最大上載速率 的英文怎麼說

中文拼音 [zuìshàngzǎi]
最大上載速率 英文
max. upload speed
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : 上名詞[語言學] (指上聲) falling-rising tone
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  • : 率名詞(比值) rate; ratio; proportion
  • 速率 : speed; rate; tempo
  1. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一情況本文對冶金輔傳用變頻輥道電機的設計進行了系統研究。首先對變頻器和變頻輥道電機的運行特性進行詳細分析,變頻器輸出的電壓波形諧波,沖擊,電壓高達6600v / s ,是普通正弦交流電壓的20倍;軋機輔傳輥道對電機提出了十分嚴格的要求:其運行頻很低,額定頻在8 - 20hz ;調范圍寬,低運行頻低到0 . 5hz ,起動次數相當頻繁,每小時高達600 - 800次,沖擊負荷,過能力要求較高。
  2. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高公路試驗段在高堆情況下的固結沉降曲線;並對以曲線特徵進行了分析,得出各時間段曲線斜、角度在整個斷面的變化規律,以及沉降值與斜、角度變化之間的線性回歸關系。
  3. He finds the pitch range after calculated the three important parameters through the bladed for windows software, then presents an optimized control strategy that regulate the pitch angle in terms of the wind speed. it must control the output power because the variational output power brings the variational loads. he confirms and optimizes the control strategy that the output power is the control target, the output power is divided into three parts

    將功作為系統控制的目標,將功分成三段進行控制,在低風區,荷是有限的,以功化作為控制目標;在額定風附近,由於處在升力曲線斜的變化點,功變化較,應盡快調整槳距角進入失區工作,減少荷的波動,該額定風區的下工作點要通過現場試驗的手段來確定;在額定風,使功維持在額定輸出,減少功波動,並通過bladed軟體的模擬計算對控制策略進行了驗證。
  4. Secondly, to achieve the independent regulation of active and reactive power output from the generator side which is designed for the purpose of tracing the maximum wind - energy capturing. the paper has analyzed the mathematic model of the ac excited doubly - fed machine and the stator field orientation control strategy of the motor as vscf wind power generator. thirdly, it has put forward and designed the dual pwm converter with the capacity of energy flowing bidirectional aimed at the demand of rotor energy bidirectional flow. the author constructed reliable and integrated experimental system and did a series of experimental study including no - load, cutting - in network and power generation at, below and above the synchronous speed

    論文首先分析了風機運行特性及其佳風能利用原理,通過模擬及實驗驗證了採用直流電機的輸出特性模擬風力機的輸出功曲線的可行性,並給出了模擬系統的硬體結構;然後為了實現交流勵磁發電機有功、無功功獨立調節機理,分析了交流勵磁雙饋發電機的數學模型和在追蹤風能捕獲變恆頻風力發電時必需的定子磁鏈定向矢量控制策略;針對雙饋發電機轉子能量雙向流動的要求,提出並設計了具有能量雙向流動能力的雙pwm交流勵磁用變頻器;後為實現從理論到實踐的全面研究,研製出了一套小功完整的雙pwm變頻器交流勵磁的雙饋風力發電機實驗系統,進行了空、並網、同步、下的發電運行等一系列的運行實驗;所完成的模擬和實驗研究均驗證了理論、模型和控制策略的正確性、可行性。
  5. Loading grads is another non - structure coefficient influencing loading characteristics except loading frequency. the low grads characteristics are analyzed deeply by simulation, and found that applying structure invariance principle with acceleration compensation can reduce loading grads effectively. the dissertation also simulates and compares the systems with connect hole of different size, and founds that the size of connect hole has an optimized value

    梯度是除了加之外另一個影響加性能的非結構的參數,論文作了量的模擬分析來研究小梯度加特性,得出了具有加度補償的結構不變性原理可以有效的降低小加梯度時的多餘力矩的影響;通過對具有不同的總壓力流量系數的系統的模擬比較,得出了連通孔的小在不同工況下存在一個優的值,其開度需要合理的選擇。
  6. The results show that in the later stage of the nucleation process, the maximum slip velocity is monotonically accelerating ; the slipping hot spot ( where the slip rate is maximum ) migrates spontaneously from a certain instant, and such migration is spatially continuous ; when the maximum velocity reaches a detectable order of magnitude ( at least one order of magnitude greater than the loading rate ), the remaining time is 20 hours or more, and the temporal variation of slip velocity beyond this point may be used as a precursory indicator ; the average slip velocity is related to the remaining time by a log - log linear relation, which means that a similar relation between rate of microseismicity and remaining time may also exist ; when normal stress variation is taken into account, time scale of such processes can be extended by about 2 times

    結果表明,在成核的後期階段:位移單調加增加;滑動熱點(滑動處)在後期階段開始自發性遷移,且在空間連續;當滑動達到可以明顯探測的量級時(高於一個數量級以) ,倒計時間為20小時或更長一些,這時的變化可作為臨震預測標志;平均滑動與倒計時間的關系在臨震階段呈對數線性趨勢,由此可推測微震活動增長與倒計時間同樣存在對數線性關系;正應力的變化對述時間尺度有延長作用,使之致增加到原數值的2倍。
分享友人