有坑洞的 的英文怎麼說

中文拼音 [yǒukēngdòngde]
有坑洞的 英文
cratered
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : 4次方是 The fourth power of 2 is direction
  • 坑洞 : pot hole
  1. Whereas the rocks in the ancient heavily cratered terrains were basaltic, the younger rocks of the northern lowlands resembled a more highly evolved type of lava called andesite : they contained more glass, more silica - rich minerals and fewer iron - bearing minerals

    古老、充滿地區,巖石屬于玄武巖,但北方低地較年輕巖石卻類似一種更高度演化、稱為安山巖熔巖:它們含較多玻璃質、較多富矽礦物、以及較少含鐵礦物。
  2. Despite its flimsiness, tempel 1 has an almost planetlike surface, covered with what appear to be impact craters ( the first ever observed on a comet ), cliffs, and distinct layers

    除了結構鬆散之外,譚普一號著近乎行星般表面,其上滿布著像是沖撞后所留下(這在彗星上是首次被觀察到) 、斷崖和多層次結構。
  3. Evidence that the above - imaged plates really are dust - covered water - ice includes a similarity in appearance to ice blocks off earth ' s antarctica, nearby surface fractures from which underground water could have flowed, and the shallow depth of the craters indicating that something is filling them in

    支持如上面影像扁盤確是被沙塵所掩水冰證據:它著與地球南極冰塊相似特徵、附近地表凹凸不平部分曾經被地下水淹沒痕跡、影像中淺底隕石也許表示某種東西填滿了
  4. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度加大,邊坡、大壩、橋梁、隧、深基以及建築結構物抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新和更高要求:如要求進一步調用巖土體自身強度,錨桿應具足夠耐久性,錨桿使用應不影響周邊地層開發等。
  5. Desert puddles and mud holes : water is a preciously scarce resource for all living things in the desert

    沙漠里和泥濘,對于在沙漠里所生物,水是很珍貴和稀小資源。
  6. Article 41 enterprises and institutions shall be forbidden to discharge or dump waste water containing toxic pollutants or pathogens or other wastes into seepage wells or pits, crevices or karat caves

    第四十一條禁止企業事業單位利用滲井、滲、裂隙和溶排放、傾倒含毒污染物廢水、含病原體污水和其他廢棄物。
  7. Whether there is any chance for the carcasses of pigs which died of foot - and - mouth disease to spread the disease if they are not properly treated before being buried in the pits dug by pig farmers in their farms ; and

    (二)把患口蹄病豬屍未經處理埋葬在由豬農在農場挖掘,是否機會將病菌傳播;及
  8. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    限元法模擬分析涵開挖時,採用分層、分步模擬開挖過程方法,即將計算域內單元分層「挖去」 ,使開挖表面成為無應力表面方法,分析土體在卸載狀態時應力場和位移場隨開挖深度變化規律;在體施工后,回填土體時,據開挖完成時應力場、位移場,通過逐級增加計算域內單元數目,施加每級新增加單元自重荷載,利用限元法模擬基及上覆土體分層填築施工過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形一般規律,而且這種將地基? ?涵? ?土體作為一個統一整體進行模擬方法,量化了三者之間相互作用關系。
  9. Its catchment area covers 15 square kilometers, and it flows northward from lin tong mei through hang tau tai po and kwu tung to join the river indus at ho sheung heung

    雙魚河集水區15平方公里,源頭位於蓮塘尾,向北流經頭大布和古,于河上鄉處匯接梧桐河。
  10. The right part is higher than the left of the green. a bunker sits in front of the green and a grass pit backs to green

    一個果嶺右邊高、左邊低三桿,擊球至少要190碼距離,不夠會落入前方,太長則會跑到後方長草區。
  11. Using the finite element method ( fem ), the simulation and analysis on this construction process were carried on, and the different stress state of soil at different construction period was rendered. and the influence of different stress paths ( foundation excavation - unloading & excavation filling - reloading ) on the stress and the displacement was also reflected and researched. the law of non - linear constitutes of soil was presented in the simulation and analysis

    模擬分析再現了土體非線性本構關系,得到了基開挖時土體變形和應力變化一般規律;在基及上覆土體回填時,通過分層填築限元模擬和地基、涵、土體三者相互作用限元分析,得到施工結束太原理工大學碩士學位論文時位移場和應力場,同時求得涵結構內力。
  12. They can be found at field, under the ground, in mountain stream and the mountain pits

    它們藏於田裡、埋于土中、拾于溪里、產于里。
  13. Also, beware the famous spectacles, the 14th signature hole, with two large and deep bunkers in the face of a ridge guarding the green about 80 yards from the flag. the tee shot must be long and perfectly placed to have any chance of carrying the spectacles with the second shot

    此外,尤其要注意第十四在離口旗桿80碼處山脊上兩個又大又深守衛著這一片果嶺,擊球必須長且準,球手才機會在二次擊球時使球滾向口。
  14. Watch your step. there ' s a hole in the sidewalk

    小心您腳步。人行道上
  15. Ben, in his long, lonely wanderings about the island, had found the skeleton - it was he that had rifled it ; he had found the treasure ; he had dug it up it was the haft of his pickaxe that lay broken in the excavation ; he had carried it on his back, in many weary journeys, from the foot of the tall pine to a cave he had on the two - pointed hill at the north - east angle of the island, and there it had lain stored in safety since two months before the arrival of the hispaniola

    長期孤身流浪在海島上本葛恩發現了那副骨架,並把它身邊東西搜掠一空。發現寶藏也是他,他把金銀財寶都掘了出來裡留下鎬頭斷柄就是他,把財寶扛著從大松樹下搬到海島東北角雙峰山上一個穴里。不知返了多少越,終于在伊斯班裊拉號抵達前兩個月把所寶藏都安全運到那裡。
  16. We arrived there in a wink. on the brilliant moon, there was a huge pit and we played sand castles inside

    亮亮月球上一個大,我們就在里玩泥土堆城堡。
  17. The whole procedure of construction, including foundation - pit excavation, the body construction and foundation - pit filling, was simulated and analyzed by using elastic - plastic fem procedure programmed by myself. and the laws of stress field and displacement field were obtained

    本文通過研編彈塑性限元程序,模擬並分析了涵施工全過程(包括:基開挖、涵主體施工、基及上覆土體回填)中計算域土體變形和應力變化規律。
  18. Ensure that the side of the excavation pit is properly shored before you go down to do work

    進入里工作前,先確定墻壁是否支柱牢固地支撐著。
  19. This house at kpalime was once in ill repair and the weeds around it grew densely from a lack of proper attention. some of the trees around it were scorched and the road in front of the house was bumpy. the local fellow initiates thus decided to show their " human magical power ", and transformed the dilapidated structure into a prosperous looking place

    當初在巴利美找到這間房子時,因前任使用者未妥善管理,到處雜草叢生一片荒蕪,些樹木甚至已被燒焦了,屋前道路也是,同修們於是施展人為神通化腐朽為神奇。
  20. In my endeavour to escape, i pulled down all the creeping plants hanging down from above, and the weeds and plants growing on the walls of the pit also met the same fate. still, i failed to get out of the pit

    焦急中,所從上面垂下來蔓藤都被我扯下來了,壁上大大小小雜草叢也被我抓光了,我還是無法逃出
分享友人