未完工程 的英文怎麼說

中文拼音 [wèiwángōngchéng]
未完工程 英文
construction in progress
  • : Ⅰ副詞1 (沒) did not; have not 2 (不) not Ⅱ名詞1 (地支的第八位) the eighth of the twelve ear...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. Form that measurement environment noise, if the building return the not yet finished work, then seek the warm air, airiness and air condition hvac engineer, want them with the appearance to expect the environment noise worth

    測定環境噪音,如果建築還,則找暖氣,通風與空調hvac師,要他們以畫面的形式預期環境噪音的值。
  2. During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer

    近三年來主要從事機械行業設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計成投資額為8 . 5億元(重復計算)的設計作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實施設計作,得到主管部門和用戶較高評價
  3. The establishment of srqd system inaugurates one path to surficial rock mass quality evaluation, and the establishment of irqd system is of significant value in reducing prophase engineering cost and in ensuring engineering safety. etc

    表面rqd指標體系的建立,為巖質邊坡表面破碎度評價指出了一條來的研究道路。整體rqd指標體系的善對減少前期費用、保證安全等,均具有非常重要的意義。
  4. With management and audit theory, the paper counters the fact that the audit mechanism doesn " t completely show its proper effect in supervising and managing the party and government leaders, and exposes the necessity of having the mechanism existed and expanded. the paper points out that there are five outstanding phenomenon and the cause in processing the present audit mechanism, such as " carrying out audit before the cadres leave their position ", examine is not clear, legislation and standard formulation work is stagnant, unfix of audit plan effects the sequence of normal work.,

    運用管理原理和審計理論,針對此項審計機制在推行過中尚全發揮其在幹部管理和監督作中的應有作用這一現實,從管理角度闡述了此項審計機制存在和推行的必要性。指出和分析了此項審計機制目前在管理實踐中存在諸如「先離后審」現象大量存在,審計不清,立法和規范制定作滯后,審計計劃的不確定性影響正常的作秩序,審計主體多元化制約監督作用的發揮等五個突出問題及產生問題的原因。
  5. From the analysis of the construction and applying of our country ' s bidding system, the author approach a subject about the proper arrangement and structure of the bidding organization, and propose the way to deal with the development direction and standardization of it. using the structure of the feasible research and the tactics in our country ' s construction bidding system, analyse the standardization in our bidding program, the author point out the unstandard phenomena such as the deficiency research of the earlier stage and behaviour of forcing price down, and put out constructive suggestions. from the analysis of the system and the way used in deciding the bidding winers, also from the analysis of the new theory in bidding - evaluction, decision and concrete instances, the author point out the phenomena of the deficiency system and organization and propose suggestions about the standardization in our construction bidding system

    在對發達國家和地區招標投標制度進行綜述的基礎上,指出目前我國招標投標活動運行中存在不規范和不善的現象,同時提出研究本論文的理論意義;通過對我國建設招標投標組織的構建和應用的分析,從理論上探討了招標投標組織應有的層次結構,提出了招標投標組織的來發展趨向和規范招標組織的對策建議;利用我國建設項目投標的可行性研究及招標投標報價策略的層次結構體系,對我國建設投標的規范化進行分析,指出了目前投標前期研究不夠,報價隨意壓價等不規范現象,提出了規范投標活動的建議;通過對建設招標投標定標的運行機制及辦法的分析以及建設在評標定標方法上創新的理論與案例的分析,指出機制不善,體系不健全的現象,提出了規范我國建設招標投標定標運行體系的建議。
  6. In view of the engineering practice that retaining wall in the front edge of landslide is only deformed but not destructed completely as a result of the slide of slope, this paper presents a back calculation method of landslide shear strength index considering the residual resistance of retaining wall occurring topple, translation and shear deformation

    摘要針對滑坡的滑動僅使其前緣的擋墻發生位移或變形,但使之全破壞的實踐,系統提出了滑坡前緣的擋墻在發生傾覆、前移和剪切三種變形下,考慮擋墻變形后對滑坡的剩餘抗滑作用進行滑帶土抗剪強度指標反算的理論和方法。
  7. " in future, cad hopes to require all candidates applying for aircraft maintenance engineer s licence to have satisfactorily completed a course provided by hkar - 147 approved organisations

    展望來,民航處期望有一天可以規定所有申請航空器維修師執照的人士,都必須圓滿成香港航空要求- 147認可機構舉辦的訓練課
  8. Construction in progress and prepayments for equipment

    未完工程及預付購置設備款
  9. ( ii ) caused by the contractor m the course of complying with obligations under the provisions of his contract in respect of the rectification of defects or the carrying out of outstanding work

    由承包人在按照合同規定履行缺陷矯正義務或進行未完工程的過中引起的損失。
  10. But contract payments on property, plant and equipment purchased or on construction - in - progress for construction to be used in operation should be classified under property, plant and equipment

    但因購置固定資產而依約預付之款項及備供營業使用之未完工程營造款,應列入固定資產項下。
  11. Notwithstanding the above, cover hereunder operates in full to indemnify the insured in respect of physical loss or damage to any outstanding work which is being undertaken during the defects liability period

    盡管已有上述規定,本保險在缺陷責任期內進行的未完工程的物質損失方面具有全部效力。
  12. Moreover, the hot and humid mountainous conditions were not congenial to the general health of the workers, causing many to be taken ill. phase ii of the scheme comprised the kowloon reception reservoir and the shek lei pui treatment works

    由於作時間緊迫,加上人尚全掌握使用炸藥的技術,故發生多宗意外傷亡事件,不少人更因山林瘴氣而感染瘧疾,相當艱巨。
  13. Depending on the amount of work pending, exiting the application immediately could be disastrous

    根據成的作數量來看,序立即結束的結果可能是損失慘重的。
  14. Currently, many problems are as follows : some people and engineers sometimes confuse or mistake so many conceptions and meanings of the price of construction product as to lead to troubles ; the cost of the construction product in the construction - auction - bid cannot be ascertained definitely ; the method of shop - drawing budget which is based on budget - ration cannot form effective market competition and market price of construction product. the management system of construction cost is not perfect

    目前建築產品價格及價格形成中存在以下問題:有關主管部門和少數人員有時混淆建築產品價格相關概念及其內涵,產生諸多誤解,以致造成作上的摩擦;對建築招標投標中建築產品成本內涵界定不清晰;以預算定額為依據的施圖預算方式難以形成有效的市場競爭以及形成建築產品的市場價格;當前能形成善的造價管理體制。
  15. The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand

    其主要思想與步驟為:首先運用計算機模擬技術來模擬序作業時間的隨機特性,產生概率最大的施網路計劃,並對其進行優化和調整,以獲得滿足期、質量要求的成本及網路計劃;在施中動態跟蹤施實際成本與進度與目標計劃所發生的偏差以及質量問題,然後根據已出現的偏差,利用計算機模擬技術對項目實施部分進行進度、成本的預測和分析,根據現有信息對網路計劃成部分進行調整和優化,以盡可能把各項費用控制在預定計劃成本之內或使的綜合指標最優。
  16. Water quality at station 3 is much better in this year than the previous years, although that at station 7 shows no improvement at all. increase flora and fauna ( including juvenile fish ) have been found in station 3 after rehabitation and better water quality

    各站水質較差者為第三站的湧泉池,因整建成,其水質已比往年好些,但第七站武勝溪的迎賓橋處,仍再進一步改善。
  17. 9 the carters plunged with enthusiasm into such projects as laying a sidewalk and putting a hardwood floor in their unfinished loft

    卡特夫婦熱情投入了諸如鋪設人行道、在尚的閣樓里鋪硬木地板這類
  18. But we are not done yet. we will discuss the next steps in drying fish next week. we will also describe the smoking process

    但,尚。我們在下個星期討論乾燥魚的其它步驟,並討論煙熏過
  19. While the water system in terreritos is not yet finished, the students completed the most difficult elements during their two - week visit, when they weren ' t dodging scorpions or playing soccer with villagers

    雖然特利利多斯村的供水系統尚,但是賓大學生在來訪的兩個星期間,趁著沒有閃躲蝎子或和村民玩足球的時候成最困難的
  20. 33 “ performance certificate ” means the contractor ' s certification, stating the date on which the subcontractor ' s obligations shall be considered to have been completed, to be issued after the latest of the expiry dates of the period pursuant to sub - clause 9. 1, or as soon thereafter as the subcontractor has completed any outstanding work, including remedying defects, tested all the subcontract works, and fulfilled the subcontract, all to the satisfaction of the contractor

    "履行證書"指總包商所簽發的證書,其中陳述了分包商義務應被認為履行的日期,最晚在根據副條款9 . 1所述的期間期滿后簽發,或在其後當分包商已成所有(包括修復缺陷) ,測試所有分包,履行分包合同,並均使總包商滿意后即刻簽發。
分享友人