施測測站 的英文怎麼說

中文拼音 [shīzhàn]
施測測站 英文
occupied station
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. A pure software solution is given in order to gather more tracking data. the reason of the zenith - blind - zone forming is analyzed detailedly. the conclusion is that the extent of the zenith blind zone was restricted by three parameters : maximum azimuth angular velocity of tracking mount, flight level and airspeed of the target

    本文依據不改變系統硬體結構的研究思路,提出一個基於目標軌跡預技術的解決過天頂跟蹤的方案構想,給出具體實步驟,預計可使系統單單圈次跟蹤採集到的有效數據總量提高約一倍。
  2. And now as we know all of haier washing machines have passed the noise test. littleswan and royalstar declaim all of their washing machines are silent products. on the opposite, the prices of some washing machines go down, even under 500rmb

    據悉,目前海爾全線洗衣機產品都已經通過了噪音檢,此外,小天鵝榮事達也都出來宣布自身的洗衣機都屬于靜音」產品,與之相對,在噪音標準實不久,部分洗衣機產品價格開始跳水」 ,甚至出現了不500元的超低價位。
  3. To apply the real - time observation system will increase the safety and equability of production ; it provides scientific and rational reference to aid in operating power station properly and economically. according to the characteristics of the power station of chengdu banknote complex, the real - time observation system is developed, during the period of developing and designing this system, 1 have mostly completed following works : 1

    對動力實時監系統,將大大提高動力運行的安全性和平穩型,對提高產品質量、實現安全運行起到積極的作用;同時,可以為科學合理調度運行機組提供理論依據,從而實現最佳經濟運行,為企業創造效益。
  4. The route choice for fishway should follow the earlier principle and combine the actual situation of the project and decided by reconnaissance and measure of reconnaissance investor, design and constructing unit together

    魚道線路選擇遵循前面的原則,結合本電的實際情況,由投資方、設計和工單位共同進行勘察、量而定。
  5. The way of taking one nth out of capacitor ' s the first harmonic capacitive reactance as its nth harmonic impedance is verified whit the data from tang7c. according to the approximately estimating method, the first harmonic impedance of 220kv system is calculated. on the basis of the models, this paper gives the harmonic equivalent circuit of substation and gives the b ( n ) function of the harmonic time n. when the capacitors has different combination, b ( n ) ' s value will also change, with the inputting local measurement data, the paper studies the series and parallel resonance at the substation, and deduces that the reason the capacitor ' s fuse of tang6c is frequently interrupted is that its capacitor current contains a large number of 5th harmonics, and that the reason the discharging pt of tang7c capacitor being exploded is also that the 7th and 9th harmonic currents are amplified

    據此,對該進行了串聯諧振分析和並聯諧振分析,並結合試數據和有關變電的運行記錄,指出了導致該電容器湯6c頻繁燒保險的主要原因是5次諧波電流含量偏高,引起湯7c放電pt爆炸也是因為7次和9次諧波電流被放大。針對這些導致湯陰變電補償電容器故障的原因,提出了相應的諧波治理措,包括針對湯6c電容器5次諧波電流含量偏高的原因,提出了停運湯6c電容器或者通過把湯sc電容器的部分容量併入湯6c電容器(湯sc其餘部分停運)以增加湯6c諧波承受能力的措;針對# 2變低壓側7次和9次諧波電流被放大的現象,提出了在湯7c電容器上加裝一定百分比的串聯電抗器的措
  6. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據工程實踐,提出了用全儀直接量平距、高差來代替斜距、天頂距作四等及四等以下控制網量的理論依據和方法,並以張河灣抽水蓄能電工控制網為例進行了比較計算。
  7. This paper draws lessons from the design experiences of domestic large scale power station which uses gis technology and combines with the 330kv gis design of the gong bo xia and li jia xia power station that are designed the northwest investigation design and research institute. this paper not only advances some common questions about gis such as selecting model and demonstrating, compiling technology standardization of the device, layout and design, test, enviromental protection and maintenance, etc, but also supplies effective solution commonly used in engineering

    本論文借鑒國內採用gis技術的大型電的設計經驗,結合國家電力公司西北勘設計研究院承擔的公伯峽、李家峽電330kvgis設計,提出gis在選型論證、設備技術規范書編寫、布置設計、試驗、環保維護等方面的常見問題,並提供在工程應用中較常用的有效的解決措
  8. Based on expounding the construction of the new socialist countryside, this paper probes into how to use the total station to make the digital geographical map, and sums up the problems that should pay attention to in making the digital geographical map

    在闡述社會主義新農村建設的基礎上,著重探討了在新農村建設中如何用全繪數字地形圖,並總結了數字化圖實過程中應注意的問題。
  9. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車大跨度地下空間dk7 + 692斷面工支護體應力監的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量方法及試手段;分析了支護體初期支護工字鋼拱應力、錨桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  10. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電攔河閘壩及地基的應力應變分析:被成都勘設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  11. Mechanical vibration - balancing machines - enclosures and other protective measures for the measuring station

    機械振動.平衡試驗機.用機罩和其他安全保護措
  12. Construction survey technology for upper reservoir of zhanghewan pumped storage power station

    張河灣抽水蓄能電上水庫量技術
  13. How to carry out metrological certification in environmental monitor station

    淺談煤礦環境監如何實計量認證
  14. Under this circumstance, the advanced instruments and techniques such as total station and gps are applied during the construction survey, which play important roles in the controlled survey and the detailed survey with good effects

    量中採用了全球定位系統( gps )和全儀等先進的儀器和技術,它們在及時完成控制量和細部量中發揮了重要作用,取得了好的效果。
  15. The gwr c032 scg installed at jiufeng geodynamic station, wuhan / china, is the unique instrument not only in china but also in the asian continent. it is undergoing the global geodynamic project ( ggp ) proposed and executed by the committee on the study of the earth ' s deep interior ( sedi ) belonging to the international union of geodesy and geophysics ( iugg )

    武漢九峰地球動力學觀的gwrco32超導重力儀是中國也是亞洲大陸唯一的一臺超導重力儀,正承擔由國際大地量與地球物理聯合會下屬的地球深內部研究小組組織實的全球地球動力學計劃( globalgeodynamicproject , ggp ) 。
  16. Combining the construction survey of expressway, this paper presents the leveling survey method which adopts total station optical electronic tacheometric theodolite instead of leveling instrument, and gives a comparison between the two kinds of devices from such aspects as speed and accuracy, which reveals the reliability and efficiency of the application of total station optical electronic tacheometric theodolite for class four leveling survey

    摘要結合高速公路的量,對在工程工過程中可以用全儀代替水準儀進行水準量的方法進行介紹,並從速度、精度對使用兩種儀器進行了比較,說明用全儀進行四等水準量的可靠性和高效性。
  17. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機試驗絕緣材料試驗室等先進的實驗室設試手段,使產品從原材料進產,到成品出產的各項電器性能試均能滿足設計要求。
  18. Mechanical vibration - balancing machines - enclosures and other protective measures for the measuring station iso 7475 : 2002

    機械振動.平衡機械.用防護罩和其它保護措
  19. Construction measurement technology for main building in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期航區航樓工程量技術
  20. The remote communication is realized by two ways : ftp and defined form data package. finally, the thesis deals with the interference problem and the anti - interference techniques for data collector and monitor station

    由於微機控系統中存在各類干擾,論文最後分別對數據採集器、監和監控中心的干擾問題和採取的一些軟體抗干擾措進行了討論。
分享友人