核準圖則 的英文怎麼說

中文拼音 [zhǔn]
核準圖則 英文
approved layout
  • : 核構詞成分。
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • : Ⅰ名詞1 (規范) standard; norm; criterion 2 (規則) regulation; rule; law 3 (姓氏) a surname Ⅱ...
  1. Approved drainage authority area plan

    排水監管區
  2. Approved statutory plan

    法定
  3. This dissertation is faced to the process of steel rolling to found network of manufacture material flow, basing on it founding guide line evaluation system of the cost of unit standard producing working procedure, guide line evaluation system of the quality cost of unit standard producing working procedure and guide line evaluation system of performance and efficiency ; and base on the cost data of all kinds of material flows, manufacture flow, flux data, manpower, energy consume, material consume, capital asserts occupied, fund occupied, and the production in working procedure, throughput of the materials in working procedures in the flow and countercurrent flow in the network of material flow of recorded in working procedure producing, using the “ whole closed down lane ” model to describe network of manufacture material flow of steel rolling, found the cost analyzing model system of the network faced to producing process. make the cost increasing of the producing by abnormity material flow in working procedure, and even the cost increasing of the producing procedure as the cost of the management behavior of working procedure fallen under cost evaluation guideline in responsible working procedure, so as to ration measure the factors fast correlated with management behavior by measuring the cost

    在企業管理信息化輔助工具所建立的數據平臺基礎上,建立了以基物流模型為基礎的軋鋼生產主流程物流網路拓撲,根據論的理論求解最大流量和最小費用;計算每個生產節點的加工成本,分離質量成本,克服了單純財務數據進行成本算所帶來的缺陷;建立了軋鋼生產主流程工序含鐵物料吞吐能力基模型,並根據此模型建立了軋鋼生產主流程工序激勵物流協調性和匹配性、工序響應物流協調性和匹配性分析的過程能力指數計算方法;通過引入決策單元綜合投入與綜合產出效率最優原的模型和基於投入不變、分析產出是否有效或基於產出不變、分析投入是否有效的模型,實現了對多個績效指標在不同績效值集合之間的相對比較,並可根據投入產出效率、或者投入(產出)有效性進行排序。
  4. This research project, based on the existing problems in mathematics curriculum evaluation and the conceptions of mathematics curriculum as the guideline, systematically analyzes the basic characteristics of the developmental evaluation, i. e. multi - dimensional, formative, developmental, understanding and inspiring. drawing on the modern mathematics conceptions, multi - intelligence theory and theories of constructivism, this project systemically illustrated the connotation of the developmental evaluation : the key of evaluation is for application ; the goal is multi - dimensional ; the process is context - dependent ; the outcome is to promote the development. in view of the conceptions of developmental evaluation ( i. e. human - centered whole evaluation ; quality - focused overall evaluation ; participation - stressed autonomous evaluation ; future - faced evaluation ; guiding evaluation and inspiring evaluation ), the components of the developmental evaluation model in the new mathematics curriculum is analyzed in details in this project ( i. e. goal system, subject system and object system ) and the core structure of the developmental evaluation is established ( i. e. evaluation indicator system model )

    本課題研究以數學課程評價的現存問題為著手點,以數學課程理念為目標指向,系統分析了數學新課程發展性評價的多元性、形成性、發展性、理解性、激勵性等基本特徵;以現代數學觀、多元智力理論、建構主義理論以及成功智力理論為理論背景,系統闡述了數學新課程發展性評價之意蘊?評價心聚焦應用,評價目標指向多元,評價過程依存情境,評價結果歸依發展;以數學新課程發展性評價理念,即以人為本的全體性評價、注重素質的全面性評價、注重參與的自主性評價、促進完善的引導性評價、不斷進取的激勵性評價、面向未來的期望性評價為航標,深入剖析了數學新課程發展性評價模式的構成成分,即目標系統、主體系統和客體系統,由此構建發展性評價模式的式?評價指標體系的模式:以數學新課程發展性評價過程為參照,尋求並創設評價的設計技術,評價權重的構造技術,評價信息的收集技術,評價結果的分析與處理技術;以數學新課程評價系統內蘊的一般認識論、發生認識論與發展認識論指導評價方法,詳細探討了檔案袋法、表現性評價、自我評價與同伴評定相結合的方法、蘇格拉底式研討評定和測驗法在評價中的應用。
  5. In connection with this, it is relevant to note that in commenting on sph s allegation that the government has " rushed " into awarding the criii in february 2003, mr justice hartmann remarked that " the executive cannot always bow to the pressure of threatened litigation and it is always a question of policy whether an approved plan should be fulfilled without delay or whether delay is prudent " para. 91 of the judgment

    在這方面,應注意的一點是,夏正民法官在評論保護海港協會指政府在2003年2月"倉猝"批出中區填海第三期工程合約時指出, "行政機關不能在每當有人以訴訟要脅時便作出讓步,至於應否如期按照落實工程計劃,還是暫緩施工較為謹慎,始終屬于政策方面的考慮"判詞第91段。
  6. Development proposals which have already obtained building plan approval will not be affected by an amendment to the zoning restriction

    土地用途限制的修訂並不會影響建築已獲的發展計劃。
  7. Some development proposals which have obtained building plan approval prior to the stipulation of a new zoning restriction ( i. e. a new land use zone or a new development restriction ) may thus become non - conforming when the restriction comes into effect

    有些在新的土地用途限制(即劃定新的土地用途地帶或實施新的發展限制)實施前已獲建築的發展計劃,因而可能在有關限制生效后變為不符合規劃。
  8. Both exhibited for public inspection on 5 july 2002

    兩份核準圖則在二二年七月五日供公眾查閱
  9. Speedpost enquiry and pickup services stamping of property document

    向建築事務監督申請查閱核準圖則及文件
  10. Publication of an approved plan

    公布核準圖則
  11. Application to building authority for inspection of approved plans and documents

    向建築事務監督申請查閱核準圖則及文件
  12. The ce in c also referred 13 approved plans back to the board for amendment

    行政長官會同行政會議又把13份核準圖則發還委員會修訂。
  13. F one of sph s arguments for ce in c to refer the approved plan to tpb for reconsideration is that the plan, which was prepared based on an incorrect interpretation of section 3 of the pho, should be made subject to a formal consultation process as provided for under the tpo

    F就行政長官會同行政會議把已核準圖則發還城規會重新審議一事,保護海港協會其中一個論點是認為是在錯誤詮釋保護海港條例第3條的情況下擬備,所以應根據城市規劃條例規定,把經由正式諮詢程序通過。
  14. It should be noted that the central ozp, with the current extent of reclamation, was approved by the ce in c in february 2000 following the statutory plan making process including public consultation. that central ozp has never been held to be invalid or contrary to law

    要注意的是,以目前填海范圍而言,中區大綱是在經過包括公眾諮詢的法定訂定程序后,在2000年2月獲行政長官會同行政會議,中區大綱始終沒有被裁定為無效或違法。
  15. Departments implemented more than 30 specific measures, including streamlining procedures and reducing the processing time in the approval of general building plan and related submissions, significantly shortening the retrieval time for approved building plans by introduction of a pilot electronic retrieval system, and facilitating the submission of public forms by businesses and individuals electronically through the internet

    各部門已實施超過30項具體措施,當中包括簡化審批一般建築及有關文件的程序和縮短審批時間;推行電子檢索系統試驗計劃,大幅縮短檢索建築的時間;以及提供電子政府表格,方便工商界和個別市民利用網際網路遞交。
  16. A the central ozp is an approved plan which has gone through a due and diligent process of scrutiny

    A中區大綱是通過妥善而嚴格的審程序后
  17. All new plans, amendments to approved plans or amendments to draft plans will be exhibited for two months for public inspection

    所有新的修訂或草的修訂,都會予以展示,為期兩個月,以供公眾查閱;
  18. Certification of building plans by private professionals

    由私人專業人士建築
  19. Any person may make an application to the board for amendment of an approved plan or a draft plan ( except for a new draft plan or matters relating to an amendment shown on the amendment plan )

    任何人均可就修訂或草向城規會提出申請,但新的草或與修訂上顯示的修訂有關的事項除外;
  20. The outline zoning plan is a statutory instrument. any development or redevelopment on the site is subject to the parameters and restrictions stipulated in the plan

    分區計劃大綱屬法定,在有關地段進行任何發展或重建,必須符合所訂規限。
分享友人