柱田 的英文怎麼說

中文拼音 [zhùtián]
柱田 英文
hashirada
  • : Ⅰ名詞1. (田地) field; farmland; cropland; land 2. (姓氏) a surname Ⅱ動詞[書面語] (打獵) hunt
  1. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江斷裂、金沙江-哀牢山斷裂及盆地中軸斷裂這三條巖石圈斷裂是主要的控盆-控巖(巖漿巖)構造及礦集區尺度的控礦構造;盆地中以三疊系為軸的背斜構造及相關的斷裂系統、盆地西南緣公郎弧形構造等是礦尺度的控礦構造;多組斷裂的交叉、層間破碎帶及地層中的氧化還原界面是形成礦體的有利部位。
  2. Development and application of columnar diagram in coalfield drilling

    鉆孔狀圖軟體的開發與應用
  3. In the course of working, , the plow will make use of the shuttling method so that it can dig alternately either on the left or on the right. compared to the unilateral plow, it can improve the productivity because it can help leave off the soil 、 take from the consumed energy and reduce the empty journey. to meet the requests above, we will use a remote cylinder with both a small cubage and double functions, approximately designing the plow to be columniform and symmetric. after the experiment for a period in the field, we found that the most frayed areas had happened at the places of both plow shank and share and at the same time the base of the remote cylinder had ruptured suddenly

    與單向犁相比,其優點在於:耕地無開、閉壟,地表平整,降低了耕后整地的能量消耗,減少了地頭的空行程,因而大大提高班次生產率。為了滿足犁體梭式作業的要求,我們採用了一隻小容積雙作用的液壓油缸;同時對犁壁曲面的形狀採用了近似圓形的對稱設計。但經過一段時間的間試驗,我們發現:該犁犁胸部分的犁脛和犁鏵上的犁尖在工作中磨損較為嚴重;主犁梁和油缸缸體的連接部分(即油缸底座)突然發生了斷裂,造成整個犁體無法正常工作。
  4. Over time, erosion has carved colorful claron milestones into thousands of spires, fins, arches and mazes. the formations collectively called " hoodoos, " and are arranged and tinted with various colors

    歷經百萬年侵蝕而成的石,有的如寶劍直插入雲,有的如少女婷婷玉立,由不得您不贊嘆宇宙滄海桑和造物者的神奇。
  5. Thatch hut is raised high above the paddy field on stilt

    茅草屋用高高地建在稻之上。
  6. Guangzhou meiche tian industrial co., ltd is one company that integrates development, car beauty and nitrogen tire inflator. by using leading manufacturing technology and high quality components at home and abroad, it manufactures ceramic plunge high pressure cleaning machine, traditional belthigh pressure cleaning machine, tunnel reciprocating car - washing equipment and pressure swing absorption high purity integrated nitrogen generator

    廣州市美車實業有限公司是一家集研發汽車美容、輪胎充氮設備,採用國內外領先製造技術及優質部件製造出陶瓷塞高壓力清洗機,傳統皮帶式高壓力清洗機,隧道龍門自動化洗車設備,以及變壓吸附式高純度充氮一體機。
  7. Shear failure water inrush mode at karst sink hole bottom in north china coal field

    華北型煤巖溶陷落頂底部剪切破壞突水模式
  8. Analysis of parameters of coal pillar in bulianta mine

    補連塔井區段煤參數分析
  9. Discussion on the distribution regulation of deposited pillars in hegang coal field

    何崗井陷落的分佈規律探討
  10. The growth way of pollen tubes in the style of shatinyu and its discernment

    柚花粉管在花中的生長途徑及其識別
  11. Immuno - gold localization of recognition prorein in the self - pollination style of shatinyu

    柚自交花中識別蛋白的免疫金定位
  12. There are two 18 - hole golf courses, a 60 - bay driving range with all the facilities a golfer would expect, a golf instruction centre and a clubhouse with a golf shop, a coffee shop and changing rooms. visitors can brush up their skills by hiring the bays on the driving range without advance booking, or enjoy a round of golf at the golf courses from monday to friday by making reservations ( except on public holidays )

    在東龍島的西北面,有聞名的石刻;那是本港標有日期的石刻中最古老的,于公元一二七四年製成,記錄著兩所天後廟的歷史,並敘述了一名負責管理鹽的人員的到訪經過,當時的鹽為香港經濟的重要支
  13. Explanation of coal mine subsided column with coherence technology

    大同煤陷落構造特徵淺析
  14. Archeological findings indicate that this area was used primarily for hunting with most habitation in the river valleys below. over time, erosion has carved colorful claron limestone into thousands of spires, fins, arches and mazes

    本日來到海拔八千尺的布萊斯峽谷,上萬個由風霜雪雨,歷經百萬年侵蝕而成的石,有的如寶劍直插入雲,有的如少女婷婷玉立,由不得您不贊嘆宇宙滄海桑和造物者的神奇。
  15. Laws of collapse columns and prediction of non - mining areas ximing well field of xishan coal field

    西山煤西銘井陷落規律及未采區預測
  16. Construction of new public toilets is planned for the kowloon tong public transport interchange in kowloon tong, wing on plaza garden in yau tsim district, tsam chuk wan in sai kung, lo wai road in tsuen wan, ma liu shui waterfront and science park road in sha tin, pak shek kok in tai po, the new wan chai market, the stanley complex and the stanley waterfront in southern district, and yee kuk street in sham shui po

    現正興建的新公廁位於九塘公共運輸交匯處油尖區永安廣場公園西貢斬竹灣荃灣老圍路沙馬料水海濱和科學園路大埔白石角新灣仔街市南區赤綜合大樓和赤海濱,以及深水醫局街。
  17. Through analyzing the scaling mechanism of water injection system in mawangmiao oilfield, applying the measure of scaling prevention, such as improving injection water quality, using glass fiber reinforced plastic materials, changing tubing string structures, and adopting new inhibited acid for acid dipping, the water injection forming scaling in mawangmiao oilfield has been solved, and the water injection development effect has been improved correspondingly in oilfield

    通過對馬王廟油注水系統結垢原理分析,改善注入水水質、使用玻璃鋼材料、改變管結構和採用新型緩蝕酸浸泡等防垢措施,較好地解決了馬王廟油注水系統結垢問題,相應改善了油注水開發效果。
  18. To solve the problem of the maximum running depth of coiled tubing, the maximum tensile condition, frictional condition and buckling condition should be satisfied

    在油使用連續油管作業中,求解連續油管的最大下入深度問題時,必須滿足最大抗拉強度條件、摩擦阻力條件和屈曲變形條件及其確定的方法和原則。
  19. Abstract : to solve the problem of the maximum running depth of coiled tubing, the maximum tensile condition, frictional condition and buckling condition should be satisfied

    文摘:在油使用連續油管作業中,求解連續油管的最大下入深度問題時,必須滿足最大抗拉強度條件、摩擦阻力條件和屈曲變形條件及其確定的方法和原則。
  20. Gmb routes 4a, 4b, 4c, 35m and 59a will be diverted via aberdeen main rod westbound and aberdeen praya road eastbound on journeys to causeway bay ; route 63 will omit aberdeen main road on journeys to south horizon ; and route 52 on aberdeen praya road eastbound heading for stanley will be diverted via aberdeen praya road westbound, tin wan hill road flyover, shek pai wan road and aberdeen praya road eastbound

    專小巴第4a 、 4b 、 4c 、 35m及59a號前往銅鑼灣方向將改經香港仔大道西行及香港仔海傍道東行;專小巴第63號前往海怡半島方向將不經香港仔大道專小巴第52號前往赤方向改經香港仔海傍道西行線、灣山道天橋、石排灣道及香港仔海傍道東行線。
分享友人