最小成本函數 的英文怎麼說

中文拼音 [zuìxiǎochéngběnhánshǔ]
最小成本函數 英文
minimum cost function
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : i 名詞1 (草木的莖或根)stem or root of plants 2 (事物的根源)foundation; origin; basis 3 (本錢...
  • : 名詞1. [書面語] (匣; 封套) case; envelope 2. (信件) letter 3. (姓氏) a surname
  • : 數副詞(屢次) frequently; repeatedly
  • 函數 : [數學] function函數計算機 function computer; 函數計算器 function calculator; 函數運算 functional operation
  1. We make the following assumption for when 2 is positive definite matrix, different estimators about matrix of regression coefficients and inefficiency of least squares estimate have been discussed in many documents. considered 2 is nonnegative definite matrix, this thesis derives best linear unbiased estimate of parameter matrix b and estimable parameter function kbl under the meaning of matrix nonnegative definite and the property of maximum probability of blue is investigated. next, we discuss some necessary and sufficient conditions of the equality of the lse and blue, then we derive the estimation of the deviation bet - ween the least squares and the best linear unbias estimators of the mean matrix, meanwhile a relative efficiency of lse ofb is proposed and its bound is given

    當0時,眾多文獻討論了回歸系陣的各種估計及lse的有效性,文考慮了當0的情形,給出了回歸系陣b及其可估參kbl的在矩陣非負定意義下的優估計( blue ) ,研究了它的一個大概率性質,並且討論了二乘估計佳線性無偏估計的充分必要條件,在此基礎上給出了均值矩陣的二乘估計與blue的偏差估計,定義了lse相對于blue的一個相對效率,並給出了它的界。
  2. Then the article analyses the effecting elements about the economic result of blasting and puts forward some improving measures, and summarizes optimizing model on economic result of blasting both internal and overseas bearing upon. the theory is based on the blasting cost model, which proposed by dr. zhong hanrong. combining with the specialties of water and electricity engineering, starting off through blasting result, it emphasizing considers drilling cost, deep hole bench blasting cost, reblasting cost, and the cost of bottom fleet hole blasting that in mixed loading emulsion explosive blasting

    文在加拿大鐘漢榮博士提出的爆破模型基礎上,結合水電工程的特點,從爆破效果出發,著重考慮了應用混裝乳化炸藥爆破的鉆孔、深孔梯段爆破、二次爆破和爆破后根底淺孔爆破,以塊度、振動、安全為約束條件,以這四項為目標,廣泛收集各種爆破經濟技術條件,建立了爆破優化經濟學模型。
  3. The model of this paper explores the links between the following factors and the credit rationing in china. the change of banks " attitude to credit risk may lead to credit rationing ; banks give much more emphasis on the trade cost and the payable value of collateral, which may give rise to credit rationing ; the decreasing of asset price during economic stagnation produces credit rationing ; the bias of banks " objective function from the maximization of profit and the transformation of the function relating to the reform of the financial system cause credit rationing ; if different parts of the whole markets are not integrated, the credit in the part with low capital return ratio will be rationed. during economic recession, banks tend to ration the credit in the high - risk market ; the removing of interest ceiling will narrow down the interest spread of deposit and credit at least during a period, which may strengthen credit rationing ; meanwhile, the vulnerable borrowers, including small and middle - sized enterprises, will get more credit from banks even though they have to pay a higher interest rate

    論文的模型探討了下列因素和中國信貸配給現象之間的聯系:商業銀行對信貸風險的態度變化,在辨別和控制信貸風險上開始投入大量的,這一過程會導致信貸配給;商業銀行對與法治環境相關的交易和抵押品清償價值的日漸關注會導致信貸配給;宏觀經濟緊縮時期資產價格下降會導致信貸配給;商業銀行經營目標偏離利潤大化,近幾年金融業改革過程使商業銀行目標發生變化,這一變化過程可能導致信貸配給;在市場分化的條件下,收益水平低的市場會遭受信貸配給;在經濟下滑時期,商業銀行尤其會對高風險市場配給信貸;利率市場化使商業銀行的存貸利差至少在一段時間內縮窄,利差縮窄可能加重信貸配給的程度:在利率市場化條件下,弱勢借款者,包括中企業,遭受信貸配給的程度可能得到緩解,但支付的貸款利率水平將會升高。
  4. At first we compare some kinds of investment loss function, analyze their defects and take the eignvalue of covariance matrix as the measurement of investment risk, the principle component as the information of investment market, sn and cv of the principle component as balance relationship between the profit and risk. then different portfolio selection indexes are given, and new portfolio selection models are presented, which are different from h. markowitz model. at last an example is also given

    文首先比較了幾種常用的投資損失,在分析它們的缺陷與不足的基礎上,提出了採用收益率的協方差矩陣的特徵根刻畫投資的風險;用主份綜合反映證券市場的信息;分別採用主份的差異系與信噪比反映投資組合的期望收益率與風險之間的均衡關系,並以此作為投資組合損失化與收益極大化的指標;得到了不同於h
  5. This thesis concludes the flood control situation, engineering measures and the situation of optimal dispatch method. it studies flood control engineering system, which is composed of flood prevention reservoir, river course dyke and natural detention basin, and the relationship between various flood engineering measures according to the composition and characteristics of the flood control engineering of the middle - lower reaches of beijiang. it suggests the objective function based on the least flood loss and the optimal dispatch strategy structure of the middle - lower reaches of beijiang bound with the requirements of the flood gradual progress equation combined with hydrology and hydraulics

    論文總結了我國防洪情勢、防洪工程措施及其優化調度方法研究的現狀;針對珠江流域北江中下游防洪體系的組及其防洪工程的特性,研究由防洪水庫、河道堤防和天然滯洪區共同組的防洪工程體系中各防洪工程措施之間的關系;提出了以洪災損失為目標、以水文學和水力學相結合的洪水演進方程等要求為約束條件的北江中下游防洪體系優化調度策略框架。
  6. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面優化方面,文在利用已經比較熟的縱橫斷面優化理論的基礎上,提出以工程總費用為目標,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為約束條件,通過縱橫斷面聯動優化的方法得到渠道的佳工程可行的斷面參。另外,針對部分地區的取土困難的狀況,文採用積分法計算渠道工程土方量,從而大大提高了土方量的估算精度,有助於準確控制工程投資規模及資金投向。文詳細闡述了該系統所採用的編程方法、系統構、系統各組模塊的開發過程以及灌區規劃所採用的優化方法及原理,後應用系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃果合理,基達到了系統預定的要求,具備較強的實用性。
  7. This paper consists of two parts : in the first part, we will discuss the prob - lem of the pth - mean, complete consistency for the estimators of a nonparamet - ric and linear model with l ~ p - mixingale errors ; in the second part, we will dis - cuss the problem of the rth - mean 、 complete consistency for the estimators of themodels above with weak stationary linear process errors and the uniformly mean consistency. to the nonparametric model y _ ni = g ( x _ ni ) + _ ni, 1 i n, let g _ n ( x ) = w _ ni ( x, w _ n1, … ? xnn ) y _ ni estimate the unknown function g ( x ). to the linear model y _ i - x _ i1 1 + … ? + x _ iq ? _ q, we use lse _ nj to estimate the unknown parametric _ j

    篇論文主要是由兩大部分內容構:一是關于誤差是l ~ p ?混合序列的線性回歸模型參二乘估計與非參回歸模型未知的權估計的p ~ -階平均相合性和完全收斂性問題;另一部分是關于誤差是弱平穩線性過程的線性模型參二乘估計與非參回歸模型未知的權估計的r ?階平均相合性和完全收斂性以及權估計的一致平均相合性問題。
  8. This system has the friendly windows for dialogue between person and machine, can draw and label the plan of each roll groove with the way of parameterization drawing, under the condition that giving the size of the rough blank the specifications of the finished product and the technical parameters of the roll, selecting the minimum consumption as the target function, adopting the optimization, adopting the boundary condition of the grip the strength of roll and the check of the power - generating. moreover, the plan can be outputted in the software of autocad

    系統具有友好的人機對話界面,可以在給定坯料尺寸、品尺寸和軋機技術參的條件下,以能耗為目標,採用優化方法,在滿足咬入條件、軋機強度校核、電機校核等邊界條件下優化設計出優的孔型系統,採用參化繪圖方法將優化設計結果繪製孔型圖並進行標注,終可以向autocad繪圖軟體輸出。
  9. Spline curves defined in the space constructed by polynomial and hyperbolic functions are studied in this paper. the main research contents and achievements are as follow : firstly, we generate the cardinal extended complete chebychevian ( ect ) - systems on the space constructed by polynomial and hyperbolic functions, then introduce the algebraic - hyperbolic b - spline space and identify the dimension law and zero properties. the existence of a basis of splines with minimal compact supports is demonstrated, and functions named non - uniform algebraic - hyperbolic b - splines are obtained by solving certain linear equations with a block matrix

    文主要研究定義在多項式和雙曲的空間上的樣條曲線,其內容和完結果如下:一、生由多項式和雙曲的空間上的一組典範式ect ( extendedcompletechebychevian )組及其對偶, ,證明非均勻代雙曲b樣條空間的維定理和零點定理,直接通過解塊矩陣線性方程組得到具有緊支撐的非均勻代雙曲b樣條,進而構造非均勻代雙曲b樣條曲線,還具體給出低階的表示
  10. The water quality respond relation of input - output measurements are established by systematic theory in this paper. according to the peculiarity of hydrology and the necessity of water quality inverse problem the multi - parameter inverse problem model based on ordinary differential equation is developed. the existence and uniqueness of the solution of the ordinary differential equation about two parameters or multi - parameter are to be proved. the unstability depending on errors between monitoring data and interpolation approximate data are analyzed and demonstrated. cubic spline interpolation function, the least two multiply and positive rule method are conjoined for obtained solution of multi - parameter. the results from this algorithm indicats its efficient to the multi - parameter identification in water quality modeling

    文應用系統理論,建立了水質多參輸入輸出之間的響應關系;根據河流水文水質變化特點和參反問題的需求,建立了水質常微分方程多參反問題模型.根據常微分方程參反問題的學理論,作者給出了兩參和多參水質常微分方程反問題的解的存在性、唯一性的理論證明過程和結論;還針對水質現有監測資料的測驗誤差和插值近似計算誤差造反問題的不穩定性,將三次樣條插值、超定方程二乘法和正則化演算法有機地結合使用,功地給出了水質參反問題的穩定化演算法.後給出了應用計算結果
  11. Aimed at the current problem of pipeline layout optimization technique, the research of irrigation pipeline layout and pipe diameter optimization has been done, the gis ( geography information system ) and graph theory were first put forwarded to applyed to the design of low pressure pipeline irrigation project in the paper. with the support of gis, the minimal spanning tree theory of graph theory and 120 project theory can be applied to irrigation pipeline ' s layout optimization. at the aspect of pipe diameter optimization, simplicial method and interior - point method are been used in solve liner optimization model of pipe diameter to reach minimum project cost or a nnual working cost of low pressure pipeline irrigation

    文主要針對當前南方地區低壓管道輸水灌溉規劃設計中存在的技術難點,開發研究先進實用的樹狀低壓輸水灌溉管網計算機輔助設計系統。首次提出了將gis (地理信息系統)和圖論技術應用於低壓管道輸水灌溉規劃設計及灌溉管網優化中,在gis支持環境下,應用圖論中的樹法和120規劃進行管道的優化布置。建立以管道輸水灌溉系統的年折算費用為目標的管徑優化線性規劃模型,並將內點法應用於線性優化模型的求解。
  12. The research paper is based on the the latest softwares of the managing inventory, its research subject is about simulating the most appropriate inventory quantity and ordering quantity by statisticing the probability of the random require quantity. its purpose is to provide the relied basement for determining the most appropriate inventory quantity and ordering quantity, the deterring policy quality will be raised, so the damage caused by unfit inventory quantity and the benefit of the entrerpreneur will be raised. the research method is by building the inventory management information system, the system includes automated management of parts entering and going out the datasbase. requesting the records of parts entering and going out the datasbase and displaying the sygonal when the inventory quantity is short out. computer calculating the fix period remaining, requesting remaining at any time and displaying if goods need ordering, all the partsof certain a product going out of basement and at the same time checking if the storaging quantity is enough. then simulating the most appropriate inventory quantity and ordering quantity simulating method is as follows : statisticing the random required quantity. calculating the probability, standing for the values with data range producing random data by function accordingly calculating the random required quantity. thenext step is simulating all the projects after pressing in the simulating conditions. finally selecting the best

    文通過分析國內外關于庫存管理軟體的發展情況,提出在線統計貨物出庫情況的基礎上利用模擬方法確定優存儲方案,其目的是為制定合理的貨物安全庫存量和訂貨量提供可靠的依據,提高企業管理人員的決策質量,從而減資金的佔用和缺貨損失,提高企業的經濟效益。通過研製庫存管理信息系統使庫存信息管理自動化,也就是實現貨物入出庫管理計算機管理、自動查詢貨物入出庫情況並在缺貨時給予提示、使用計算機貨物余額定期結算、貨物余額實時查詢並顯示是否需要訂貨、裝配出庫管理使得只要輸入需要裝配產品代號和量,組它的所有零件就會自動檢庫和出庫。然後對安全庫存量和訂貨量進行模擬,模擬方法是首先自動統計貨物在過去某一段時間內的需求量,計算出概率,用隨機的范圍表示其概率值的大,利用隨機產生隨機、從而間接的產生隨機需求量,給定模擬天和其他模擬條件模擬各種方案,從眾多的存儲方案中找出優存儲方案。
  13. This thesis suggests a process considered minimizes the population size as similar individuals occur in the fitter members of the population, which helps reduce the execution times for ga by removing the redundancy associated with the saturation effect found in the later generation. this thesis uses a method that adds dynamic penalty terms to the fitness function according to the optimal degree of solutions, so as to create a gradient toward a feasible suboptimal or even optimal solutions. on the basis of the difference of the biggest and the smallest of fitness of individual, modifying the fitness function in order to convergence is a satisfaction

    動態調節種群大,去掉遺傳演算法在迭代後期搜索產生的過多相似個體,達到減少計算時間的目的;按照解的優劣程度給適應度增加一個在ga搜索過程中動態改變的可變罰,給搜索優解創造一個梯度,使遺傳演算法收斂到可行的較優解或優解;根據適應度值大和個體的差修正適應度,使適應度值適中不容易造收斂太快、局部收斂或根不收斂而變隨機搜索;為了避免「近親繁殖」採用競爭擇優的交叉操作;利用并行遺傳演算法的思想,提出一種自適應多子種群進化策略;提出人口汰新政策來解決類似甚至相同的個體的情況發生。
  14. Under linear demand and cost functions, we have reached the following main conclusions : ( 1 ) the capitalist selects his optimal location at the market with the smaller demand under the two pricing policies ; ( 2 ) total output under mill pricing is higher than that under uniform pricing ; ( 3 ) the dealer will prefer mill pricing, whereas the preference of the capitalist is indeterminate ; ( 4 ) the welfare level under mill pricing is definitely higher than that under uniform pricing ; ( 5 ) under uniform pricing, the optimal number affirms declines with an increase in the royalty ratio paid to the capitalist

    在線性需求與的假設下,文得到的結論是: ( 1 )在此二訂價制度下,資家均會將購物中心設立於需求較之市場而有角隅解,但在運費外加的情況下,則可能得到中間解; ( 2 )單一出廠訂價之產量高於單一運送訂價之產量; ( 3 )廠商偏好採用單一出廠訂價,但資家之偏好則未定; ( 4 )單一出廠訂價之社會福利必定高於單一運送訂價之社會福利; ( 5 )單一運送價格制度下適廠商家之多寡隨支付給資家權利金之比率增加而減少。
  15. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以橋狀態作為施工控制的終目標,以實施佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為橋狀態法;以斜拉橋主梁標高誤差為目標,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了文方法的正確性及其工程實際價值
  16. Secondly, on the premise of the principle of minimum cost and serving object and planning aim of logistics distribution network in a city, the paper analyses systemicly all the factors on total cost, establishes arithemetic model, calculates with ristricted function method, then gets the initial distribution network. thirdly, the aticle evaluates and revises the results calculated from the foregoing madel with delphi method and secondary comparative model, thus gets ulteriorly optimized distribution network. at last, the importance of constructing logistics information platform is put forward, at the same time the flatform ' s requirment, function formation and running mechanism are analysed synthetically

    文首先分析了我國與國外物流發展的差距與異同,並根據我國物流業發展的客觀環境,提出了市域物流配送網路規劃的概念以及開展此項工作的重要性和迫切性;其次在原則和明確市域物流配送網路服務對象與規劃目標的前提下,對影響總的各項因素進行系統分析,從而建立基於學模型,並採用制約法對所建模型進行求解,得到初的配送網路;再次由德爾菲法和二次比選模型對模型求解結果分別進行初次和二次評估修正,從而得到進一步優化的配送網路;後提出建設市域物流信息平臺的重要性,並對其需求、功能組及運行機制進行了綜合分析。
  17. In order to assure that the stress and strain state of structure is secure, the author analyses respectively the objective functions of the reasonable finished state and buckle - cable adjusted phase ; thus, the optimized model based on fga is framed. finally according to the example, the computation datum are compared with the iterative forward analysis method and the optimal control theory. the result shows that this method can be used conveniently and meet the construction and design precision

    為了滿足大跨度鋼管混凝土拱橋施工的安全性與橋預期的內力狀態和拱肋線形,文結合工程實例,分別對合理橋狀態和扣索索長調整的目標的確定進行了分析,將一組多變量、多約束的化問題無約束化,從而建立起適合於該問題的遺傳演算法優化模型,將其計算結果分別與迭代前進法和隨機優控制理論進行了比較;結果表明,採用該方法編制的基於結構計算的遺傳優化程序操作靈活,能很好的滿足施工和設計要求。
  18. Firstly, the distortion of rolled piece and the designing method in the beforehand slit pass and slit pass has been analyzed. secondly, based on the research production of predecessor and research of the author, card system selected some corresponding experience formulas such as roll force, roll moment, roll temperature and roll consume, and established spread model in the beforehand slit pass and slit pass and the distribution model of elongation coefficient. subsequently, card system applied the dynamic programming method with minimum roll consume and optimized its pass system

    文以圓鋼雙線切分為基實體模型,著重分析了預切分孔型和切分孔型在軋制過程中的變形特點及相應的孔型設計方法;基於前人的研究果及作者的探索,選擇了相應的軋制力、軋制力矩、溫度及能耗模型,建立了預切分和切分的寬展及延伸系的分配模型;應用動態規劃法以能耗為目標對孔型系統進行了優化設計;利用visualbasic6 . 0和microsoftaccess據庫的連接,建立了據查詢系統,以visualbasic6 . 0和autocad之間的介面在vb環境下完了斷面孔型圖的繪制。
  19. In this thesis, we make an assessment and prediction of the performance of the structure with reference to the two theories of time - variably reliability and condition states and achieve favorable results, in the meanwhile, we established the relationship between condition states and maintenance cost, to optimize bridge life circle maintenance and set up objective optimization function and bridge maintenance safety provisions so as to meet the requirement of a reliable life circle structure and guarantee the least cost of maintenance for the bridge structure in its life circle

    文章利用時變可靠度的理論和條件等級思想的兩種理論對結構的性能進行評估和預測,並且收到較好的效果。同時,確定了結構條件等級同維護之間的關系。將橋梁壽命周期維護進行優化決策,根據目標優化和橋梁維護安排準則:滿足壽命周期內結構可靠性的要求,同時保證橋梁結構在其壽命周期內其維護
  20. And we can prove under some mild conditions, the optimal solution that minimizing the cost function is uniquely exists and finite

    在一些適當且合理的假設條件下,我們將證明出能使相關佳解是存在且唯一的。
分享友人