板層巖 的英文怎麼說

中文拼音 [bǎncéngyán]
板層巖 英文
flagstone
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  1. Sedimentary control of coalbed methane in this region were expounded according to the control and influence of sedimentation on coal gathering action ( thickness of coal reservoirs, distributing and coal - bearing characteristics ), on forming and distributing, maceral, organic facies and coalfacies, cap formation types and their sealing capability of adjoining rock

    根據沉積作用對聚煤作用(煤儲的厚度、分佈及含煤性特徵) ,對煤儲的形成與展布、煤組成、有機相和煤相、頂底類型與封蓋性能的控制和影響,討論了沉積作用的控氣特徵。
  2. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地為三疊系雜谷腦組二段大理和三疊系雜谷腦組三段的砂。在勘探過程中,發現左岸壩肩大理體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地,為此壩基的防滲成為重要問題。
  3. In this case during paleozoic, nearly east west trending arc structures resulted from the interaction between china plate and siberian plate. in mesozoic the westward subduction of kula - pacific plate under the china continental plate resulted in the nne and ne trend structures ( duimadao fault, diaoyudao fault, okinawa fault, uplifts belts and subsidence belts ) as well as volcano - magmatic belts in eastern of china plate

    本文所涉及近東西向展布的弧形構造形成於古生代時期中國塊與西伯利亞塊的碰撞帶,而在中生代,中國塊下的kula - pacific塊向西俯沖導致了北北東向和北東向構造(如duimadao斷、 diaoyudao斷、 okinawa斷、隆起帶和沉降帶)以及位於中國塊東部的火山漿帶。
  4. Based on the bedding features of weak intercalations in sandstone plates near the top of underground cavity, the probable failure scale of bedding sliding, the probable settlement, the folding places and the critical length of sandstone beams are computed seperately, then the stability of underground cavity is analysed

    針對地下工程頂部狀砂中存在順發育軟弱夾的情況,分別對開挖后可能出現的間滑動破壞范圍、的沉降、折斷和臨界長度進行計算,並分析其穩定性。
  5. Control design of roof rocks for gob - side entry

    沿空留巷頂控制設計
  6. The airborne electric resistance mapping technique, lies in the conversion of measured airborne electromagnetic field signal into apparent electric resistance value that reflects underground strata through inversion or graticule transformation technique

    摘要航空電阻率填圖是通過反演或量轉換技術把測量到的航空電磁場信號換算成反映地下的視電阻率值。
  7. Main factors and mechanics influencing water inrush from roof snadstone

    影響徐州礦區煤涌水的主要因素及機理
  8. In the thesis, sand packed glass plate model was applied to physical simulation of the macroscopic throats forming mechanism, studied effects of these factors as sedimental characteristics, petrophysical property, production process etc. on the forming of macroscopic throats

    摘要動用填砂玻璃模型對疏鬆砂大孔道形成機理進行物理模擬,探討了沉積特徵、油物性、開發過程等因素對大孔道形成的影響,歸納了大孔道形成的因素模型及大孔道形成過程中的產量壓力特徵。
  9. The anchorage force of bolt, the displacement of deep surrounding rock, and the surface displacement of the gateway were comprehensively observed, indicating that the testing entry affected by dynamical mining pressure still keeps stable, achieving a good supporting effect

    錨桿受力、圍深部位移、頂及巷道表面位移綜合觀測表明,受回採動壓影響后,試驗巷道穩定,支護效果好。
  10. According to roof safety factor of 1. 2 for the mined - out area, minimum safety roof thickness at different rock in various span mined - out area was calculated by flac software, which transfixion of plastic zone was taken as criteria of roof breakage by using strength reduction technology and dichotomy theory

    摘要利用強度折減技術和二分法原理,以塑性區的貫通作為頂破壞的標準,當采空區頂的安全系數等於1 . 2時,利用flac軟體計算得出各種跨度空區在不同中的最小安全頂厚度。
  11. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基與底間設隔離、增設外防水、出水管與邊墻採用柔性連接、機座與底整體澆注、採用先進計算理論指導配筋。
  12. The relations of in - situ rock stress and water - resisting ability for floor aquifuge

    應力與煤隔水阻水能力的關系
  13. Based on the previous theoretical analysis, two practical projects of pile - raft foundation of high - rise building on soft ground are studied by using the software of pile - raft foundation interaction analysis program pogap. the choice of standing layer for pile, the rational compression modulus of soil under pile, the place of pile and the space between piles, and the reasonable thickness of plate are analyzed, some well - regulated conclusions can be achieved. an experiential equation for choosing the optimal thickness of plate is also given

    根據以上分析,結合兩個軟弱地基上高建築樁筏基礎的工程實例,利用浙江大學土工程研究所編制的pogap樁筏基礎共同作用分析軟體,就樁端持力的選擇,樁端下臥壓縮模量合理選值,樁位及樁間距的確定,筏厚度的合理取值等問題展開分析,得出了一些規律性的結論,提出了筏最佳厚取值的經驗公式。
  14. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面堆石壩壩基處理和防滲的原則及設計要點.趾基礎和堆石體各區砂礫石基礎開挖,除趾與其下游1 / 9底寬范圍以及壩腳挖除沖積至弱風化(局部微風化)基外,其餘部分均予以保留.斷破碎帶處理,趾部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾.為提高壩基的整體性和防滲性能,對趾進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面堆石壩的設計和研究提供參考與借鑒
  15. Guided with the theories of plate tectonics and complex hydrocarbon system, based on the analysis of geological factors of hydrocarbon pools in the northern area of tarim basin, the author puts forward the geological background favorable for and the possible areas most suitable for the formation of complex traps. the identification and description of complex traps lead to the recognization of five large and four middle or small complex traps, by the means of the main techniques and methods include the detailed interpretation of seismic profiles, drilling, logging, map compiling based on the depth of sealing surface and on the superimposed relation of stratigraphic lithology over and beneath the unconformity surfaces, and the the use of the reversion of jason and 3d coherent data. at the same time, the major controlling factors of complex trap oil pool have been analyzed based on the case study of typical oil pools in the paper

    目前,復合圈閉勘探及研究工作在我國還比較薄弱,本文以塊構造學、復式含油氣系統等理論為指導,通過對塔北地區石油地質特徵的整體解剖,從動態的角度,綜合分析和探索了塔北地區復合圈閉形成的地質背景及發育的有利區帶和領域,根據鉆、測井及地震剖面精細解釋成果,採用封閉面編圖、不整合面頂底性疊置關系編圖方法和jason及三維相干數據體等地球物理反演技術,發現大型復合圈閉顯示2個,中小型復合圈閉4個,復查落實大型復合圈閉3個,並通過典型油氣藏解剖,分析了塔北地區復合圈閉成藏主控因素分析。
  16. Experimental study on mechanical character of sandstone of the upper plank of coal bed under high temperature

    高溫狀態下力學特徵試驗研究
  17. On the basis of analyzing the geology conditions of qidong well field, using the rfpa2d analysis system, we have carried on the finite element analysis to the adjustment process of stress field and the damage evolution of the coal bed roof which was caused by coal bed mining

    摘要在分析祁東井田地質條件基礎上,利用rfpa2d分析系統對不同地應力條件下,由於煤開采引起煤發生的損傷演化和應力場調整的過程進行了有限元分析。
  18. Elementary analysis on occurrence condition of floor limestone water in no. 6 coal seam of shuoli mine

    朔里礦6煤水賦存情況淺析
  19. Analysis and prevention measures of mine roof sandstone flood in panji - xieqiao mining area

    潘謝礦區煤水害分析與防治措施
  20. Mechanical characteristics and cracking mechanism of coal roof sandstone under high temperature

    在高溫下的力學特性及破壞機理
分享友人