板樁圍堰 的英文怎麼說

中文拼音 [bǎnzhuāngwéiyàn]
板樁圍堰 英文
bulkheading
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞(較低的擋水建築物) weir
  1. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井鉆孔基礎,鋼在橋梁基礎施工中的應用越來越多。
  2. Steel sheet pile cellular cofferdam

    格型
  3. Steel sheet pile earth cofferdam

    填土
  4. The design amp; construction of single - wall steel pile cofferdam in deep water

    深水基坑單壁鋼板樁圍堰設計與施工
  5. Application of steel sheet pile cofferdam on excavation of deep water foundation pit

    板樁圍堰在深水基坑開挖施工中的應用
  6. Construction of cofferdam for bearing platform and steel sheet pile of main piers of huangzhou bridge

    黃洲大橋主墩承臺鋼板樁圍堰施工
  7. The design of the drilling platform for bored pile construction of hangzhou bay cross - sea bridge

    杭州灣跨海大橋承臺鋼板樁圍堰的設計與施工
  8. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高承臺吊箱的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  9. Sheet pile cofferdam

    板樁圍堰
分享友人