施工索賠 的英文怎麼說

中文拼音 [shīgōngsuǒpéi]
施工索賠 英文
construction claims
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : 動詞1. (賠償) compensate; pay for 2. (做買賣虧本錢) stand a loss
  • 施工 : be in the process of construction; be under construction; build; construction
  • 索賠 : claim indemnity; demand compensation; claimant; claim settlement; claim; claimer; presentation of...
  1. Analysis on similarities and defferences of construction claim indemnity in two conditions of contracts

    淺析兩種合同條件下施工索賠的異同
  2. Fidic item and construction claim

    菲迪克條款及施工索賠
  3. In this article it is concluded that the factors, which confine the claim for compensation, include : the low management level of the electric construction companies, the inadequate claiming ability of the companies, the nonstandard market and the unfit legal system etc. none but the government, the society and the companies effort together to intensify the legal system construction, standard the market rules, improve the comprehensive ability, can we build a good construction reclaiming circumstance and can the companies improve the reclaiming ability effectively

    本文認為,目前制約電力企業順利解決施工索賠問題的主要因素有:電力企業管理水平不高;企業能力不強;市場不規范;法制不健全等。只有通過政府、社會、企業共同努力,加強法制建設,規范市場秩序,提高企業綜合素質,才能形成一個良好的施工索賠環境,企業也才能有效提高施工索賠能力。
  4. It is a means to compensate the loss with the emergence of construction risks and a main target of the contractors who claim for compensation

    費用施工索賠的重要組成部分,它伴隨風險而產生的一種對損失的補償手段,是承包商進行的主要目標。
  5. With the rapid process of globalization and integration of the world economy, and china ' s entry to wto, the management of construction claim of bringing in foreign capital and foreign projects are required to comply with the international practice, so does the china ' s construction industry on the way of marching to the international construction market. in view of the fact that in most of the domestic construction enterprises, they are of weak consciousness of claim and both sides of contractor and contract are not so clear to the legal procedure and treatment of claim. they are not standard or systematic enough

    論文針對大多數國內建築企業存在意識薄弱,承發包雙方對實的方法、程序及問題處理都不甚了解或不夠科學規范,系統性差等的不足,通過結合建築企業在已按gb t19001 - 2000idtiso9001 : 2000 、 gb t24001 - 1996idtiso14001 : 1996 、 gb t28001 - 2001三個標準(或其中之一)建立運行企業管理體系的基礎上,運用過程方法,以建築程(建築產品)實現過程為管理目標,對施工索賠問題的識別進行了系統分析,建立了管理控制點,提出了各過程管理控制點相應的對策措
  6. The resulting litigation wastefully consumes important resources like time, money, and especially project - engineering talent, which in turn accelerate the socio - economic problems of a given country

    施工索賠訴訟會浪費大量的時間和金錢,尤其是程項目一些重要資源,這將產生社會、經濟問題。
  7. Recognition of causes of construction claims and finding of an appropriate prevention and resolution techniques are very crucial in this respect and have been examined deeply

    同時,論文提出對施工索賠原因的確認以及找到合適的預防和解決方法是非常關鍵的。
  8. Discussion about construction claim management of contractors

    論承包商的施工索賠管理
  9. Management of project construction claims in early stage of hydropower station

    水電站前期施工索賠管理
  10. It will also give a systematical analysis focused on the following problems of domestic construction expenditure compensation claiming : problems of construction project participants, problems of avoiding expenditure compensation - claiming risks, power of supervision and nodus of dealing with expenditure compensation - claiming, dilemma of contractors " in face of system of project compensation - claiming, difficulty of arbitrament on expenditure compensation - claiming of the arbitration department, data management of evidence of expenditure compensation - claiming, problems of judging values of the expenditure compensation - claiming, and ways of judging values of the expenditure compensation - claiming and ways of solving expenditure compensation - claiming dispute

    本文結合我國合同文本、施工索賠有關法律依據、從承包商的角度出發,主要對費用的原因、分類、作用、條款、事件的費用的構成進行系統的論述。並重點對國內費用存在以下的問題進行系統分析:程建設參與主體存在的問題、費用風險防範問題、監理的權力及處理費用難點、承包商面臨機制的困境、仲裁部門對費用裁決難點、費用證據的資料管理、費用計價依據存在問題和費用計價方法、解決費用爭議的方法。
  11. Claims can further be mitigated substantially if plans and specifications are thoroughly checked and revised before starting of construction

    如果在程項目前,能夠檢查、修正各類計劃和技術規范,那麼施工索賠就能夠緩解。
  12. During highway construction management by utilizing fidic conditions, large numbers of claim have been generated. whether contractor ' s claims management is successfully or not directly results in completion of constructive benefit. this paper, in view of contractor, based on analyzing the main reasons, classification opportunity and procedure of claim, it is emphasis on studying on efficient management method of contractor ' s claims and is surely worth popularizing in contractor constructing civil works abroad

    應用fidic條款進行管理的公路中,會產生大量的事件,管理作的好壞,直接影響到效益的實現,本文主要從承包商的角度分析施工索賠產生的主要原因及依據,施工索賠的主要內容,施工索賠程序和步驟,探討公路施工索賠的科學管理方法,研究成功的有效途徑。
  13. Discussion on computing method for construction claims

    施工索賠方法與技巧
  14. The analysis about claim of compensation of construction

    淺議施工索賠
  15. Proprietor ' s counter claim in international contract projects

    程變更與施工索賠問題的探討
  16. Analysis on the connotation and types of the construction claims

    施工索賠的內涵與種類之分析
  17. Pitting claim for promoting management and project construction claim

    促管與施工索賠
  18. Simple analysis on the construction claim of the management after bidding

    淺談標后管理中的施工索賠
  19. Construction engineering claim in the international contract project expressway engineering

    國際承包項目高速公路程的施工索賠技術
  20. As a resul t, the electric construction companies must intensi fy the management and improve the ability, put more emphasis on the research and the management of the project contracts and especially on the claim for compensation to meet the need of the international market

    因此,我國電力企業必須加強管理、提升素質,加強對程項目承包合同的研究與管理,尤其是要加強對施工索賠問題的研究,以適應將來市場化與國際化的需要。