    施工文件規范化的科學監管方法
  17. Considering the difference of geological condition and construction condition, the thesis select the best form to save the money and make the work in security. a ) the pile support : according cantilever supporting pile, one - anchored supporting pile, the thesis compile a series of program with the method of criterion

    針對黃土地區懸臂支護樁、單層錨桿支護樁、土釘支護等不同的支護方案,優選了支護方法和結構形式,考慮了不同的地質條情況下,採用相應較合理的支護方案以達到安全可靠和經濟的目的。
  18. Through the analysis on the process of change claim on construction of temporary cofferdam for the downstream leading channel of jinghong hydropower station, the full process of how to make the application for change of construction project based on the change between the actual construction condition and the construction condition during bidding and how to realize the approval of the quotation of contract change is described herein for the construction enterprise, and then some viewpoints on the management and utilization of the relevant talent resources are put forward as well

    摘要程索賠是一項知識和技術面很廣,復雜而又系統性很強的作,中通過分析景洪水電站下游引航道圍堰變更索賠過程,說明單位如何根據實際和投標時的改變,提出變更立項申請,實現變更報價審批的過程,同時在人才資源的管理和利用上提出一些見解。
  19. Preparing shop and construction coordination drawings and final record " as - built " documentation

    準備加圖和協調圖紙以及作為最終記錄的「竣
  20. This type was adopted for the first time in cangzhou city and hebei province, and it is suitable for the region with poor foundation, it offers wide condition for the construction and it is economical, its exterior is handsome, especially suits for the bridge of city. this paper is of great importance for guiding the design and calculation for this type of bridge ; and it promates the research and application of the new type of cfst for the purpose of widely spreading it in the field even the resign

    下承式鋼管混凝土系桿拱橋型式在滄州市乃至河北省都是首次採用,適于建於地基條較差的地區,寬松,造價較經濟,外型美觀,尤其適用於城市橋梁。本對今後該類型橋梁的設計計算和具有重要的指導意義,為在本行業乃至本地區繼續推廣鋼管混凝土這一新型結構的研究與應用起到了推動作用。
分享友人