有效板寬 的英文怎麼說

中文拼音 [yǒuxiàobǎnkuān]
有效板寬 英文
effective width of slab
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ名詞(效果; 功用) effect; efficiency; result Ⅱ動詞1 (仿效) imitate; follow the example of 2 ...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 有效 : effective; valid; efficacious
  1. For hoods with shutters in four sides, the results show : 1 ) the hoods positively placed boards are called hoods used for venting airflow ; hoods negatively placed boards are called hoods used for leading airflow ; 2 ) among the hoods used for venting airflow, the most effective hoods should have positive declining angle value of 30, the ratio 4 of areas between the four windward faces and the gular section ( fy / fj = 4 ), the value of b range from 70 mm to 120 mm and the value of b / h range from 0. 5 to 0. 6 ; 3 ) the most effective hoods should have negative declining angle value of 60, the ratio 4 of areas between the four windward faces and the gular section ( fy / fj = 4 ), the value of b range from 100 mm to 170 mm ( the optimum value is 120 mm ) and the value of b / h range from 1. 4 to 2. 2 ( the optimum value is 2. 0 )

    對於四面設百葉型風帽,計算表明: l )正裝傾斜擋的百葉型風帽可認為是排風型風帽,倒裝擋傾斜的百葉型風帽可認為是進風型風帽; 2 )排風型風帽中,擋正裝30 」 、風帽四個迎風面的面積fy和風管凈斷面積fj的比值( fy腸)為4 、擋度b在70inln到120inln之間、間距比值隴在0 . 5到0 . 6的百葉型風帽排風果最好; 3 )進風型風帽中,擋倒裝裝60 「 、風帽四個迎風面的面積和風管凈斷面積的比值( fy例)為4 、擋度b在100咖到170mm之間( 120mm為最佳) 、間距比值隴在1 . 4到2 . 0的進風型風帽( b爪= 2 . 0為最佳)的百葉型風帽進果最好。
  2. On the basis of this, the paper makes a great deal of calculation and analysis in this part, different parameters " effect and stress gradient are included. local buckling coefficient and the efficient width calculated formula are provided and look forward to take a reference to the redaction of the specification

    本文對此內容進行了較為深入的研究,考慮了多個參數的影響,對各種應力比作用下的楔形腹的屈曲及屈曲后強度進行了計算分析,得出了考慮翼緣相關作用的楔形腹屈曲系數及度系數的計算公式,以期為規范的修訂提供參考。
  3. The single phase electric motor, which is suitable for wide range of voltage, permits the efficiently cutting of slender fur strips, thicker skins and skins wide in width. the using conditions can be madebetter when the machine is used in the area of unstable voltage

    :配用單相大功率電機,對于細毛條較厚皮和大幅麵皮張都可以切割適用電壓范圍:對于電壓不穩定地區,可以改善使用條件
  4. Through the simulation of the forming process, we can get the deformations, stress, strain, plastic flowing in sheets and the interface state under impact load and rolling load, the deformation of the sawtooth form and comparing to the initial state, the results above are expressed in computer animated way. and the effect of geometrical ( mainly different form, including 90 degree, isoceles triangle , 75 degree, and 1. 5 high and wide ), material and technical parameters on the bond strength are analyzed, also including the comparison of different sawtooth form. the optimum parameters are got

    對雙金屬復合成型過程進行模擬,從而得到在沖擊載荷和軋輥壓力作用下基和覆的應力、應變分佈和塑性流動變形規律,復合后的齒形的變形情況與初始齒形形成對比,以動畫的方式模擬成型過程,並分析了不同幾何參數(主要是不同的齒型,其中包括直角齒型、等腰齒型、 75度齒型、 1 . 5高齒型) 、材料參數、工藝參數對復合強度的影響,以及不同齒型的變形對比以及齒型對復合情況的影響,提出最優齒型、最優工藝參數,地指導了實驗。
  5. The reduction factors derived from curve fitting based on calculation results by the finite element program ( ansys ) considering all kinds of damages such as cutouts, corrosion, cracks, denting, initial deflection and residual stress are introduced to modify the effective width of perfect panel in the present paper

    本文考慮中可能存在孔洞、腐蝕、裂縫、局部撞損和初始焊接變形或殘余應力等損傷和初始缺陷,對不同的損傷形式用限元程序( ansys )進行大量的計算,通過曲線擬合的方法引入折減系數對完好格的度進行修正。
  6. In this paper, an optimization design cad system of detached foundation of transmitting electricity iron tower has been studied. the system uses an easy and efficient method named grid search to find out the minimum cost of an detached foundation. at the same time, the depth and width of foundation, the width of column, the thickness of foundation plan have been ascertained

    本論文研究開發的輸電鐵塔獨立基礎優化設計cad系統,以最小費用為目標,採用簡單、、易於編程的約束非線性規劃方法? ?網格搜索法,對輸電鐵塔獨立基礎進行優化設計,確定出基礎埋深、基柱度、底度、底厚度等合理截面尺寸,並開發出計算、出圖一體化的優化設計計算機輔助設計系統。
  7. The minimum reinforcement rate has little effect on reinforcement in columns. ( b ) when considering the bars in slab participate in beams against negative flexure, four or six times slab - thickness on each side of web can be defined as the effective flange width of slab by intermediate or rare earthquake actions

    當考慮筋對梁端負彎矩承載力的提高作用時,可在設防烈度地震和罕遇地震作用下分別取每一梁側四倍、六倍厚范圍作為度。
  8. 3. the effective width of the deck of the cable - stayed bridge is up to profound research because there is no exactly definition in the applicable design standards

    3 、由於現行的關橋梁設計規范沒對斜拉橋主梁的度做出具體規定,從而使斜拉橋在設計中橋面度取值問題待于進一步研究。
  9. The effect of gas rates, liquid flow - rates, downcomer width, weir height and the addition of surface active agent on the liquid mean residence time, t, effective diffusion coefficient, de, and froth height, hf were studied. results obtained showed that for two systems, the t in the downcomer of ctst plate is 20 - 50 % smaller than that of fl valve plate, and the de is 40 - 70 % smaller than that of fl valve plate

    通過對氣速、液體流量、降液管度、堰高和表面活性劑加入的影響進行分析得出下面結論:在相同的操作條件下,對于兩種物系, ctst塔降液管的液體停留時間比f1浮閥塔的約小20 50 ,擴散系數比f1浮閥塔的小40 70 ,泡沫高度低110 150mm 。
  10. 3. the effective width of damaged attached plates adopt the effective width of damaged plates in ultimate strength computation of damaged stiffened panels

    在受損加筋極限強度計算中,對損傷的帶度取受損格的度進行計算。
  11. The modified perry - robertson equation is applied to calculate ultimate compressive strength of damaged stiffened panels founded on so - called beam - column method, and the width of effective plate adopts above reduced effective width of a damaged plate

    在進行受損加筋格極限強度計算時,按樑柱法採用修正的perry - robertson方程進行計算,其中度取格折減后的度。
  12. The paper, in the way of math morphology, manages to classify the linear elements, the same type but different width in the scanning, and result in the two - valued linear image in the same level. in the fine division of the target image, a way of math morphology based on the double structure of cell stencil is put forward, which prevents the terminals and the acnodes from losing and also reduces effectively time in doing so. as the result of the framework of the fine division, vector method is formed in which its track is monitored by using dynamic change of pace about freeman ' s chain code

    本文用數學形態學相關理論方法實現了對掃描圖像中具同一線型但不同線的線狀要素進行分類,在同一層上得到同一線的二值線狀要素圖;在對此目標圖像進行細化時,提出了基於雙結構單元模的數學形態學細化演算法,用該演算法對實際的線狀要素進行細化,避免了端點、孤立點等信息的丟失,且由於是并行處理,地提高細化速度;對于細化后的骨架線,提出了基於freeman鏈碼的動態改變步長保持精度跟蹤矢量化方法。
  13. Effective distribution width concerning cantilever plate with linearly varying depth

    關于變厚度懸臂分佈
  14. Working area of the platen

    面積長
  15. For shutters, the results show : 1 ) according to the formula p =, the theoretical value of is calculated by the effective velocity of the flow, and its engineering value is calculated by the arriving velocity of the flow, the relationship between the theoretical value of and its engineering value is 2 ) the smaller value of declining angle will result in the smaller pressure loss and smaller outlet velocities. as a result, the declining angle of 30 擄 or less is recommended in some places which need small wind velocity, such as broadcasting studio and library, and the declining angle of 45 擄 or less is recommended in places which need big wind velocity, such as cinema and office ; 3 ) the larger value of ratio between the wide of the shutter b and the space between two boards h ( b / h ) will result in the larger pressure loss and smaller outlet velocities. the range of b / h from 0. 8 to 2. 0 and the optimum value 1. 2 is recommended ; 4 ) the range of b from 10 mm to 50 nun and the optimum value 40 mm is recommended ; 5 ) the proper thickness of the boards 8 of the shutters is 1. 5 mm ; 6 ) cuneiform boards should replace the rectangle inlet boards of the shutters in order to obtain better ventilation

    數值模擬採用fluent軟體,計算結果用excel進行處理,通過對大量數值工況進行數值模擬計算,結果表明:對于單側百葉風口,計算表明: 1 )對于公式p = ( ~ 2 ) 2 ,的理論計算值中定義為流體流經百葉風口內部時的速度,即速度,而工程上常使用流體的來流速度來計算,計算表明,的理論計算值與工程應用值的關系為( _ (理論) ) ( _ (工程) ) = 0 . 813 ; 2 )當來流速度一定時,擋傾斜角度越小,壓力損失越小、出口速度越小;因此在要求進口風速比較小的場所,如播音室、圖書館等,宜採用擋角度30的百葉風口;在要求進口風速比較大的場所,如電影院、辦公室等,百葉擋的角度應選45 ; 3 )當來流速度一定時,百葉擋的擋度b與擋間距h的比值b h越大,壓力損失越大,出口速度越小,計算表明,鑒于壓力損失、出口風速、間形成渦流區的大小,百葉擋的b h值取0 . 8到2 . 0之間, b h = 1 . 2為最佳值; 4 )當來流速度一定時,在計算的條件下,當百葉擋度b = 40mm時,百葉擋的阻力系數最小,考慮到渦流區等的影響,建議選用10mm b 50mm的百葉擋;西安建築科技大學碩士學位論文5 )百葉擋的厚度取為1 . sinln為好; 6 )百葉擋的入口側可選用具傾斜度的楔形擋來代替矩形擋,利用其較好的導流作用,可得到更好的出流果。
  16. A deep beam model with spring bearing is given, based on the analysis of middle frame of frame and shear wall structure ground floor, which is sensitivity to floor rigidity. comparing rigid assumption to elastic assumption, shear error of frame is worked out, which is index of floor rigidity. conclusions are drawn that floor rigidity is independent of earthquake intensity and the most effect factor to floor rigidity is floor length to width ratio

    以樓按剛、彈性計算的框架柱的剪力誤差值作為衡量樓剛性的指標,通過對模型進行理論分析證明以往一些只能通過歸納總結得出而沒理論支持的結論:樓的剛性同地震烈度無關;通過對影響樓剛性的各個因素進行分析比較,得出樓的長比是影響樓剛性的主要因素,而增加樓的厚度並不是增加樓剛性的途徑。
  17. This article analyzes the difference of theories calculating the effective width between chinese code and north american codes. the author finds the results based on the technical code for design of cold - formed thin - wall steel structure is lower than that of north american codes, especially for flat plate with relatively larger width - thickness ratio whose thickness is thinner than 2mm, the difference is more obvious

    本文分析了國內外關于冷彎型鋼屈曲后強度的度計算理論,通過理論分析和計算對比發現,按我國《冷彎薄壁型鋼結構技術規范》計算的厚比值較北美規范低,特別是對于厚度小於2mm的大厚比件,其差異更明顯。
  18. Allowed the local buckling of elements and made use of the post - buckling strength, the effective width method is often used to calculate the load - carrying capacity

    為了用料經濟,允許件產生局部失穩,其承載能力以利用的屈曲后強度為特點的"度"方法來計算。
  19. Referring to three kinds of plan irregularity, structures individually with four kinds of irregularity as eccentricity in one direction, eccentricities in two directions, re - entrant corner irregularity and diaphragm discontinuity have been analyzed to investigate the relationship between torsion effects and parameters of above irregular structures. the parameters and the schemes for determining the scope of structures with different kind of irregularity considering seismic action in two directions simultaneously are proposed, some conclusions have been get as following : it is indicated by the analysis results that torsion effect has no dependency relation with eccentric torsional angel adopted in code for seismic design for buildings. it is suggested that the eccentric torsional angel should not be take as the parameter of torsion effect of structures considering seismic action in two directions simultaneously ; for the structures with regular plan and elevation and with eccentricity in one direction due to irregular mass layout, the relative eccentricity can be take as the parameter of torsion effect of structures considering seismic action in two directions simultaneously ; for the structures with regular plan and elevation and with eccentricities in two directions due to irregular mass layout, the ratio of relative eccentricities in two directions and the angel of them can be take as the parameters of torsion effect of structures considering seismic action in two directions simultaneously ; it is indicated by the analysis results that the torsion effect has no dependency relation with re - entrant corner ratio adopted in code for seismic design for buildings as

    所取得的主要結論:結構的扭轉應與《抗震規范》所採用的扭轉不規則指標即偏心扭轉角之間的相關性較差,偏心扭轉角不宜作為判斷結構是否計及扭轉應及需考慮雙向水平地震作用的界定指標;對于樓層間均勻偏心的多層單向偏心結構,建議採用相對偏心距作為需考慮雙向水平地震作用的界定指標,並給出針對不同平面尺寸的界限相對偏心距;對于樓層間均勻偏心的多層雙向偏心結構,建議採用兩個主軸方向的相對偏心距及其夾角作為界定指標,結合單向偏心結構的界定方案進行需考慮雙向水平地震作用的結構范圍界定;凸凹不規則結構的扭轉應與凸凹比例無正相關關系, 《抗震規范》要求所平面布置不對稱的凸凹不規則結構計及扭轉應的規定欠妥當,建議凸凹不規則界限值從30改為15 ,只要求分析採用空間模型比較合適; 《抗震規范》關于度較小的結構需計及扭轉應的規定很必要,樓局部不連續的結構需採用符合樓實際剛度的計算模型予以分析,可使用相對偏心距(及其夾角)參照單向(和雙向)偏心結構的界定方案,界定樓局部不連續結構是否需要計入雙向水平地震作用下的扭轉應。
  20. Pcb manufacturer cooperating with our company has founded the factory for nearly 20 years, since our company becomes and keeps good cooperation with our company immediately, this factory possesses more than 20 layers of many plywood, multistage laser and buries the hole board production capacity blindly, very in enormous quantities processing line wide line from 3 mil 0. 075mm, high - accuracy pcb board of aperture 4 mil 0. 10mm, produce, can reach more than plywood more than 50000 square meters per month. our company many person responsible for, coordinate pcb engineers and technicians to produce matters engaged in pcb production management for many years, can deal with various project problems in pcb production process easily, strictly control the order assigning, finished pcb board of the craft to confirm and close, avoid customer s unnecessary cost input and loss effectively

    與我司合作之pcb生產廠家建廠已近20年,自我司成立即與我司保持良好合作關系,該廠具備二十層以上多層多級激光盲埋孔生產能力,可大批量加工線線距3mil 0 . 075mm ,孔徑4mil 0 . 10mm的高精密pcb,產能達每月多層50000平米以上。我司多名負責協調pcb生產事宜的工程技術人員都曾從事pcb生產管理多年,可輕松處理pcb生產過程中各種工程問題,並嚴把工藝指令下達成品pcb驗收關,避免客戶不必要的成本投入和損失。
分享友人