曝氣系統 的英文怎麼說

中文拼音 [tǒng]
曝氣系統 英文
aerating system
  • : 動詞[書面語] (曬) expose to the sun
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. On basis of the technology of activated sludge, the thesis researches how to accomplish the automatic control system of daily sewage processing unit on ship. the thesis discusses the control of the sludge of first deposit pool, do of aeration pool, the refluent sludge, the waste sludge, the amount of medicament and the allocation of flow in detail. because the aeration pool is very important in the system, the thesis discusses it at length including the control of air - blower and so on

    在活性污泥法工藝特點的基礎上,文章研究整個污水處理過程自控的實現,具體討論了初沉池污泥、池溶解氧、污泥迴流、污泥廢棄、藥劑投放以及流量分配等控制迴路的實現,由於整個池作用尤為重要,因此對其進行了全面的討論,包括利用變頻風機、控制解耦等方法。
  2. Activated sludge system, aerator, aerobic treatment system, anaerobic treatment system, blower, diffuser, rotating biological contactor, trickling filter

    活性污泥機、耗氧處理、厭氧處理、鼓風機、滲透器、旋轉式生物過濾器、滴濾池
  3. Specification for design of aeration blowing system

    鼓風曝氣系統設計規程
  4. Aeration system comprises one circle concrete tank which equipped with one ( 1 ) set of submerged aeration header, one ( 1 ) set of re - circulation pumps and air blowers

    深水射流曝氣系統為一圓形池,有一組射流頭,一個循環水泵。
  5. The thesis also discusses the thermal blooming and physical of the heat halo produced by intense laser. the thesis emphasizes on otf and psf of atmospheric turbulence. taking three screen systems as the example, we get the ideal approximation model, especially the short - exposure otf

    並介紹了強激光產生熱暈的理論模型及其物理特性機理,重點介紹湍流大的otf和psf ,以三種屏為例,得到湍流大的理想近似模型,特別是短光otf 。
  6. Discussion of the application and foreground of falling water aeration with the process of sewage treatment

    跌水曝氣系統在污水處理工藝上的運用前景探討
  7. Design standard of aeration blowing system

    鼓風曝氣系統設計規程
  8. Offers waterway and wetland maintenance, weed and algae control, fish stocking, stormwater drainage system services, flying insect control, wetland plantings, water testing, fountain installation and repairs

    -集污水處理產品設計開發,設備,工程承包於一體。自主開發有懸掛鏈裝置及自動化控制,供應設備。
  9. Putting the potassium permanganate into the filter can improve its effect, the removal of organics and ammonia is increased, the influent concentration can satisfy the water reuse standard. but the turbidity of influent is unsatisfactory. the c / n ratio is the key factor to influence the nitrogen - removal of the anoxic / aerobic two - stage baf when the reflux ratio 、 hydraulic loading and the ratio of gas to liquid in aerobic filter are fixed. the anoxic / aerobic two - stage baf has a good removal of organics at different c / n ratio when the reflux ratio is 2, hydraulic loading is 2. 55m ~ 3 / m ~ 2 ? h and the ratio of gas to liquid in aerobic filter is 3 : 1. the influent concentration of organics is blow 7mg / l. from the beginning to 30cm of the anoxic filter, the removal of the organics is significant ; as the c / n ratio increasing, the influent concentration of ammonia is decreasing. when the c / n ratio is 3. 60, the enfluent concentration of ammonia is 3. 05mg / l which satisfies the water reuse standard. when the c / n ration is less than 3. 60, because of the imperfection

    迴流比為2 : 1 ,水力負荷為2 . 55m3 / m2 ? h ,好氧柱水比為3 : 1時試驗表明:不同的c / n ( 1 . 05 7 . 45 )下,兩級生物濾池對有機物有很好的去除作用,出水有機物濃度小於7mg / l ,其中在缺氧柱進水端30cm內對有機物的去除最為明顯;隨著c / n的增加,出水氨氮濃度降低,當c / n為3 . 60時,出水氨氮濃度降到3 . 05mg / l ,已經滿足回用水的氨氮標準; c / n < 3 . 60時,因為缺氧柱的不完全反硝化,體中硝酸鹽氮和亞硝酸鹽氮發生積累影響了好氧柱的硝化反應使氨氮降解效果較差;對總氮的去除隨著c / n的增加而增加,當c / n為3 . 60時,出水總氮已經降到11 . 18mg / l ,滿足回用水的要求。
  10. Considering the higher energy consumption and greater fluctuation of venting water ’ quality in activated sludge process widespread adopted, this thesis applies the optimal control strategy to the aeration process of wastewater treatment. the research supplies the preparation of the water treatment integrated equipment with the theory support, also acquires the matter of academy studies and application

    論文針對三峽庫區城鎮目前普遍採用的活性污泥工藝過程中能耗過大、出水水質波動較大的現狀,將最優控制策略應用於污水處理過程中,不僅為水處理集成化設備的研製提供了理論支持,而且對提高污水處理運行的穩定性、可靠性以及降低能耗都具有重要的理論價值和實際意義。
  11. Manufactures and distributes analytical instruments and reagents for water testing and water quality analysis, including portable systems test strips, etc., laboratory instruments, and process analyzers

    -製造水處理成套設備,包括格柵除污機充氧潷水器列和沉砂池除砂設備等。
  12. The effect of temperature on nitrification in a two - stage baf system used for the treatment of ammonia - rich river water was investigated

    考察了溫度對處理氨氮較高的河水的兩級生物濾池中硝化反應的影響。
  13. The problems of carbon source supply and sludge age control could be effectively solved in the processes by means of " one carbon source for two uses " and " two - sludge system ", meanwhile phosphorus and nitrogen can be removed with less oxygen requirements and sludge production

    該工藝以其特有的「一碳兩用」和「雙泥」 ,有效解決了常規生物脫氮除磷工藝的碳源供求矛盾和泥齡控制問題,可同時獲得較高的除磷和脫氮效率,並具有所需量少,剩餘污泥排放量低等特點。
  14. The control system consists of fuzzy controller, blast and aeration system, frequency control equipment and do tester

    整個控制由模糊控制器、鼓風曝氣系統、變頻調速裝置和溶解氧測試儀組成。
  15. On installation technology of aeration system in sewage plant

    淺談污水處理廠曝氣系統安裝工藝
  16. Installation technology for the aeration system of the disk aerator in sewage disposal plant

    污水處理廠盤狀曝氣系統安裝工藝
  17. When fitted with check valve, it can also be used in intermittent aeration system

    器配置止回閥時,還可用於間歇式曝氣系統
  18. Bqq series corundum porous diffuser is a aeration device used in conventional, extended activated - sludge system for industrial and municipal wastewater treatment engineering

    產品簡介: bqq列剛玉微孔器適用於工業污水、市政污水處理工程中傳的、擴展的活性污泥處理工藝。
  19. The author ’ s contribution has been addressed in detail logically in this paper in the manner of running up the control strategy of minimum energy loss into the aeration process of wastewater treatment

    論文以較好的邏輯闡述了活性污泥中污水處理過程能耗最小控制策略的研究思想,充分體現了作者所作的大量工作和貢獻。
  20. Main rehabilitation projects are technological facilities, establishments, pipelines, mud evaporation, electric system and automation apparatus. the rehabilitation project started from march 9

    主要改造項目有工藝設備設施管道和工藝污泥脫水電和自控儀表。
分享友人