施工組織方案 的英文怎麼說

中文拼音 [shīgōngzhīfāngàn]
施工組織方案 英文
construction scheme
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • : 動詞(編織) knit; weave
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 組織 : 1 (組織系統) organization; organized system 2 (組成) organize; form 3 [紡織] weave 4 [醫學] [...
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術程分類及適應范圍進行了理論上的分析研究;然後結合程實例對該項技術進行了設計,對比幾種不同的托換和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在的研究和實過程中,對于進行綜合闡述,並就人挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項提出有針對性的技術措,人挖孔樁採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化序;承臺梁採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合技術採用土分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該程實后的效果分析,說明該項綜合技術的可行性。
  2. The results and conclusions are helpful and valuable for the soil nailing bracing. in the case study of deep foundation pit of dalian zhongyin mansion, the discussions are emphasized on how to analyze and modify the previous design according to practical engineering geological conditions, periphery surroundings and the construction organization process and others. furthermore, optimization of bracing design for the project is done considering construction technology and urgent measures

    綜合考慮實際地質條件、周邊環境約束條件、過程與程序等多面,對原有支護設計進行了分析與修改,並進行了優化設計,其中考慮了藝、應急處理措面;並由此進一步表明了深基坑程中動態設計與信息化的重要性。
  3. The research object in this text is a project of the real estate in the chengdu city from the new vision. the project of the real estate is divided into four stages : concept stage, developing stage, performing stage and last stage. the main content of the project management in the concept stage is how to organize the feasibility test well. the main of the project management in the developing stage is how to organize man, material, finance and how to be ready for all the soft and hardware. the main content of the project management in the performing stage is how to guanatee quality, cost and time planning. the main content of the project management in the last stage is how to evaluate, check and accept, deliver the project and organize the last work well. confronting the present situation in all the stages, i work out some good measures. it is about to think the real estate project management farther in the last chapr. er. i bring out xhe important principle about the project management of the real estate and several question which must be delt with. comprehensively evaluating and perfecting the project management in the whole stages is all contents that the project management has the whole efficacy

    本文以全新的視角,以成都市一個房地產開發項目為研究對象,創新性地把房地產開發項目劃分為四個階段:概念階段;開發階段;實階段;收尾階段。概念階段項目管理的主要內容是好可行性論證;開發階段項目管理的主要內容是好人、財、物及一切軟硬體準備;實階段項目管理的主要內容是保證質量、進度、成本;收尾階段項目管理的主要內容是評審、驗收及項目交付和結束作。針對不同階段的項目管理的現狀分析,提出完善的對策,最後是對房地產開發項目管理的進一步思考,提出房地產開發項目管理的關鍵性原則及應處理好的幾個問題。
  4. First, this paper looks for the national experiences that organizing city traffic in the rodeway system, in conditions of the mobile and no - mobile number being big. then analyzing the questions and reasons in middle - scale - city roadway system, on the base of studying characters of use - land and residents journey, transportation tools and relations of the transportation and economy development, put forward some proposes in roadway system on the base of middle - scale - city characters of basic construction and solving the new problems of city traffic. through analyzing the relations of middle - scale - city roadway system, city land - use and land - shape, put forward some development antidote. in the circumstance of road facilities being lack, improve the level of traffic management of city roadway system, improve traffic environment of city roadway system. put forward some revised proposes on road - net norm of middle - scale - city road system in our country ; consider the plan of isolating mobile form no - mobile in the organization of roadway system ; construct revaluating system of city roadway system. at last through studying a typical case of yuncheng, put forward some solutions and measures ; through using evaluating system, evaluate, contrasts and analyses the present conditions in city roadway system and planning program

    本文首先尋求國外機動車和非機動車擁有量都較大的情況下,為好城市交通在道路系統面所取得的可供我國借鑒的經驗,然後在對我國中等城市用地特徵、居民出行特徵、交通具、交通與經濟發展的關系等進行分析的基礎上,剖析中等城市道路系統現狀存在的問題及其形成原因,以及對今後城市交通將要出現的新問題,提出以中等城市的交通結構特點為基礎的機、非分流道路系統的建議;通過分析中等城市道路系統與城市土地開發、城市用地形狀等之間的關系,並相應其提出發展的一般對策,在道路設不足的情況下,加強城市道路交通系統的管理,提高城市道路交通環境,對我國中等城市道路系統在道路網指標上提出修正意見,對道路系統機、非分流進行思考;並建立了城市道路系統評價指標體系;最後以運城市做為實例分析,具體提出近期處理的對策與措,並運用評價體系對城市道路系統現狀和規劃進行評價對比分析。
  5. Applying forecasting and controls theory, the author analyzes the statistics data of civil use of urban gas in the wisco, establishes forecasting models for the daily and hourly gas consumption, and compares the model result with the real load. on this basis, the author maintains that it is necessary to adopt control measures and reasonably organize production. moreover, the author puts forward a feasible plan to improve the current production technology, in order to meet users " needs and meanwhile reduce cost of production and increase enterprise profit

    運用預測與控制理論對武鋼民用煤氣歷史統計數據進行分析,建立了日用氣負荷和小時用氣負荷預測模型,將預測結果與實際負荷進行對比,採取控制措進行生產調度,合理生產,提出了改變現行生產藝的可行性,以達到既保證用戶需要,又降低生產成本,增加企業利潤的目的。
  6. The damming technique is relatively perfect now, but because of the problems in construction management are more and more severe, such as construction scheme and matching machine, which manifest the high construction expenses

    雖然碾壓混凝土築壩技術已達到較成熟的地步,但是由於採用不同施工組織方案和機械配套面存在的管理問題越來越突出,這集中反映了碾壓混凝土壩費用的巨大浪費。
  7. Training plan, practice design, network administration system build a foundation for teachers " continuous education to meet the requirement of subjective development. school - based training, curriculum development, non - curriculum study and education via internet are ways of teachers " subjective development. plan and development assessment can effectively stimulate teachers " subjective development

    培訓規劃、實、網路管理系統為適應主體性發展的教師繼續教育自體系奠定基礎;校本培訓、課程開發、非課程化研修、網路教育是發展教師主體性的途徑;約計劃與發展性評價則能有效激勵教師的主體性發展。
  8. In view of the general prevalence of the obscure financial orientation, backward management mode and ambiguous property right and disorderly capital management of the conglomerates, this article, for the purpose of effectively ironing out the series of existing problems, puts forward the augment that corporate groups ’ financial management mode must be persistently based on capital operation as its core, thus demonstrating the principle of the organic combination of the centralized power and decentralized power, establishing a financial management mode characterized by the integration of centralized power and decentralized power, which will be conducive to bringing into full play the financial control function of the parent company and the subsidiaries, stimulating the initiative and creativity of the subsidiaries and effectively controlling the risks of the operators and the subsidiaries

    以建築、房地產開發為主營業務的大型集團型國有企業為例,他們在財務管理面普遍存在著分權過度的問題,對子公司的財務行為難以統一協調,無法合理配置有效資源,致使企業集團的凝聚力、控制力難以實現。因此,構建有效的財務管理體制,強化企業集團的財務管理職能,灌輸財務管理的戰略思想已迫在眉梢。因此,本人希望充分利用本人在吉林大學的三年碩士班學習掌握的財務管理知識,結合導師指導和自身作體會來了解分析當前企業集團存在制約企業集團良性發展的普遍問題入手,基於集團的模式、制度建設,預算管理等面進行深刻剖析,結合現實例系統並有針對性的提出了一套具體的集團企業財務管理戰略模式,以期能對企業集團的生存與發展具有較好的現實意義。
  9. This paper outlines the design and construction conditions of the yangtze estuary deepwater channel regulation project, describes the comparison and selection of the design schemes for the 1st & 2nd phase projects, and expounds the construction organization and administration, the core of which is dynamic management

    摘要全面介紹長江口深水航道治理程整治建築物程和疏浚程的設計條件和條件,並在此基礎上介紹一、二期程設計的優選情況,以及程實過程中以動態管理為主要內容的管理情況。
  10. Simulation and optimization of large hpp construction : to pursue best construction proposal by optimizing theory and method and applying information technology, including layout of access, providing and allocation of construction equipment, coordination of construction progress, arrangement of resources, selection and arrangement of construciton materials to develop three - dimensional modelling and optimize the system

    大型水電模擬與優化? ?根據當前水電與管理的現狀,通過優化理論與法、信息技術等的應用,尋求最優化的施工組織方案,包括道路的布置、機械的配備與調度、進度的協調、資源配置、材料的優選、料物的優化調配等,開發三維模擬與優化系統。
  11. This paper presents a study and analysis of project management organization ' s set up, progress control, quality control, safety control, capital control, bidding management and construction spot management, risk management etc. and on the basis of the study and analysis, a set of strategic plan about project management appropriate for beijing huamao center is worked out

    本文從投資程項目管理的角度對北京華貿中心程項目建設管理模式、機構的設立、期控制、質量控制、安全控制、投資控制、程招投標管理、合同管理、信息管理、現場管理、竣驗收及項目后評價管理、風險管理等面作了較深入的研究、分析,制定出一整套適合本程項目特點及市場定位的程項目的建設管理策劃
  12. It has been proved that the design and construction organization presented in this thesis for the strata consolidation by means of high pressure shot grouting method be a success, and the design procedure and construction scheme can provide a guide for soft foundation treatment and waterproof in underground engineering

    實踐證明,高壓噴射注漿法地層加固的設計和是成功的。本文提出的設計思路和施工組織方案對地下程軟地基處理和防水止滲具有指導意義。
  13. The bidders are encouraged to bid at rational low quoted price by taking such measures as technology innovation, design and construction optimization, enterprise management improvement, etc. so as to reduce the engineering costs and minimize the bidding quoted price

    通過實例分析說明,應鼓勵投標人通過技術藝更新、優化設計及施工組織方案、建立企業自己的內部定額、建立良好的企業信譽、強化企業內部管理等一系列做法,真正節約程成本,降低投標報價,以合理的低價去競標,有效推進建築市場的健康發展。
  14. Organize preparations of proposals in terms of project regarding technical changes

    公司技改程的編制,現場管理,以及程驗收的相關作。
  15. 6. to going on wheels, this dissertation brings forward project monitor scheme and construction design of daheba landslide

    6 .文中提出了滑坡治理中的程監測及項目設計,為治理程順利實打下堅實的基礎。
  16. ( 7 ) the monitoring system of landslide and the project management design are presented at last, which lays strength foundation for the harness engineering

    ( 7 )提出滑坡及危巖綜合治理程中的滑坡監測及項目設計,為綜合治理程的順利實打下了堅實的基礎。
  17. In the end, an evaluation system has been developed according to the cascade analytical method in order to make a scientific evaluation to the construction scheme, the project scheduling and the layout system of the drawings

    最後,本文利用層次分析法,開發了設計評價系統功能模塊,從而對進度計劃和平面布置圖的確定做一個科學的、量化的評價。
  18. With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge

    摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大橋北汊水中墩基礎程特點和要解決的關鍵技術,介紹了的原則制定和實過程、各墩位平臺及圍堰的比選,總結了該橋深水鋼圍堰的法。
  19. This paper on the technique in application in the engineering will make complete analysis, compare construction technique and construction structure technique by technique economy, analyze and appraise construction scheme, explain the problem appearing in engineering, study its engineering application value

    對坑式靜壓樁頂升糾偏技術在程中的應用作全面的分析,對技術、技術進行技術經濟比較,對進行分析和評價,對程中出現的問題進行解釋,研究其程推廣價值。
  20. In this paper, a systematic study is carried out on the harness engineering of dingzhuang landslide and dangerous rock in the three gorges reservoir areas, which includes the evaluation of hazard, the stability analysis and the supporting system of landslide and dangerous rock, the monitoring system and the project management design

    本文結合長江三峽庫區重慶市豐都縣丁莊裂口業區滑坡及危巖,把滑坡與危巖這兩種最為常見的地質災害形式的治理作為一個系統程進行了全面地分析研究,主要包括滑坡災情評價、滑坡穩定性分析與程治理技術、危巖穩定性評價及治理、治理程監測及項目設計等幾個面。
分享友人