柱基腳 的英文怎麼說
中文拼音 [zhùjījiǎo]
柱基腳
英文
column footing
-
腳 :
腳名詞1 (人或動物的腿的下端 接觸地面的部分) foot; [兒語] footsie; footsy 2 (東西的最下部) bas...
-
The node that articu - lates designs beam column, can bear larger step in curved rules, the curved distance of sus - pension column is little, suits the building on soft land base
樑
柱鉸接的節點設計,能承受更大的跨中彎矩,
柱腳彎距小,適合於軟土地
基上的建築物。
-
( 2 ) the paper uses two methods to analyse the falsework structure and then get the basic data to guide the construction and installation of the falsework in sliding construction. these data play an important role in practice
( 2 )
基於扣件式鋼管
腳手架設計規范、鋼框架格構
柱兩種方法對胎架結構受力進行分析,進而得出能指導滑移施工中胎架的構造及搭設的
基本數據,其結果對工程實踐有重要的指導作用。
-
Analysis the force on the falsework by comparison to three calculation methods, referring the designing standard steel tube scaffold of buckling element, lattice column of steel frame and the computer program of sap2000. the result provides strong guidance for practicing it
基於扣件式鋼管
腳手架設計規范、鋼框架格構
柱及sap2000程序等三種方法對胎架結構受力進行分析、比較,其結果對工程實踐有重要的指導作用。
-
Top - directly as a basis and foundation of the bearing surface as the top - embedded steel bearings or bearing surface, the supporting surface, the anchor bolt ( anchor ) position should be consistent with the allowable deviation of norms
基礎頂面直接作為
柱的支承面和
基礎頂面預埋鋼板或支座作為
柱支承面時,其支承面、地
腳螺栓(錨栓)位置的允許偏差應符合規范的規定。
-
5 ) the method to calculate the natural periods of staggered truss with sshsti with raft - pile foundation is decided, and the natural periods of staggered truss with column foot fixed and sshsti with raft - pile foundation are calculated and investigated
5 )明確了計算地
基及樁筏
基礎共同作用時固有周期的計算方法,計高層鋼結構交錯析架體系一與地
基基礎共同作用研究算研究了交錯析架體系
柱腳固定時和地
基及樁筏
基礎共同作用時體系的各個固有周期。
-
Terrific close control from miroslav klose helped create germany ' s first chance of the match, with lukas podolski picking up the ball from his strike partner and teeing up michael ballack for a right - shooted shot that swerved wide of the post
第8分鐘:米洛斯拉夫?克洛澤漂亮的控球為德國隊創造了第一次機會,盧卡斯?波多爾斯
基接到鋒線搭檔的傳球,隨后將球傳給了米歇爾?巴拉克,然而後者的右
腳射門偏出了右側門
柱。
-
Construction of the footing at the east abutment and the centre pier for bridge no. str19 have been completed
鄰近於長沙橋編號str18的南橋墩基腳與及中間墩柱的基腳工程已完成