有拱的通道 的英文怎麼說

中文拼音 [yǒugǒngdetōngdào]
有拱的通道 英文
arcade
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 4次方是 The fourth power of 2 is direction
  • : 通量詞(用於動作)
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 通道 : thoroughfare; passageway; pass; enterclose; gallery; drong; tunnel; avenue; alure; way; row; key ...
  1. A roofed passageway or lane, especially one with shops on either side

    屋頂或小巷,尤指兩邊商店時
  2. The porous ceramics is composed of lots of bridge arch - shaped microspores that connected and well - distributed inside the material. when the fluid passes through these pores, the suspended matters, colloid particles and big molecular organic substances are withheld or absorbed to the inner surface of the pore, and result in filtration, purification adn even - dispersion, high strength, good resistance to abrasion, high temperature and corrosion, no pollution, long workinglife, and easy to regenerate, the porous ceramics are available for filtration and fluidization of variou gas and liquid

    微孔陶瓷過濾介質由許多大小分佈均勻,相互連狀開口氣孔組成.當流體從這些氣孔中過時,流體中懸浮物質,膠體顆粒,大分子機物等被截留,吸附在微孔內,從而達到了凈化和過濾均勻化效果.微孔陶瓷強度高,耐磨損,耐高溫,耐腐蝕,無污染,氣孔分佈均勻,使用壽命長且再生簡便,特別適用於各種氣,液過濾和流態化過程
  3. In this paper the different middle wall ' s mechanical behavior on different rock mass has been simulated by establishing the three - dimensional finite - element model of the shallow double - linked - arch tunnel, and the basic loading law of the middle wall is obtained, then the proper form of middle wall under different rock mass during constructing the shallow double - linked - arch tunnel is given, which offers foundation for the design of middle wall in double - linked - arch tunnel

    過建立雙連三維限元模型,模擬了不同圍巖級別條件下淺埋雙連不同中墻形式力學行為,得出了中墻基本受力規律,提出了不同圍巖級別條件下修建淺埋雙連所採用合理中墻形式,為雙連中墻設計提供依據。
  4. Thus, two 2d elastic finite - element models of tunnel are respectively established, both of which go through i wall - rock sector and wall - rock sector by means of large - scale finite element software ansys. thereby, the magnitude of wall stress, displacement, submergence of arch roof and terrestrial sedimentation in tunnels will be attained via numerical simulation of the whole construction process

    過運用大型限元軟體ansys ,分別建立隧穿越類圍巖地段和類圍巖地段兩個二維彈塑性限元模型,進行施工全過程數值模擬,得到隧中墻應力和位移以及頂下沉和地表沉降值。
  5. When there is original stage support only, the load ratio of surrounding rock gets more and more bigger with the increasing of crust stress, correspondingly, the load ratio of initial stage support gets smaller. when the initial stage support and the second support act each other, the load ratio of surrounding rock is more than fifty percent, and it has little change with the increasing of crust stress. the whole analysis of the surrounding rock and support shows that the bottom arch of liner and the feet of liner have serious stress concentration, so do the sidewalls and the foot of a wall of the surrounding rock

    過屈曲理論分析結果對比表明,彈性屈曲和突變失穩分析結果比非線性屈曲分析結果要大得多,非線性分析由於考慮了材料非線性和幾何非線性,因而結果與實際接近實際;當只初期支護時,隨著地應力增加,圍巖荷載分擔率增大,相應地,初期支護荷載分擔率就減小了;當初期支護和二次襯砌共同作用時,圍巖荷載分擔率在50以上,這一分擔率隨地應力增加其變化不大;支護和巖體整體分析表明,襯砌底腳處應力集中嚴重,隧巖體側墻及墻角圍巖應力集中也較大。
分享友人