最小沖量技術 的英文怎麼說

中文拼音 [zuìxiǎochōngliángshù]
最小沖量技術 英文
minimum impulse
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 名詞(技能; 本領) skill; ability; trick; technique
  • : 術名詞1. (技藝; 技術; 學術) art; skill; technique 2. (方法; 策略) method; tactics 3. (姓氏) a surname
  1. Conclusions as following have got through test study : ( 1 ) when impact compaction technology is applied to treat collapsible loess subgrade, the effect depth may be treated generally can not override 80 cm and impact compaction pass is optimum at 30 times. ( 2 ) for stratified impact compaction of subgrade, when compactness of each level reaches codeslstandards loose laying depth of 80 cm fits 40 impact compaction pass is the optimum combination of subgrade construction. when average compactness in each level reaches codeslstandards loose laying depth of 80 cm fits 30 impact compaction pass is the optimum combination o ( 3 ) the quality control method may request impact compaction pass as the main control index and at the same time the final division settlement is less than 10 % of total settlement as large area subgrade is constructed

    通過試驗研究主要得出如下認識:擊壓實處理濕陷性黃土地基時,其有效處理深度一般不超過80cm ,壓遍數以30遍左右為宜;對路基分層壓,在要求土體中各點壓實度均達到規范要求時,路基佳組合為虛鋪厚度80cm 、壓40遍;在只要求土體平均壓實度達到規范要求時,路基佳組合為虛鋪厚度80cm 、壓30遍;大面積施工時,質控制方法可按照在以壓遍數作為主要控制指標的同時,要求後10遍分計沉降於累計沉降10 ;在施工單位自己購置擊壓實機情況下,與傳統施工相比較,擊壓實是一種既能節約資金又能大縮短工期的施工方法。
分享友人