最大載荷點 的英文怎麼說

中文拼音 [zuìzǎidiǎn]
最大載荷點 英文
point of maximum load
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Choose two nodes on the edge of the structural to compare the results calculating by the finite element program midas, then we can draw a conclusion that these kinds of space truss systems is sensitive to the libration of the dynamic wind loads. to consider this factor is very necessary in the process of design, we will use the pulsant augmentation coefficient to realize it

    比較靜力風和動力風作用下的有限元軟體的計算結果,選取結構邊緣部分的兩個節,對比它們在兩種方法計算下的位移的計算結果。經過比較可以看出重量輕、頻率低、阻尼小的柔性建築物對風的橫向振動是很敏感的,在進行工程設計時應該考慮這種因素,並可採用乘以風振系數等相應方法來加以體現。
  3. Therefore, the prestress of the cable should make sure that the cable is in the tight state in the entire process. the largest wind load which the prestressed cable truss can undertake is studied emphatically in the article

    因此,索中初始預應力應能保證索在工作的全過程中始終處于張緊狀態,以此為條件,本文重研究了預應力索桁架所能承受的值。
  4. In the light of the problems of the air balance system of model lcj1250 chain drive pumping unit, it is proposed to change the air balance with counterweight balance, and three criteria for the modification is put forward : ( 1 ) ensuring the reliability of the unit with smooth operation, low noise and long life ; ( 2 ) cutting down the production cost and using less component parts as possible ; ( 3 ) carrying out modification without such main technical parameters as stroke, pumping speed and maximum polished rod load

    針對lcj1250氣平衡式鏈條抽油機存在氣平衡故障率高和現場維修困難等問題,提出將氣平衡改造成工作可靠的重力平衡的方案,並確定了改造的三個原則:一是保證整機的可靠性,使抽油機運轉平穩,振動噪音小,壽命長;二是力求降低生產成本,減少零部件製造,盡可能選用原來的通用件,捨去平衡缸和空氣包等氣平衡附件,在原往返架主體上懸掛一個配重箱;三是力求不改變沖程、沖次及等主要技術參數。
  5. Abstract : in the light of the problems of the air balance system of model lcj1250 chain drive pumping unit, it is proposed to change the air balance with counterweight balance, and three criteria for the modification is put forward : ( 1 ) ensuring the reliability of the unit with smooth operation, low noise and long life ; ( 2 ) cutting down the production cost and using less component parts as possible ; ( 3 ) carrying out modification without such main technical parameters as stroke, pumping speed and maximum polished rod load

    文摘:針對lcj1250氣平衡式鏈條抽油機存在氣平衡故障率高和現場維修困難等問題,提出將氣平衡改造成工作可靠的重力平衡的方案,並確定了改造的三個原則:一是保證整機的可靠性,使抽油機運轉平穩,振動噪音小,壽命長;二是力求降低生產成本,減少零部件製造,盡可能選用原來的通用件,捨去平衡缸和空氣包等氣平衡附件,在原往返架主體上懸掛一個配重箱;三是力求不改變沖程、沖次及等主要技術參數。
  6. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱肋承擔壓力,系梁預應力束抵抗拱端推力,吊桿及縱橫橋面系結構承受橋面,既克服了傳統拱橋巨的拱端推力,又改善了連續梁橋較的彎矩和剪力的受力狀況,限度地發揮了拱梁混凝土和預應力鋼筋各自的特,經濟效益顯著。
  7. He finds the pitch range after calculated the three important parameters through the bladed for windows software, then presents an optimized control strategy that regulate the pitch angle in terms of the wind speed. it must control the output power because the variational output power brings the variational loads. he confirms and optimizes the control strategy that the output power is the control target, the output power is divided into three parts

    將功率作為系統控制的目標,將功率分成三段進行控制,在低風速區,是有限的,以功率化作為控制目標;在額定風速附近,由於處在升力曲線斜率的變化,功率變化較,應盡快調整槳距角進入失速區工作,減少的波動,該額定風速區的上下工作要通過現場試驗的手段來確定;在額定風速以上,使功率維持在額定輸出,減少功率波動,並通過bladed軟體的模擬計算對控制策略進行了驗證。
  8. However, it is too expensive in investment, complex in experimental techniques, difficult and dangerous in performance. in this paper to overcome these drawbacks, the similarity relations together with a new method and its principle of experiment have been developed based on the model theory of structural similarity. according to this principle, the total stress ; an be obtained as a sum of the stresses due to weight and external loading, which based on only one model experiment without any gravitational loading

    後,針對外與自重共同作用下,傳統光彈性分析法中採用離心力場模擬重力場獲得自重應力的試驗投資耗費、技術復雜且難度和不安全等嚴重缺,按照結構相似的模型理論,本文提出模型外與自重並存變動外的光彈性分析法,導出處理這個問題具體的相似律和試驗原理及方法,進行了典型實驗驗證,指出僅用外作用的模型試驗,即不用離心力場模擬重力場的模擬試驗,就可以獲得上述兩種共同作用下的應力分析結果。
  9. Presents the investigation of the heat conduction behavior, internal thermal stress field of specimen under thermal shock and microscopic damage and failure of the tungsten based composites by combination of macroscopic and microscopic analyses and integration of material science and mechanics ; describes a microscopic mechanical model based on the microstructure of components with macroscopic stress applied to the microscopic model as that of maximum principal stress at the center, and the fringe of the specimen, and the microscopic stress fields obtained through calculation by the finite element method, and concludes from test results that the maximum principal stress is first generated inside the test coupon, and a failure will be first initiated in the inclusion if the material fails at this time ; the maximum principal stress moves to the edge of the test coupon after the test coupon is heated for a period of time, and the failure will first be initiated in the base if the material fails at this time

    從材料設計的思想出發,採用宏觀與微觀、材料科學與力學相結合的方法,對鎢基復合材料的熱傳導行為、材料在熱沖擊下的內部熱應力場及材料細觀結構的破壞行為進行了詳細的理論研究.根據鎢基復合材料的細觀組織結構建立了材料細觀模型.在宏觀分析的基礎上,分析了材料微結構內部的破壞行為.分別取試件心部與邊緣主應力值的應力狀態,施加在所建立的模型上,用有限元方法計算了模型內部的彈性應力場.結果表明:試件主應力值首先產生在試件內部,此時,如果材料發生破壞將先從夾雜中開始;加熱一段時間后試件中的主應力值轉移到試件邊緣,此時材料發生破壞將先從基體中開始
  10. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特橋工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋重難施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內力的計算,確定了拱肋施工不利工況下加重量、壓重順序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  11. Then figure out the wind load in term of the load criterion and the wind tunnel test results separately. by comparing with the two results, we can draw a conclusion that the values which generated by the load criterion are bigger than these ones generated by the other. in order to calculate and design in the worst situation, the paper select the bigger basic wind stress and then turn the area - load into liner - load to receive the displacement of the nodes and the internal force of the cells generated by the static wind load

    由此,得出用於作業棚結構設計的數據,進而按建築規范和風洞試驗數據分別計算出風標準值以及基本風壓,通過對兩種靜力風計算的結果進行比較,可以看出,按規范計算風的結果在結構的整體計算中偏於保守。按照不利情況計算的設計準則,本論文選用較的基本風壓值按受力面積分配的方法把面轉化為線代入midas運算程序中,求得該結構在該靜力風作用下的節值位移。
  12. Study of practical formula about strength and rigidity of 6 - point - supported - glass using the super sap fea software to solve different calculation models - which have different parameters, such as a / b, a / c and so on, this paper achieves a series maximum deflection coefficients and maximum stress coefficients, then form calculation formulas of maximum deflection and maximum stress under the load of wind

    6支承玻璃強度剛度實用的計算公式研究採用supersap有限元分析,求出不同的計算模型(玻璃板的尺寸參量a b , a c不同) ,得出一系列撓度系數和應力系數,形成6支承玻璃在風作用下的撓度計算公式和應力的計算公式。
  13. Top displacements get largest in structure under the concentrated load, and get smallest in structure under the uniform load

    結構頂位移在頂集中下達,在均布小。
  14. It takes good use of these two numerical computation methods merits and it is valuable for defmiting the computation model of pile ? oil ; at the same time, it builds the computation model of compound pile foundation and uses the software ansys which is about finite element to build the mechanics model. in regular quality soil, the result worked by this way has good unanimity with traditional results, so it applies us strong evidence for using the way which this article tells us to solve problems which is difficult to handle in compound pile foundation, such as irregular quality, layer quality of the soil. at last, taking foundation soil ' s measuring data of liaoning technology university ' s test building for example, and using the way this article tells us to build compution module, we solve the sharing ration of pile and loading board

    本文利用有限元與邊界元耦合的方法求解樁土相互作用問題,充分利用兩種數值計算方法的優,對確定樁土相互作用計算模型是一次有益的嘗試;同時建立了群樁相互作月的數學模型,並利用有限元分析軟體ansys建立其力學模型,在均質土體中取得了與傳統解答較好的一致性,從而為拓展利用本文所述建模方法,解決群樁作用機理研究中難以處理的土體成層、非均質等性質,提供了有力的根據;後,以遼工實驗館地基土實測資料為例,利用本文建模方法,求解出承臺與樁的分擔比,對安全、經濟地進行群樁基礎設計具有重要指導作用和應用價值。
  15. Taking the results as boundary constraint and the velocity field of horizontal movement after transforming reference frame as the load of fem node, the velocity field of horizontal movement in the region is simulated, the principal strain rate field and maximal shear strain rate field are calculated, the variety characteristics of the two rate fields and relation between the variety characteristics and strong earthquake preparation are analyzed

    將反演結果作為邊界約束並將變換參考框架后的水平速度場作為有限元節,模擬區域內部水平運動場並計算其主應變率場、剪應變率場,以分析這兩個時段中這兩種場的變化特徵及其與地震孕育之間的關系。
  16. ( 5 ) another is the long - term predict utilizing the biggest index number lyapunov in the chaotic time series and the whole space method during the steady period of the road foundation load, after the overload of the road foundation finished. meanwhile, contrasts with some mature settlement predict methods, estimating some important section in the engineering synthetically, making sure an ideal outcome of the predict warp, then unload the overload of road foundation and make it satisfy the design request

    ( 5 )路基超完成後,在路基穩定期間內,利用混沌時間序列中的lyapunov指數和全域法進行長期預測,同時與一些比較成熟的變形預測方法進行對比,對工程中一些重斷面進行綜合評判,確定一個較理想的預測結果,從而對路基超進行卸,使其滿足工程設計要求。
  17. The biggest stress of glass plate appears around the hole, so the loading properties of point - supporting glass curtain are influenced by the stress states of hole ' s edge significantly

    在風作用下的其應力出現在孔邊,因此,孔邊應力狀態對式支承玻璃幕墻承性能有非常重要的影響。
  18. Tray - type cable support systems are ideal cable laying devices most broadly applied in petrolum industry, chemical industry, power and light industries. television and telecommunication, it is featured by such advantages as small weight, great loading capacity. good - looking shape, simple structure. convenient erection. quick heat dissipation and fine permeability

    托盤式橋架是石油、化工、電力、電視電訊等方面廣泛應用的敷設裝置,它具有重量輕,、造型美觀、結構簡單、安裝方便、散熱透氣性好等優,既適用於動力電纜的安裝,也適用於控制電纜的敷設。
  19. Under vertical dynamic loading, the max deflection value will decrease with the loading time diminishing and also that of the stress of asphalt pavement

    路面彎沉值與路面內各計算的應力值出現時間不同,應力在消失后立即達到值或延遲時間非常扳,而彎沉值延遲時間相對較長。
  20. It is proved by the analysis that, during the symmetric landing of that airplane, the impact load of the after main landing gear is the largest among those landing gears and the nose landing gear comprised of about 18 percent of the total impact load

    分析表明:該樣機在對稱著陸過程中,後主起落架承受的地面,前起落架輪胎僅承擔了全機18 %的沖擊分佈較普通的前三式起落架有明顯的改善。
分享友人