有機負荷量 的英文怎麼說

中文拼音 [yǒuliáng]
有機負荷量 英文
organic load
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : machineengine
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 有機 : organic organic
  • 負荷量 : load capacity; capacity; payload負荷量調節器 load proportioner
  • 負荷 : [電學] load; charge; weight
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    電力預測是供電部門的重要工作之一,準確的預測,可以經濟合理地安排電網內部發電的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備容,合理安排組檢修計劃,保證社會的正常生產和生活,效地降低發電成本,提高經濟效益和社會效益。
  2. Suction gas pressure goes up as the compressor run at the lower speed in the lower burthen, and this is beneficial to lower systems energy - consume. when the system is controlled by wvf, the discharge change of the evaporator is not linear ; the electronic expansion valve is adopted to regulate the system superheat degree, and the controlled object is parameter time varying, accordingly, the time varying controller should be adopted

    較小時,壓縮採用低速運轉,吸氣壓力升高,這對系統降低能耗是利的;變頻控制時,蒸發器製冷劑流的變化並非線性;系統中採用電子膨脹閥進行過熱度控制,被控對象具參數時變的特性,相應地宜採用變結構的控制器。
  3. With the speed - raising of railway and the marketing of the management, the load that the electric locomotive burdens increased annually. in order to guarantee the security of the locomotive, the overhaul must be transited from preventive maintenance to state maintenance, which can accelerate the speed and the quality of the locomotive overhaul and reduce the overhaul cost. the most important achievement is that the overhaul can be performed automatically and digitally and can be effectively competent for the record management of the overhaul data

    隨著鐵路提速和運營生產的市場化,車運行逐年增加,為了效保證車的運行安全,車檢修必須從定期維修向狀態維修轉變,以提高車檢修的速度和質,降低車檢修成本,更重要實現檢修自動化、數字化,完成對車檢修數據進行效的記錄管理,建立車關鍵設備的狀態參數數據庫,從而實現對車狀態效控制。
  4. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,抽水蓄能電站的容效益與電網的水平、曲線形狀和常規水電的比重關,而節煤效益除與水平、曲線形狀關外,還與電網的電源結構、火電組的動力特性關。
  5. Windows 2000 patch : connections to all hosts are terminated when nlb load weight is adjusted

    Windows 2000修補程序:調整nlb時與所的連接都被終止
  6. Download details : windows 2000 patch : connections to all hosts are terminated when nlb load weight is adjusted

    下載詳細信息: windows 2000修補程序:調整nlb時與所的連接都被終止
  7. With the recently demonstrated effectiveness of eccentric loading and of repetitive low - energy shock wave therapy in patients with midsubstance achilles tendinopathy, the aim of the present randomized, controlled trial was to verify the effectiveness of both procedures exclusively in patients with insertional achilles tendinopathy

    最近研究表明偏心和重復低能沖擊波療法對跟腱中部病變的病人效,本隨對照研究的目的是為了證實這兩種手段對跟腱附著點病變病人的療效。
  8. As a result, at all these connection points, the two coaxial cables are connected to different transmission equipment, sharing the traffic load from the tandem switch to a given end exchange, with half of the respective trunk circuits put into use, ensuring network safety. for such connectivity, see figure 4

    因此,在所的同軸電纜連接處,都採用兩條同軸電纜接到不同的傳輸設備的方法,將匯接交換到某一端局的話務在這兩條同軸連接上進行分擔,中繼電路各開一半,從而保證網路的安全性。
  9. The pt secondary loop voltage drop is a changing amount and has the characteristics of indirection and certain randomness. the second, according to the cause of pt secondary loop voltage drop, the different methods to reduce the pt secondary loop voltage drop were analyzed and the conclusions are draw as below : 1. changing bigger section wire and maintaining the connector plugs regularly can reduce the pt secondary loop voltage drop effectively, but ca n ' t guarantee which meets the relevant rules

    首先,通過對電壓互感器二次壓降的形成理進行分析,得出以下關於二次壓降的相關結論: 1 、電壓互感器二次壓降等於二次迴路阻抗和迴路電流的乘積; 2 、電壓互感器二次迴路阻抗分為元器件自身阻抗和接觸阻抗兩部分,且接觸阻抗佔主要部分,從而使得電壓互感器二次迴路阻抗具動態特性,而且具一定的隨性; 3 、電壓互感器二次迴路電流與二次和迴路阻抗大小相關,因而二次迴路電流也是變化的; 4 、電壓互感器二次壓降是一個變化,且具單向性和一定的隨性。
  10. Section iii proposes a possible organization of a reactive power market, a regional reactive power market established according to the distribution of the load and the reactive supply. the regional reactive power market is composed of a reactive energy market based on marginal pricing and a reactive capacity market based on a reactive regulating capacity payment. the cases in section iv, based on the market organization proposals and the reactive bid structure previously presented, performed on a five - bus system and the ieee 14 bus system, are used to analysis the effects of active bid, voltage control and power factor on the reactive marginal price

    本文首先回顧了電力市場發展的歷史和現狀;然後對市場中的定價方法和無功輔助服務的內容及特點進行了總結,並介紹了一些國家的無功輔助服務市場模式和交易方法;接著立足我國國情,提出了單邊開放電力市場下的無功市場框架:即根據和無功源的分佈特點建立區域無功市場,各區域無功市場又由相應的無功電市場和無功容市場組成;並提出了該無功市場模式下的組報價模型和基於報價的以系統總購電費用最小為目標的無功電價計算方法;最後用一個5節點系統和ieee14節點系統進行了實例分析,初步研究了發電功報價、系統電壓控制以及功率因數對無功電價的影響,得出了一些借鑒意義的結論。
  11. Based on the theory of branch complex power, accurate formulas are derived to determine complex loss and flow components in power elements. to overcome the deficiencies of the traditional methods which transmission cost is allocated to users only based on active power flow and the existed using portion definitions which fail to take it into account that the interaction of active and reactive power, a new definition of the using portion of a power element by a particular generator or load is addressed

    針對當前輸電費用只按功潮流進行分配,無法計及無功潮流交叉影響的缺陷和基於傳統的電路理論無法結合功無功潮流來定義元件使用份額的問題,本文又在復功率電源的支路功率分理論基礎之上,基於發電的復功率在支路上引起的功損耗分,給出了發電對元件使用份額的新定義。
  12. Despite the fact that, with over 40 million passengers passing through it each year, it is now running at almost full capacity, it is still a very easy airport to navigate

    盡管這里每年4000多萬的客流,目前幾乎是在滿運轉,但這里仍是一個非常便於通行的場。
  13. In this paper, the mechanism and practical effect of existing coordinated control schemes are analyzed in detail, the advantage and drawback of the different coordinated control methods in practice are indicated clearly. this paper describes a fact that it is difficult to obtain rapid load response and stable main parameters at the same time by using the recent methods, underlines that heat release is the vital parameter that should be carefully controlled

    本篇在吸取了目前各種協調控制系統的優點的基礎上,提出了改進后的協調控制方案,主旨為以控制鍋爐的熱釋放信號為核心,採用具內在穩定特性的控制方案,充分加快組的響應速度,在組所帶已經接近當時的極限,及時限制輸出功率的增長,達到穩定組的目的。
  14. To minimize the impact of the overhaul of power generating, transmission equipments on the safety, stability and economic operation of power gird, this paper, aiming at the overhaul demand of lots of equipments, brings forward the practical optimization method for overhaul planning which can adapt to the dynamic changes of the scale of power grid and integrate the load forecast and the balance of power load and power volume into it, therefore solve the key technical problems encountered by using computer to realize the optimization of overhaul planning

    為最大程度減少電網發、輸電設備檢修對電網安全、穩定、經濟運行的影響,針對電網大設備的檢修需求,提出了能適應電網規模動態變化,並與電網預測、電力電平衡結合的實用檢修計劃優化方法,解決了利用計算實現檢修計劃優化的關鍵技術問題。
  15. It is necessary to study the mechanism of harmonics generation, make sure the content and distribute of harmonics current in order to alleviate their harm to traction power system ' s component, equipments of protect and measure as well as other customer ' s electronics equipments

    為了從根本上抑制電力牽引諧波帶來的影響,削弱諧波對牽引供電系統主元件、保護測控裝置和其他用戶電子設備的影響,必要研究電氣化鐵道牽引諧波產生的理,確定饋線電流諧波的含與分佈狀況。
  16. The reactive power optimization compensation is to find the suitable compensation place and the best compensation capacitance by adjusting the generator bus voltages, transform taps and reactive compensation capacities in the condition of satisfying power load requirement, which can guarantee the secure and high quality power for consumers. the improved genetic algorithm is applied in this thesis according to the features of reactive power optimization of high voltage transmission bus, which are the non - linear problems with multi - variables and multi - restrictions

    電網無功優化補償是在功潮流調度給定的情況下,以節點電壓和線路輸送無功功率作為狀態變,運用優化演算法,調節發電節點電壓、變壓器可調分接頭和無功補償裝置,在滿足電力的要求下,尋求合理的無功補償點和最佳補償容,保證電網能夠安全、優質地向用戶供電。
  17. On the exhibition of northeast asian new and high technology and product 2004, the vice mayor of shenyang city wang ying introduced to the attendances that on the schedule of shenyang city revolution and opening up ten fields can offer good cooperation opportunities to the other countries and areas of domestic enterprises, the complete automobile and spare parts manufacturing is one of this fields. shenyang automobile industry has special features also has the most brands in our country, such shenyang is also the deeply degree of opening up, bmw of germen, ge of american, hino of japan

    專業人士表示,後置后驅車輛的重集中於汽車的後部,發動距驅動軸很近,因而驅動輪大,啟動加速時牽引力大,且傳動效率高,燃油經濟性好發動等主要部件後置利於車身內部布置,車廂內的面積利用率高,且易於將發動與車廂隔開,減少車廂內的振動和噪聲,乘坐舒適性良好。
  18. The paper , via building performance model of boiler - turbine unit , to online determinate curve of consumption in power plant which provides reliable thereunder for realizing load optimal distribution , in view of optimal distribution arithmetic , the improved equal incremental principle and linear programming are adopted , meanwhile , the database with online data disposal and data management is realized

    通過建立各單元組的性能模型,在線確定組的耗特性曲線,為實現最優分配提供了可靠的依據;在分配演算法上採用了等微增率原理和動態規劃方法,並對現演算法進行了改進;同時開發了具在線數據處理能力和歷史數據管理能力的數據庫。
  19. Qiandaohu lake was very famous for its clean water quality. but in recent years the water body has become seriously eutrophic especially during summer months in some areas of the lake and came to the attention of national, provincial and city environment protection agency. the main objective of this study involved the following : sampling and monitoring water from the lake ; water quality assessment and biological assessment ; ascertain the limiting factors for phytoplankton growth ; fuzzy cluster analyse of water pollution of all sampling points ; predicting total phosphorus concentration in the lake by using static models ; setting up regression models and their application ; setting up an eco - dynamic model and its simulation

    本研究根據1998 - 2000年連續監測數據,對千島湖進行了水質評價和生物評價;分析了千島湖水體富營養化的限制性因子;同時根據千島湖各個取樣點的污染狀況,對千島湖進行水環境質區劃;利用前人的經驗統計模型預測了千島湖現的磷濃度水平及治理所需要削減的污染物;並且組建了多個回歸統計模型,運用這些模型預測千島湖水體中的總磷濃度;最後根據多年水質、底質、生物等方面的監測數據以及千島湖流域的氣象和社會經濟狀況的資料組建理性的千島湖富營養化模擬模型。
  20. Taking the soft ? sensing of oxygen content in flue gas, unburned carbon content in fly ash and coal load in ball mill as examples, we emphatically analyze the current status, modeling method of their soft ? sensing and the secondary variable selection in the soft ? sensing ; and also summarize some other thermal parameter soft ? sensing techniques in our country, which is a guidance for the development of the thermal parameter soft ? sensing technique in power plant, and has some value for the optimization of thermal control systems

    以煙氣含氧、飛灰含炭、球磨為例,著重分析和總結了其測的現狀、軟測建模方法和二次變的選取,並概括了國內現的其他熱工參數軟測技術,對火電廠熱工參數軟測技術的發展具一定的指導意義,對熱工控制系統的優化具一定的參考價值。
分享友人