  1. Abstract : this paper discusses some problems in design of brick masonry building with internal frame under horizontal earthquake effect t he problems of the distance of asemic cross wall, the caculation model of outer wall - colum and interal frame, some asemic load bearing capacity the author ' s vi ew is also presented

    文摘:本文就多層內框架磚房在水平地震作用下抗震橫墻、外壁和內框架的計算模型,與有關抗震承載力計算等問題進行了分析,並提出作者的意見。
  2. The second temporary pier was such that its legs straddled the width of the pier.

    第二臨時墩的立柱間距超過橋墩的寬度。
  3. 1 the spacing of 2 - column is 910mm. it can suppress concrete curb bricks and slope bricks of 750 x 500 x 150mm

    1二工位立柱間距910mm ,可壓制750500150mm的混凝土路緣磚護坡磚等
  4. 2 the spacing of 4 - column is 780 780mm. it can suppress concrete curb bricks and slope bricks of 600 x 600 x 150mm

    2四工位立柱間距780780mm ,可壓制600600150mm的混凝土路緣磚護坡磚等。
  5. To solve the inaccuracy problem caused by the two existing methods ( average end - area method and prismoidal method ) used for the calculation of roadway earthwork volume, this paper puts forward a new concept of the 3 - dimensional algorithm that takes all the roadway geometric design procedures as a kind of geometrical operation between the ground model ( original terrain model ) and the roadway model ( designed model ) under certain constraints, and then presents a complete 3 - dimensional algorithm of roadway earthwork volume as well as its executable computer program. the algorithm benefits from the re - triangulation technique of constrained delaunay triangulation ( cdt ), which can yield a true volume value theoretically. through a number of practical tests covering varied intervals between adjacent cross sections, it is proven to possess a higher accuracy compared with that of traditional methods. all the work involved in this paper indicates that the 3 - dimensional calculation of roadway earthwork volume is feasible, more accurate and should have further application in practice

    針對目前廣泛使用的道路土方量計算方法平均斷面法和稜體法計算不準確的缺點,提出了三維土方量計算演算法的概念.該演算法以帶約束的狄羅尼三角化( cdt )為技術核心,認為所有道路幾何設計過程都是地面模型和道路(設計)模型進行幾何運算的結果.基於此,本文設計出相應的演算法步驟,同時完成了相應的軟體開發,使得該三維演算法能和傳統的方法進行對比.此外,結合工程實例,採用了不同的道路橫斷面對三維計算方法和傳統方法的誤差進行比較、分析.結果證明三維演算法具有更好的精度,該演算法可用於道路、場地平整等工程土方量計算
  6. Secondly, by making use of the features of lattice frame anchor structure which can protect slope and retain stability of landslide together with its small space between beams and light anchor, the calculation model and formulas of slope force are dealt with and the design process of lattice beam and pillar as well as anchor and plate are introduced carefully

    利用格構式錨桿框架結構所採用的小、小噸位錨桿及連續格構樑,從而使格構樑受力較均勻,適合鬆散堆積體滑坡治理的需要,即同時滿足深層抗滑和淺層護坡。
  7. Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad

    然後,本文在考慮材料、幾何和狀態三重非線性的基礎上,對該連接形式進行了全面的計算機模擬,主要考慮了帶懸臂梁段全螺栓拼接的樑連接節點與無拼接的樑連接及翼緣對接焊接腹板拼接的連接節點的對比,各種設計方法之的對比,以及翼緣拼接和腹板拼接的螺栓、直徑和數量,拼接點與梁端之離,梁和的翼緣、腹板厚度,的軸力,接觸面的摩擦系數,翼緣和腹板拼接板的厚度等因素的影響。
  8. The r esults of calculation and analysis indicate : the bracing effect from wallboard increases the load capacity of wall stud by 1. 6 - 1. 8 times ; the reasonable distance between fasteners of wall stud is l / 8, l is the length of wall stud ; there is no necessity to considering bracing effect from wallboard in the direction of perpendicular to wallboard

    分析結果表明:考慮支承效應后,墻體立的承載能力比原來提高了1 . 6 1 . 8倍:立墻板連接件取s = l / 8較為合理, l為立的長度;可不考慮墻板對立沿垂直墻面方向提供的支承效應。
  9. The present results indicate that the diamond element always yields the highest heat transfer, followed by cube and waterdrop pin - fin. however, the pressure drop for the diamond pin is higher compared to the cube and waterdrop pin - fin. arrays with geometric parameters x / d = 2. 7 elements generally cause the greater heat transfer and pressure loss than those with x / d = 3. 3 and x / d = 4

    研究結果表明:鉆石形擾流排換熱最強,方形次之,液滴形最弱,相應地鉆石形擾流排壓力損失也最大,方形次之,液滴形最弱;小( x / d = 2 . 7 )在換熱較強的同時壓力損失也高於其他兩種
  10. Answer 4 : it can be adjusted according to the arrangement of structure column net

    答:線根據結構網的布局可適當調整。
  11. Basing the analysis on the experimental data, the author provides the load - bearing capacity formula of the concrete short column confined by overlapping hoops under uniaxial compression and the relationship between characteristic value of hoop and spacing of hoop, which is of great practical value

    摘要通過實驗數據的分析,提出了軸心受壓復合方箍短正截面承載力的計算公式並給出了配箍特徵值與箍筋的關系,具有一定的實用價值。
  12. Six circular concrete columns were tested under concentric loading, to investigate the confinement effect of confining reinforcement in both normal strength and high strength concrete columns. test results were analyzed and compared. practical formulas were proposed for the minimum volumetric ratio and the spacing of the stirrups

    通過對6根圓體混凝土的軸壓試驗,研究普通混凝土及高強混凝土在箍筋作用下的約束效應,並將試驗結果進行分析比較,提出了配箍率及箍筋實用計算公式。
  13. Answer 9 : structural columns can be built between main lien and arrival and departure line, but not between main lines. the column shall meet the requirement of track spacing

    答:鐵路正線與與正線之不可以設結構。鐵路正線與到發線之可以設結構,但要滿足線的要求。
  14. According to the elastic bucking theory this paper reviews and compares the calculations that such member bend around the reat axis and the hollow axis as well as bend with torsion around the hollow axis. here this paper presents a formula of calculating b used in with the h - shaped anglicizing element. meanwhile, this paper deduces out a formula of calculating b. by, which the member could be controlled to only buckle around the real axis

    本文根據彈性屈曲理論對雙肢格構式單軸對稱綴板繞實軸、虛軸以及彎扭屈曲進行了計算分析和比較,提出了繞虛軸側向屈曲的換算長細比_ ( oy ) = ( y ~ 2 + l ~ 2 ) ~ ( 1 / 2 )中的值用h計算單元指出的計算公式,同時推導出了單軸對稱綴板只出現繞實軸彎曲屈曲的最小肢b 。
  15. The experiments have tested the rigidity of connections that is the m curve of connections, researched two kinds of destruction modes of beam - to - column connections, analyzed stress of the plate and the influence of the member ' s plate thickness, the quantity of self - drilling screws, the diameter of self - drilling screws, the interval of self - drilling screws to the rigidity of connections

    實驗針對連接節點的剛度即連接的m曲線進行了測試,並著重研究樑節點的兩種破壞模式,分析了板域的應力分佈以及構件的板厚、連接螺釘的數量、直徑以及螺釘對連接節點剛度的影響。
  16. This paper investigates and presents the design methods for lateral braces between equal spaced columns reducing the effective lengths of the columns to half

    本文探討了一排等布置的承受相同軸力的等截面,使計算長度減少至0 . 5l時所需橫向水平撐桿的設計問題。
  17. ( 3 ) based on the experiments data, it has been found that if the emitter discharge of sdi was little, the depth of pipe buried should be shallow, and the distance between two micro holes should be chosen to equal or close the distance between two lateral pipes, if the emitter discharge of sdi was great, the pipe may be buried deeper, and the distance between two micro holes could be greater than the distance between two lateral pipes

    根據一維土近似的濕潤輪廓線初步選定了工程設計參數。在地下滴灌灌水器出流量較小情況下,埋深應淺,孔應選擇和毛管相等或接近;出流量大時,埋深可深,孔大於毛管仍可獲得較均勻的土壤水分分佈。
  18. The alternative is to reduce the height of the wall unit, keeping its length equal to the column spacing

    另一種辦法是把墻體構件的高度降低,使構件的長度等於柱間距
  19. The effects of pin shape and array configuration on the heat transfer and pressure drop of short pin - fin arrays have been investigated experimentally

    本文通過試驗的方法研究了形和柱間距對叉排型短擾流排內的壓力損失和換熱的影響。
  20. All columns are made of solid steel. this machine can produce any types of cement products under the measurement of 1000 x 500 x 250, such as slope bricks, curbstone bricks, slope top bricks, slope bottom bricks, moat covers

    1該機工作臺面大,立柱間距1400mm ,立均採用實心鋼材加工而成,該機可生產1000500250 mm以下各種規格形狀的水泥製品。