核破壞的責任 的英文怎麼說
中文拼音 [hépòhuàidezérèn]
核破壞的責任
英文
liability for nuclear damages- 核 : 核構詞成分。
- 破 : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
- 壞 : Ⅰ形容詞1 (不好的; 惡劣的; 使人不滿意的) bad 2 (表示程度深 多用在表示心理狀態的動詞或形容詞後面...
- 的 : 4次方是 The fourth power of 2 is direction
- 責 : Ⅰ名詞(責任) duty; responsibility Ⅱ動詞1 (要求做成某事或行事達到一定標準) demand; ask for; req...
- 任 : 任名詞(姓氏) a surname
- 破壞 : 1 (使建築物等損壞) destroy; wreck; ruin 2 (使事物受到損害) do great damage to; do harm to; da...
- 責任 : 1. (應做的事) duty; responsibility 2. (應承擔的過失) responsibility for a fault or wrong; blame
-
Next, with the aid of “ european common core project research ” the author divides the experience type of pure economic loss into five types : suffering from the destruction of public facility case, the employee case, the professional service personnel neglects duty case, the product responsibility case and rents 、 insurance 、 contract shifting case
其次,筆者藉助歐洲共同核心項目的研究成果,將純粹經濟損失的經驗類型劃分為破壞公用設施牽連受損案、雇員案、專業服務人員失職案、產品責任案和租賃保險合同轉移案五種,為進一步的研究和抽象提供了基本素材。Some primary researches are given in this paper, combined with the project - stability evaluation of concrete high arch dam of tengzigou, which is cooperated between hydraulic structure center of hohai university and dongbei hydroelectric investigation & design ltd. considering actual research work and specification, either concrete strength limit analysis of dam or shear failure of seams in rock abutments are taken singly into account for safety evaluation of high arch dam
本文就這個問題,結合河海大學水工結構所和水利部東北勘測設計研究有限責任公司的合作項目?藤子溝水電站雙曲拱壩整體穩定性分析,在這方面做了一些初步研究。現行規范將壩體混凝土強度校核和壩肩穩定安全度評價分開進行,沒有考慮兩者的關聯性,然而這兩類破壞常常是相互聯系,伴隨發生的。Liability for nuclear damages
核破壞的責任
分享友人