施工階段 的英文怎麼說

中文拼音 [shīgōngjiēduàn]
施工階段 英文
construction stage; construction phase
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1. (臺階) steps; stairs 2. (等級) rank 3. [醫學] (耳蝸的三個螺旋管的任一個) scala 4. [數學] order 5. [地質學] stage
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 施工 : be in the process of construction; be under construction; build; construction
  • 階段 : stage; phase; period; gradation; bench
  1. Destabilization style of an arcuated built - up system bridge, influence of nonconservative force of hanger rods, comparative between stress value in construction stage and stress value in finished bridge stage, stability coefficients in bridge code, these are discussed deep

    著重對失穩類型、橫撐在穩定中所起的作用、吊桿非保向力的作用以及施工階段的應力和成橋應力的比較、規范中穩定安全系數的規定進行探討。
  2. The monitoring of cracks of floor slab at construction stage

    現澆混凝土樓板裂縫的施工階段試驗研究
  3. In particular only a successive programme of injection of the vertical joints renders the work monolith in respect of the succeeding masses and stages.

    特別是,對後期壩體與以後施工階段而言只有垂直接縫的分期灌槳程序,才能給與程以整體性。
  4. This paper introduces the developing tendency of the space structure and the application of the pretensioned space lattice structure, summarize the analysis method and relation between lattice structure and pretensioned space lattice structure. dissertate the space pole - truss displacement method, tendon working principle, set forth the method of optimal design and whole process design. includes the use stage design and construction stage design of pretensioned space lattice structure

    本文首先介紹了空間結構的發展趨勢及拉索預應力空間網格結構的應用情況,概述了網格結構與拉索預應力空間網格結構的分析方法及其相互關系,論述了空間桿系桁架位移法,拉索作用機理,闡述了拉索預應力空間網格結構的優化設計及全過程設計的設計方法,包括拉索預應力空間網格結構使用的設計和施工階段的設計。
  5. It can diagnose quantity limitation ( accident ) of building construction in construction period, and commentate the reasons, measures of prevent and disposal of the quantity limitation ( accident ). the user also can seek information about quality control of building construction in construction period ( quality standards, quality control point, quality control flow, quality of building material and build machinery, laws and regulations and so on )

    它包含了建築程在施工階段各不同分部和分項程常見質量缺陷(事故)的診斷、原因分析、預防和處理。用戶還可通過本系統查找建築施工階段質量控制的相關資料(如質量控制標準、質量控制點、質量控制流程、程材料質量控制、機械質量控制及有關法規等) 。
  6. The three - dimensional flutter analysis in frequency - domain of suspension bridges and theirs flutter stability when construction is carried out in terms of dealing with the project of constructing a suspension bridge ? ancang jiang bridge, besides with other engineering projects

    本文以瀾滄江懸索橋為程背景,結合其他幾個程實例,討論了三維顫振頻域分析方法和懸索橋施工階段的顫振穩定性問題。
  7. According to the principle of ring - like strands operation, the mechanical analytic solution of presressed concrete penstock under the uni - ring - like radial loads is given out based on the theories of elastic footing beam

    根據環形預應力作用機理,結合彈性地基梁理論,提出了單環預應力作用效應的計算方法和預應力混凝土壓力管道施工階段的驗算方法。
  8. In virtue of finite element program, this paper calculates the model of rc - masonry combination arch bridge in the stages of construction and use in this paper. based on these data, it analyzes the structure behavior of the reinforced concrete arch ribs and the masonry arch ribs using methods of inner force and stress

    本文藉助有限元程序對rc -石砌體組合拱橋的計算模型進行了施工階段和使用的計算,並採用應力疊加和內力疊加兩種方法對rc拱肋和石砌體拱板的受力特性進行分析。
  9. The half analytic formula is reasoned out, which is applied to the sensitivity analysis on design parameters. through the sensitivity analysis of design parameters in constructing phase of nanpu bridge, the main design parameters are confirmed. based on this, the real value of parameters are identified by least square method, by this token, the error of design parameters can be eliminated in the process of construction control

    為了減小鋼管混凝土拱橋過程中的控制誤差,本文推導出了用於結構設計參數敏感性分析的半解析公式,並對南浦大橋各施工階段的結構參數進行了敏感性分析,從而確定出該橋的主要設計參數,在此基礎上,利用最小二乘法對這些參數進行識別,估計出各參數的真實值,以消除控制中結構設計參數誤差。
  10. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉程質量控制的重點包括:設計控制好方案對比、設計優化,特別是水建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高設計質量和深度,注重控制設計成果的長期效益;施工階段協助業主選擇好承包商,制定出嚴謹、完備的合同,搞好設備監造,嚴格執行質量控製程序,使時時處于受控狀態;同時要提高承包商的質量自控能力,堅持質量的全過程、多方法、多體系控制。
  11. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    高揚程梯級提水灌溉程的投資控制,在設計應逐步推行限額設計的作法;施工階段以優化方案,審簽圖紙,嚴格計量支付為重點,防止投資失控,同時要謹慎對待程變更,正確處理索賠事宜。
  12. However, it is a prevailing practice in highway projects in our country that the feasibility studies in the preliminary investigation and the appraisal of operation cost in later stage fail to carefully and thoroughly analyze the impact of those indeterminant factors on a proposed project and the probability of those factors. furthermore, in construction period, only those major uncertain factors ( say, wars ) are written in the contract as a part of unpredictable risks so as to rectify the responsibilities of the parties as named in the contract, but the minor factors ( say the change in drawings ) are not singled out but included in other contrast articles

    在國內公路項目前期可行性研究和後期評估運營經濟成本時,只簡單地對一些影響項目的不確定性因素羅列出來而沒有認真分析這些不確定性對整個項目影響的大小和其發生的可能性大小;在項目實過程(施工階段) ,只是把一些大的不確定性(如戰爭)作為不可預見風險成為合同條款雙方分清責任的一部分,而一些小的(如圖紙的變更)一般不單獨列出,而包含在其它合同條款中。
  13. Three precautionary measures to prevent natural gas hydrates in pipe from blocking are put forward, that is, not to used bending pipe if possible during construction stage ; increasing pigging frequency before pipeline commissioning to elimninate water within pipe ; injecting inhibitor in regular way

    提出了三項預防水化物的措施工階段避免過多使用彎管;投產前增加吹掃次數,徹底清除水;運行初期定期注入抑制劑。
  14. First of all, this article has been clear several concepts about construction cost, development cost and complete cost. the construction cost constructs by the preliminary engineering cost, the infrastructure expense, the construction and installation engineering cost, the necessary facility spends. the development cost constructs by the land cost, constructs the cost, the development indirect expense. the complete cost constructs by development cost and period expense

    針對這一社會熱點問題,本文以長影世紀村一期程為例,從成本控制理論入手,敘述了房地產開發成本構成,按照房地產開發進程的先後順序進行展開,較為詳細地論述了項目前期、規劃設計、招標采購環節、施工階段、銷售環節、期間費用的成本控制措
  15. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
  16. Participates in planning and execution of monthly hse campaigns and incentive / recognition plan and implement this plan during the project construction phase

    參與計劃和落實每月hse作安排,制訂表揚和獎勵計劃,確保在施工階段順利執行。
  17. Participates in planning and execution of monthly hsse campaigns and incentive / recognition plan and implement this plan during the project construction phase

    參與計劃和落實每月hsse作安排,制訂表揚和獎勵計劃,確保在施工階段順利執行。
  18. Attend the installation and commission of on - line analysers during the capital construction and production preparation phase to ensure smooth start - up of plant

    參加在線分析儀器在施工階段和試運轉的安裝和調試以確保裝置平穩運行。
  19. Several common methods of supervisor ' s control to progress in the phase ofconstruction

    施工階段監理對進度控制的幾種具體方法
  20. Vibration control of steel tower of large span cable - stayed bridge under construction

    大跨度斜拉橋鋼塔施工階段振動控制
分享友人