施工水位 的英文怎麼說
中文拼音 [shīgōngshuǐwèi]
施工水位
英文
construction water level- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 位 : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
- 施工 : be in the process of construction; be under construction; build; construction
- 水位 : stage; water level
-
The authors analyze and select landslide parameters by using back analysis method, and consult with the congeneric landslide to determine this landslide parameters, which can offers reference to design and construction department
用反分析方法對水井坪滑坡參數進行分析選擇,並參照同類滑坡確定該滑坡的參數,為設計和施工單位提供依據。Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now
特別是對在高地應力、高地下水位區域的隧洞建設,其施工難度更大,在國內的水利水電工程建設中並不多見。This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme
此程序可以模擬單井抽水時計算區域各點水位降深隨時間的變化,研究水流運動規律;求解任意邊界條件下的井定流量抽水問題,預測潛水位,指導施工開挖進度,評價降水方案的合理性。Responsible for finding out errors or criminal facts and giving punishment accordingly as for public water supply facility and the user of city water supply devices, peccancy water consumption by the construction site and water waste
五負責對城市規劃區內使用的公共供水設施和城市自備水供水設施的用水單位,施工工地的違章用水浪費用水及相關用水手續進行現場查處。Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay
文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水位、河床以及杭州灣北岸深槽的影響The specific measures can be put forward as follows : firstly, with the aims of improving the level of individual specialization, more emphasis should be put on deploying and training human resources, improving labor quality and their expertise ; secondly, in order to enhancing internal labor division level in west china, it should take an active participating in the labor division both at home and abroad. west china should also make full use of its geographical advantage to develop trade in border area, take part in domestic labor division actively and hence promote the reconcilable development in west china and east china ; thirdly, to decrease transaction cost and improve transaction efficiency in west china, it is necessary to build and strengthen the market transaction system and better facilities of infrastructure
進而提出了西部地區發展對外貿易要以分工優勢理論為指導,並提出了如下措施:加大人力資源的開發與培養,提高勞動者素質和專業技能,以提升個人專業化生產水平;積極參與國際、國內分工,尤其是充分利用區位優勢,大力發展邊境貿易和積極參與國內層面的分工合作,促進東西部的協調發展,以提高西部地區的內部分工水平;建立健全市場交易體系,改善基礎設施,以降低西部地區的交易費用和提高西部地區的交易效率。Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized
採取樁管壁開孔、先灌水后灌砂的方法,優化了水上擠密砂樁的施工工藝;給出了在近岸無掩護、水流急的施工條件下的施工參數和檢驗比率,總結了沉樁定位、高程式控制制、灌砂率等參數的控制措施和檢驗方法。Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles
本文首先對支盤樁的基本原理進行了闡述,對其施工過程以及成型過程進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質水文條件,試驗目的、試驗方案、試驗設備以及試驗過程,並對試驗注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的荷載傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次試驗尚未解決的一些問題,並對支盤樁的前景進行了展望。In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future
本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。Among them, working procedure optimization of construction of passing water gap in flood season in the same construction can be spread ; utilization of experience that lime dusts are mixed with macadam to satisfy winner construction, difficult problem of short construction stage in the cold area can be solved, this experience has the popular adaptability
其中度汛期過水缺口部位施工工序的優化在同類工程中具有推廣價值;利用碎石摻加石粉料滿足冬季施工的經驗解決了寒冷地區施工期短的難題,該經驗具有普遍的適應性。Finally, we suggest we should observe the horizontal and vertical deformation and water press in soil in construction, in order to avoid the huge accident and ensure the quality of construction. through the practice of binhai road in shenzhen, the studies result was further confirmed
最後本文提出,在濱海軟土路基施工中,對軟土地基的水平、豎向變形以及土中孔隙水壓力必須進行監控以保證軟土路基施工的質量和預防重大事故的發生,並強調以現場原位試驗來確定軟土工程力學性質,將更符合工程實際。In the recent years, along with the construction of breasting dolphin, people put more and more attention to the interactional relation between laterally loaded piles and soil. but there is no domestic criterion about calculational methods of breasting dolphin
50年代前,樁只作為承受軸向力的構件,隨著鋼樁在實際工程中的應用,樁的水平承載性能越來越引起人們的重視,尤其是柔性靠船樁在大變位情況時,國內尚無針對這種結構的設計、施工規程。According to many engineering blasting cases, in - depth analysis of underwater blasting mechanics, and discussion about the advantages of touch - ground charging for underwater rubble - mound foundation explosive compaction, it is proved that touch - ground charging method for explosive compaction results in good effect and is characterized by simple and feasible operation, and low cost, and thus well accepted by clients and construction units
摘要通過大量的工程爆破實例,深入的水下爆炸機理分析以及觸地布藥方式在水下拋石基床爆炸密實優越性的討論,充分表明採用觸地布藥方式實施爆炸密實的效果良好,操作簡單可行,節約工程成本,並得到了業主、施工單位的肯定和好評。This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project
本文通過對高壩洲水利樞紐工程項目實施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐工程設計過程的全面管理,充分論證了設計方案的選擇及設計質量的高低,直接關繫到工程項目的投資、質量和工程進度的控制好壞;闡述了高壩洲水利樞紐工程施工過程的全面管理,論述了監理在施工過程中的管理程序和方法,施工單位遵循一定的監理程序,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質設備的采購管理,通過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐工程項目驗收及后評價,明確了高壩洲水利樞紐工程項目竣工驗收的內容;較全面地闡述了高壩洲水利樞紐工程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目順利實施的信息管理、溝通管理、沖突管理和風險管理。Gaobazhou water conservancy project is a technical complex referring to a lot of specialties, mainly includes civil engineering, geological treatment engineering, metal structure installation engineering, electric engineering, mechanical engineering and so on, project participants include owner, designer, supervisor, contractor and material and equipment purchaser
高壩洲水利樞紐工程項目技術復雜,涉及的專業較多,主要有土建工程、地質缺陷處理工程、金屬結構安裝工程、電氣工程、機械工程等專業,參與項目實施的單位有業主單位、設計單位、監理單位、施工單位、物質設備采購單位。Firstly, for normal high building, second - class measurement could meet the needs of sinking survey ; secondly, the location of survey should be based on the design drawing and choosing the first structure layer as a survey period ; thirdly, the arrangement of the results of sinking survey should be regular and accurate by a certain person, and if there is problem present, it should be solved or done away with in time ; finally, the results of building sinking survey should be fed back in time to survey, design and construction units as reference for the next project
首先對一般的高層建築物來說,只需二等水準測量即可滿足沉降觀測的要求;其次,對于沉降觀測點及觀測的周期,通常要按照設計圖紙的要求布設觀測點,觀測的周期一般以一個結構層為一個觀測周期;第三,對沉降觀測結果的整理,要定期定人及時準確,發現問題要及時解決處理;最後,建築物沉降觀測的結果要及時反饋給勘察、設計和施工單位,為下一步的勘察、設計和施工提供可靠的參考依據。Through the analysis on the process of change claim on construction of temporary cofferdam for the downstream leading channel of jinghong hydropower station, the full process of how to make the application for change of construction project based on the change between the actual construction condition and the construction condition during bidding and how to realize the approval of the quotation of contract change is described herein for the construction enterprise, and then some viewpoints on the management and utilization of the relevant talent resources are put forward as well
摘要工程索賠是一項知識和技術面很廣,復雜而又系統性很強的工作,文中通過分析景洪水電站下游引航道圍堰變更索賠過程,說明施工單位如何根據實際施工條件和投標時施工條件的改變,提出變更立項申請,實現變更報價審批的過程,同時在人才資源的管理和利用上提出一些見解。Ignore and construct issue of quality testing the reasons in many aspects have : on one hand, engineering construction square quality - mind thin, paying special attention to progress, take benefit simply ; on the other hand, the traditional detection method taking pressing water as main means, because its is time - consuming, strenuous, influences the construction speed, high characteristic of fabrication cost, make the unit in charge of construction and owner all unwilling to carry on the quality testing work
忽視施工質量檢測的問題存在多方面的原因:一方面,工程建設方質量意識淡薄,一味的抓進度、要效益;另一方面,以壓水試驗為主要手段的傳統檢測方法,因其費時、費力、影響施工進度、造價高等特點,使施工單位和業主都不願意進行質量檢測工作。Public works projects should not cause damage to or interfere with watercourses as far as practicable, except for the execution of the works
在可行的情況下,公共工程不得破壞或干擾水道。若該等破壞或干擾是進行工程時所必須的,工程倡議者施工單位必須把水道修復妥當;And the much more better scheme is submittde for the engineering unit. additionally, the plate and shell ' s basic elastic theory have been represented. with the development of traffic walks and science and technology, more and more structures will be used in the sea, the paper ' s works may offer reference for the structures
隨著交通行業和科學技術的發展,在深水、海洋中施工的結構越來越多,本文對該樁靴結構的計算分析和優化設計,不僅對該結構的強度和剛度是否滿足工程要求為施工單位提供了定量的分析依據,並可為類似結構的設計和計算分析提供參考。分享友人