有限狀態誤差 的英文怎麼說

中文拼音 [yǒuxiànzhuàngtàichā]
有限狀態誤差 英文
finite-state error
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ名詞1 (形狀) form; shape 2 (情況) state; condition; situation; circumstances 3 (陳述事件或...
  • : 名詞1. (形狀; 狀態) form; condition; appearance 2. [物理學] (物質結構的狀態或階段) state 3. [語言學] (一種語法范疇) voice
  • : Ⅰ名詞(錯誤) mistake; error Ⅱ動詞1 (弄錯) mistake; misunderstand 2 (耽誤) miss 3 (使受損害...
  • : 差Ⅰ名詞1 (不相同; 不相合) difference; dissimilarity 2 (差錯) mistake 3 [數學] (差數) differ...
  • 有限 : limited; restricted; finite; a little; not much
  • 狀態 : status; state; condition; state of affairs: (病的)危險狀態 critical condition; 戰爭狀態 state o...
  • 誤差 : error
  1. These rules consist of the total fit, the mathematics and fatigue physics, and the safety in tail predictions. an analysis of the test s - n data of 16mn steel weld joints reveals that the four models are reasonable if only considering the total fit as the conventional method did. but if by the present three rules, the appropriate models should be the normal or the extreme maximum value

    根據先前提出的數據下良好假設分佈的確定方法,包括三個原則,即假設分佈形數據真實分佈形的一致性、預測的總體擬合效果、與疲勞失效機制的一致性和尾部預測的安全性,通過對線性均值s - n曲線擬合16mn鋼焊接頭s - n數據的統計分析,說明應用一般推斷方法, 4種分佈都可合理地作為數據的統計模型,綜合考慮三原則后,極大值和正分佈是可能的良好假設分佈。
  2. This paper has studied and set up a supervision and control system based on the backing item of jinzhou yangtze river bridge with main span of 500m, by analyzing the development of construction control of cable - stayed bridges in china and abroad, foreword calculation of 250 work cases of plane bar fem, adoption of advanced equipment and devices, quick analysis of gathered data research of karemen filtering method, least square and gray model gm ( 1, 1 ) into the identification of the real state and precuts and effective manage mechanism

    本文以荊州長江公路大橋主跨500米的混凝土斜拉橋施工為應用背景,通過分析目前國內外大跨度混凝土斜拉橋施工控制現,結合該橋施工實踐,運用平面桿系元計算理論對大橋250個工藝進行正裝計算,採用先進測試設備和儀器,利用計算機快速分析處理技術對現場監測系統收集的數據進行分析,系用卡爾曼濾波法、最小二乘法和灰色理論gm ( 1 , 1 )進行結構真實的識別和後期預測,通過科學高效的監控管理機制的運行和監控實踐,探索並建立了一套適合於大跨度混凝土斜拉橋的施工監測監控體系。
分享友人