最大流量 的英文怎麼說

中文拼音 [zuìliúliáng]
最大流量 英文
flow potential
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. By using network flow theory, the optimization problem of power conservation is transformed into the optimal bipartition problem of a flow network which can be partitioned by the max - flow mm - cut algorithm

    利用網路理論,將節約電優化問題轉化為一個網路的優分割問題,而後者可採用小切割演算法實現優切分。
  2. Suggestion : according to the water cubage of aquarium ( pool ) and max. flux if pump, and the size of tube diameter, cut the pagoda type hose joint to match if

    建議:寶塔式水管接頭,可根據水族箱(池)的水容積及水泵,結合管徑小加以切除配套。
  3. After more than forty years of internal armed conflict, colombia has one of the largest populations of internally displaced persons ( idps ) in the world

    經過40多年的內戰,哥倫比亞目前擁有世界上的國內離失所人口。
  4. With new technique and solid, reliable, safe and nice design, rhein - p ( m ) is the certain choice for pubic place, where a great deal of people are transported

    型自動扶梯以新的技術及堅固、可靠、安全、美觀的設計,是公共場所,運送人群的必然選擇。
  5. We can get communication traffic distribution graph combined with network topology, to make certain hypothesis and then, according to mark - num algorithm, to get the maximum network traffic

    論文結合對計算機網路拓樸的研究,通過分析得出了網路的交通分布圖。根據標數演算法,求出網路最大流量
  6. The orientation path and residual network were defined, the new maximum flow algorithm in network with both node and edge capacity confined was put forward based on feasible flow decompose theorem and by way of the search in artificial intelligence

    定義了有向路徑和殘網路的概念,依據可行分解定理,引入人工智慧中搜索的方法,以鄰接矩陣為網路數據存儲結構,提出條件約束下的網路新演算法。
  7. Of them, great current capacity high accuracy pump test panel project has carried on tender on the internet, finally passed through the quality synthetic evaluation, and determined to be constructed and exploited by province mechanical and electrical design institute unit. after the project completed, it could expand the new product productivity, and substitute the import product

    其中高精度泵測試臺項目進行了網上招標,後經綜合評價,確定同省機電設計院聯合開發建設,項目建成后,能擴新產品生產能力,並能替代進口產品,提高企業經濟效益是十分必要的,同時對提高我國泵類製造水平勞動地區,同行業發展也是有現實意義的。
  8. The pcv valve sticks in the open, maximum-flow position.

    把PCV閥固定在開啟位置即最大流量位置。
  9. The pcv valve sticks in the open, maximum - flow position

    把pcv閥固定在開啟位置即最大流量位置。
  10. The small valve extends to the sum of the maximum flow of both valves

    小閥門擴了兩個閥門的最大流量
  11. Maximum flow problem

    最大流量問題
  12. In parallel installations, the larger valve handles the requirements for maximum flow down to its low flow capacity

    這種並聯安裝方式中,閥門處理降到低空穴下的最大流量需求。
  13. Meanwhile, a new system is set up and its maximal flux, the maximum online people, the longest response time are estimated and successful result is obtained sequentially

    以此為基礎,構建了一個新系統,計算了該系統的最大流量多在線人數和長的響應時間,取得一定的實際效果。
  14. Project line vertically up to intersect with the valve characteristic curve and from this point project line horizontally across to the left of the chart and record the percentage of maximum flow rate

    畫出垂直向上的線與閥門特性曲線相交,從這個點畫水平線穿過圖表左側,記錄最大流量的百分比。
  15. Wastewater collected from canteen kitchens, including that from basins, sinks and floor drains shall be fitted into foul sewer via grease traps capable for providing at least 20 minutes retention during peak flow

    來自食堂廚房的廢水,包括來自水池、水槽和地面排水管的,應經由最大流量時能夠保持20分鐘的集油器,排入污水下水道。
  16. This subject will survey some of the applications of network flows and focus on key special cases of network flow problems including the following : the shortest path problem, the maximum flow problem, the minimum cost flow problem, and the multi - commodity flow problem

    這個主題將審視一些網的應用並集中焦點在以下網問題的關鍵特殊情況:短路徑問題,最大流量問題,少成本問題,和多元物品問題。
  17. The feilonpu waterfall, with another name dadishui, is 20 kilometres to the southwest of the county seat. there is a highway linking the waterfall with the dadishui hydroelectric station. getting off the bus, visitors only need to walk two to three li to the destination

    飛瀑,俗稱疊水,瀑布位於縣城西南20公里,有公路相通至疊水電站,舍車步行二三里便可至達,瀑布的水源為珠江水系的支巴江,落差88米,最大流量達150立方米第秒,被譽赤珠江第一瀑。
  18. This dissertation is faced to the process of steel rolling to found network of manufacture material flow, basing on it founding guide line evaluation system of the cost of unit standard producing working procedure, guide line evaluation system of the quality cost of unit standard producing working procedure and guide line evaluation system of performance and efficiency ; and base on the cost data of all kinds of material flows, manufacture flow, flux data, manpower, energy consume, material consume, capital asserts occupied, fund occupied, and the production in working procedure, throughput of the materials in working procedures in the flow and countercurrent flow in the network of material flow of recorded in working procedure producing, using the “ whole closed down lane ” model to describe network of manufacture material flow of steel rolling, found the cost analyzing model system of the network faced to producing process. make the cost increasing of the producing by abnormity material flow in working procedure, and even the cost increasing of the producing procedure as the cost of the management behavior of working procedure fallen under cost evaluation guideline in responsible working procedure, so as to ration measure the factors fast correlated with management behavior by measuring the cost

    在企業管理信息化輔助工具所建立的數據平臺基礎上,建立了以基準物圖模型為基礎的軋鋼生產主程物網路拓撲圖,根據圖論的理論求解最大流量小費用;計算每個生產節點的加工成本,分離質成本,克服了單純財務數據進行成本核算所帶來的缺陷;建立了軋鋼生產主程工序含鐵物料吞吐能力基準圖模型,並根據此模型建立了軋鋼生產主程工序激勵物協調性和匹配性、工序響應物協調性和匹配性分析的過程能力指數計算方法;通過引入決策單元綜合投入與綜合產出效率優原則的模型和基於投入不變、分析產出是否有效或基於產出不變、分析投入是否有效的模型,實現了對多個績效指標在不同績效值集合之間的相對比較,並可根據投入產出效率準則、或者投入(產出)有效性準則進行排序。
  19. Analytic results show that : the lock chamber filling and emptying effectiveness is high, the filling time of a chamber in prototype is less by 17. 6 % than that in model, and the maximum discharge and discharge coefficient in prototype are larger by 32 %, 34. 6 %, respectively, against those in model

    資料分析結果表明:閘室輸水系統輸水效率高,輸水時間原型較模型縮短17 . 6 % ,最大流量較模型增32 % ,系數較模型增34 . 6 % 。
  20. According to the supply system composed by parallel connection water pump, many kinds of operation proposals in a single pump were put forward to provide the greatest possible flow on both sides of the demarcation point in the scope of the flux changes ; identified the system of pumps, electromotor, speed governor imitate method of characteristics curve of the power device and its rotating speed, efficiency, energy consumption calculation under different condition ; the analytical methods used for the operational plan for comprehensive evaluation of the economic and safety and optimal results

    摘要針對由並聯水泵組成的供水系統,提出了在以單泵可能提供最大流量為分界點的兩側變化范圍內具有多種運行方案;確定了在不同工況下,該系統中水泵、電機、調速器特性曲線的擬合方法及其各動力裝置中轉速、效率、能耗的計算式;採用解析的方法對各種運行方案進行了經濟性和安全性綜合評價,並給出優結果。
分享友人