施工程序表 的英文怎麼說
中文拼音 [shīgōngchéngxùbiǎo]
施工程序表
英文
construction schedule- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 表 : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
- 施工 : be in the process of construction; be under construction; build; construction
- 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
-
Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.
基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的澆築溫度、夏季混凝土表面噴水霧、施工汛期壩頂面過水等。From the introduction of the structure and characteristic of dcs, the analyzing in process and control peculiarity of huaxin type cement kiln and the analyzing in the ordinary forms of computer control system in the cement plant, to determine the feasibility of application of the dcs in computer control system of huaxin type cement kiln ; introduced the structure of the system hardware, constitutes and characteristic of the industrial network, the characteristic and the performance in industrial control system of the software system ; illuminated the whole course of the design and the application of simatic s7 - 300 programmable controller in the industrial producing process profoundly : the protraction of a control flowchart ; the confirmation of the control scheme in every cell ; how to workout a table of the all controlling and measuring dots in the control system ; how to set up a plc control project ; the configuration of the hardware and the network in project ; illuminated the course of how to program the plc control program in detail ; how to establish a connection between the plc and the programmer ; how to download the configuration and the program of the plc project ; the configuration of control center software simatic wincc ; the whole course and the methods of the control system debugging ; illuminated the essential in the course of the design in project and program ; illuminated the problem and its respondence maybe encountered in the project ; illuminated the superiority of the new control system in inspecting, operating and its stability ; discuss the development of the computer control system in the application of the huaxin type cement kiln
從介紹了dcs的結構、特點和分析華新型水泥窯的工藝控制特點及當今在水泥窯計算機控制系統上採用的幾種常見形式的比較出發,分析了在華新型水泥窯應用dcs的可行性;詳細介紹了系統硬體結構、網路組成及特點、所採用的軟體體系的特點及其在工業控制應用中的性能;深入詳細地說明了西門子s7 - 300可編程序控制器在華新型水泥窯控制上應用及設計的全過程:控制流程圖的繪制;單元控制方案的確定;系統控制測點表的編制; plc控制項目的建立;項目硬體及網路的組態; plc控製程序的編制過程並詳細說明了控製程序的編制思路; plc與編程器連接的建立; plc項目組態及控製程序的下載; wincc監控軟體的組態;控制系統的調試過程及方法;對設計和使用的要點及系統調試時應注意的問題進行了說明;對項目的實施后的華新型水泥窯控制系統在操作和控制上及其在系統易維護性、系統穩定性上的優勢進行了說明並討論了華新型水泥窯計算機控制系統的發展方向。In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future
本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs
摘要介紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼筋施工、模板施工、混凝土面層的施工工藝與質量控制,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method
該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。In order to get an better control in horizontal displacement of tower top and the internal strength and displacement in beam, the theme take an circulating forth piece together means and get to a good target. the theme carry the theory through bsap program in design of the large highway bridge in anqing and prove the theory of the theme ' s useful and availability
結合在安慶長江公路大橋的設計工作,論文採用了bsap系列程序有針對性的進行了實際應用,實際生產的使用表明了本文所採用理論與方法的有效性,為斜拉橋施工控制的模擬計算過程提供了一種參考與依據。The results and conclusions are helpful and valuable for the soil nailing bracing. in the case study of deep foundation pit of dalian zhongyin mansion, the discussions are emphasized on how to analyze and modify the previous design according to practical engineering geological conditions, periphery surroundings and the construction organization process and others. furthermore, optimization of bracing design for the project is done considering construction technology and urgent measures
綜合考慮實際地質條件、周邊環境約束條件、施工組織過程與程序等多方面,對原有支護設計方案進行了分析與修改,並進行了優化設計,其中考慮了施工工藝、應急處理措施等方面;並由此進一步表明了深基坑工程中動態設計與信息化施工的重要性。In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data
為得出適合本段工程的最佳施工路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crd工法施工的c 、 d部相錯長度進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施工方案的三維有限元動態施工模擬,得出了較優的施工方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣管線的安全性進行了分析,得出了利用此施工方案施工不會造成此處煤氣管線破壞的結論。The result of long - term operation shows that the computer control system is practical and effective, it can run in the optimal state within a long duration to fully realize data collection and process, remote data transmission and vfvs constant injection control of pumps. it speeds up the automatic procedures of the seawater treatment process, really realizes the unmanned working, decreases the physical intensity to a large extent, improves the management, enhances the management level, avoids equipment wear down as much as possible, makes the seawater treatment efficient and lessens the cost of production
長期的運行結果表明,該計算機控制系統的實施切實有效,既成功實現了對被檢測參數的數據採集與處理、遠傳以及注水泵機組的變頻調速恆壓注水控制,又提高了系統的自動化程序,真正實現了無人值班作業,在很大程度上降低了工作人員的勞動強度,極大的改善了現場的管理狀況,提高了生產管理水平,且有效避免了設備損耗,提高了水處理效率,降低了生產成本。Thirdly, by the method of questionnaire and quality control tools, the buying and selling process quality control proposal is given in this article, thereby, the analytical methods of quality control including the acceptance criterion of wheat, the process capacity of supply and customer satisfaction indexes evaluation are discussed in this article. fourthly, based on the methods of statistical process control, this article evaluate the factor that have a impact on the process of the stored grain with qualitative analysis and quantitative analysis, and bring forward the design proposal of controlling temperature for stored grain in warehouse. at last, in order to bring the optimization design for quality management system into effect and advance the enterprise in overall management, the article table a proposal including strengthening the training of quality management, introducing iso9000 standard into quality management, bringing about the grain industrialization, standardizing quality inspection criterion, developing the computer auxiliary control system
首先依照iso9001標準,藉助于設計的專家調查表通過專家調查,對該糧庫的質量管理體系現狀進行詳細分析,確定出質量管理體系文件、資源管理、產品實現過程、質量控制和質量改進五個方面存在的主要問題;其次運用系統方法建立了糧庫質量管理體系完善程序及質量管理體系的三維空間結構模型,並在此基礎上優化設計出了質量管理體系內部審核、不合格控制、糾正和預防措施等質量改進實施方案;再次,運用調查表法和質量管理控制工具對該糧庫的糧食輪換過程的質量控制進行了優化設計,確定出糧食采購標準、供應過程能力分析以及顧客滿意度評價等分析方案;然後,運用統計過程分析方法對糧食倉儲過程的影響因素及其原因進行定性和定量分析評價,確定出倉儲過程質量控制的優化方案;最後,為確保設計方案的有效實施,從糧庫加強質量管理培訓、導入iso9000族標準、糧食產業化開發、規范糧食質量檢驗標準、開發計算機輔助控制系統五個方面提出具體實施建議,以便提高其整體質量管理水平。An on - line minimum - variance estimator was developed for thrust acceleration applied to orbit transfer using discrete - time radar measurements. the mass - flow - rate of propellant was selected as a state variant, which was estimated by employing an integral state model and ekf filter. the variation equations for measurement vector to mass - flow - rate have been established to linearize the discrete - time measurement equations. the algorithm has applied successfully to maneuver process in commanding satellite into geo - stationary orbit. the results show that the algorithm developed here can monitor and determine whether engine works well or failure precisely and quickly during orbit transfer process
飛行器軌道機動過程中,為跟蹤、定位機動目標和干預機動控制過程,需要統計處理離散的雷達觀測量實時估計推進發動機的推力,進而確定飛行器的瞬時軌道參數.本文所述演算法是該工程問題的探討和解決方案.文章建立了軌道機動過程中連續變質量運動模型和離散雷達量測模型,推進發動機的質量秒耗量作為表徵推力加速度的一個近似常量,應用擴展卡爾曼濾波對離散的雷達測量數據進行順序統計處理給出秒耗量的最小方差估計;文章詳細地推導了線性化量測模型的變分方程和觀測矩陣;模擬結果表明該演算法能快速、準確地估計推進發動機的質量秒耗量和向機動目標施加的實際推力Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design
根據宜興銅官山抽水蓄能電站地下廠房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區邊界上的位移場,藉助州sys有限元分析軟體,獲取模型邊界節點的坐標信息,然後通過ansys軟體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。This paper analyses the annotated rules of the steel information of the frame column expressed in " plane method " construction drawing, sums up the expressed characteristics of the reinforcement information of the frame column, the object - oriented method is adopted to get the expressed pattern of the steel information. owing to " plane method " shop drawing steel information is expressed by geometry parameter, combine of the shop drawing and the detailed construct drawing can full express the steel information. by study of the information, this paper set up the steel parameter graph base
對「平法」施工圖中框架柱鋼筋信息的注寫規則進行了深入的分析和研究,對完整反映框架柱鋼筋的各類信息表達特點進行了歸納,在此基礎上利用面向對象的程序設計方法及c + +語言建立了描述框架柱鋼筋所有信息的表達模型;由於在「平法」施工圖中各類構件鋼筋的幾何信息是一種抽象的以參數表達的信息,影響參數由圖中鋼筋的標注信息和標準構造詳圖中的構造要求確定。Thirdly, imposing pressure load on the wetted surface is a hard job because the pressure value is various and there is no regularity to fellow especially when the model is large. so it ' s very important to find a feasible automated loading approach that can be used in the fem analysis of ship structure
3 、由於向有限元模型施加壓力的時候,船體濕表面的壓力不盡相同,並且沒有規律可循,如果單元很多,那麼手工加載的效率就很低,本文開發了基於pcl的自動加載程序,提高了工作效率。In this research, the outline design of power engineering system is comprised of three aspects : system structure, wok pattern, and software implementation mode ; the implementation stage was separated into background database, front - end interface and report module, and lots of problems were brought forward. in the section of realizing the detailed design and implementation of the system, the thesis dissertated the above three aspects in emphasis. firstly, the design and implementation of background database : " sybase " database management system was adopted in this system to provide data service and database can be built through analyzing the construction operation flow ; data warehouse technology was introduced in this research as well
接下來在系統詳細設計和方案實現中,論文主要從三個方面進行論述,即后臺數據庫設計與實現:系統採用sybase數據庫管理系統作為后臺數據服務,通過對工程管理的流程整理和分析,給出了建庫的實施過程,同時採用了數據集市技術實現工程信息的管理,採取文件和數據庫結合的方法對文檔信息進行管理;前臺界面設計與實現:在課題的研究中,應用先進的asp . net技術創建web應用程序,它結合了桌面程序強大的交互能力和web方便的信息發布能力,而在後臺數據訪問中採用ado . net技術來完成;報表模塊設計與實現:論文在總結目前多種報表的優缺點后,提出了一種web報表解決方案,即通過客戶端的軟體實現信息查詢並將返回數據導入excel中,藉助其強大和靈活的表格處理能力,在電力生產工程計劃管理系統中實現用戶定製報表功能,其中web服務技術起了關鍵作用。Then, this paper presents a program, which is used to analyze the construction control of modong hongshuihe arch bridge. the calculated values coincide with the measured data and closely agree with the results obtained by other references. it was thus confirmed that the stress balance d method is effective and reliable in practice
同時依據應力平衡法的思想,編制了用於懸臂拼裝拱橋施工控制的程序,採用該程序對廣西來賓磨東紅水河大橋進行了施工控制分析計算,經與監測數據及課題組研究成果相比較,結果表明,應力平衡法是合理與有效的。On the performance of assigned lawyers, council intended to ask lawyers to register for the scheme, and conditions for registration would be drawn setting out, amongst other things, procedures to deal with potential cases of unsatisfactory performance and council s power to take action in cases of unsatisfactory performance, including suspension of a panel lawyer from the panel for a fixed period, removing a panel lawyer from the panel, referring the matter to the relevant professional body for investigation, issuing a warning to draw the attention of the lawyer to his unsatisfactory performance, and adjusting the fees payable to the lawyer to offset any additional expenses incurred by council in assigning other lawyers to undertake remedial work
對于外判律師的表現,本局擬要求律師就該項計劃注冊,並制訂注冊條件,列明其中包括對表現不理想的可能個案的處理程序及本局針對表現不理想個案採取措施的權力,包括在一段固定期間內中止律師在律師名冊內的注冊資格將律師自該名冊中除名將有關事項移交相關專業機構調查發出警告使有關律師注意其不理想表現,以及調整應付該律師的費用以抵銷本局指派其他律師進行補救工作所產生的任何額外開支。Departments implemented more than 30 specific measures, including streamlining procedures and reducing the processing time in the approval of general building plan and related submissions, significantly shortening the retrieval time for approved building plans by introduction of a pilot electronic retrieval system, and facilitating the submission of public forms by businesses and individuals electronically through the internet
各部門已實施超過30項具體措施,當中包括簡化審批一般建築圖則及有關文件的程序和縮短審批時間;推行電子檢索系統試驗計劃,大幅縮短檢索核準建築圖則的時間;以及提供電子政府表格,方便工商界和個別市民利用網際網路遞交。In order to assure that the stress and strain state of structure is secure, the author analyses respectively the objective functions of the reasonable finished state and buckle - cable adjusted phase ; thus, the optimized model based on fga is framed. finally according to the example, the computation datum are compared with the iterative forward analysis method and the optimal control theory. the result shows that this method can be used conveniently and meet the construction and design precision
為了滿足大跨度鋼管混凝土拱橋施工的安全性與成橋預期的內力狀態和拱肋線形,本文結合工程實例,分別對合理成橋狀態和扣索索長調整的目標函數的確定進行了分析,將一組多變量、多約束的最小化問題無約束化,從而建立起適合於該問題的遺傳演算法優化模型,將其計算結果分別與迭代前進法和隨機最優控制理論進行了比較;結果表明,採用該方法編制的基於結構計算的遺傳優化程序操作靈活,能很好的滿足施工和設計要求。The field quality check showed that such technology can meet the requirements of design and compared with traditional methods it can simplify the construction process, increase the construction flexibility, quicken the construction progress and reduce project cost
現場質量檢測表明,採用該技術可滿足設計要求;且與傳統方法相比減化了施工工序,加大了施工靈活性,加快了施工進度,降低了工程造價。分享友人