根鉆 的英文怎麼說

中文拼音 [gēnzhēn]
根鉆 英文
root bur
  • : Ⅰ名詞1 (植物的營養器官) root (of a plant) 2 (比喻子孫後代) descendants; posterity 3 [數學] ...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  1. Secondly, programmed the image processing arithmetic code which include the bottom arithmetic for the general condition comprises threshold division, region combination and informate and the middle level arithmetic for the given task comprises detecting the line dation creirection according to the hough transform in order to fix on the hole ’ s azimuth angle, detecting the aiguille tip position according to the image movement according to the environment and the image format

    然後,據目標環境要求和攝像機採集圖像格式,開發了圖像處理演算法程序。圖像處理演算法包括底層演算法和中層演算法兩部分,底層演算法針對通用情況,包括閾值分割、區域合併和信息生成。中層演算法針對具體任務設計,包括利用hough變換檢測棱線的方向,從而確定圓孔的方位角和利用基於圖像運動檢測頭尖端位置。
  2. Under the guidance of theories of sedimentology, petroleum geology and sequence stratigraphy, and through the comprehensive analysis of outcropsrock, cores, well logs and testing outcomes of rock gas, this paper studies the depositional systems of neopaleozoic and the character of aeration zone in tabamiao area of ordos basin. the result indicates that the object layers are divided into two depositional systems, the barrier seacoast depositional systems are recognized on upper carboniferous taiyuan phase with tidal flat, lagoon and barrier bar sedimentary deposit

    本文據沉積學、石油地質學和層序地層學理論,綜合利用地表露頭、井巖芯、測井曲線資料和試氣成果資料,對鄂爾多斯盆地塔巴廟區塊晚古生代沉積體系及含氣層特徵進行了研究。結果表明,研究區內目的層段可以劃分為2個沉積體系: ( 1 )上石炭統太原期為有障壁海岸沉積體系,發育潮坪?瀉湖?障壁砂壩沉積。
  3. The buried gold - bearing hydrofracturing breccia bodies predicted on the basis of the partitioning deformation tectonic type have been proved by drilling

    據構造模型預測的隱伏含金水壓角礫巖體己獲探初步驗證。
  4. On the basis of having refered larg number of abroad test - well data and having investigated same local test - well, this dissertation have designed the drill and petroleum extraction tools test - well whole scheme to fit the well drill and petroleum extraction busywork characteristic and the demand of technique store for the dagang oil - field

    本文是在進行了大量的國外試驗井資料查閱及國內試驗井調研的基礎上,據大港油田采作業的特點和技術儲備的要求進行了采工具試驗井總體方案的設計。
  5. There are some mischievous and prosaic people who carp and calculate at every detail of the romancer.

    有些刁促狹,迂腐愚蠢的人,喜歡吹毛求疵,對小說家的每一個細節都要追究底。
  6. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡整治方法.風動潛孔錘進是一種具有許多優點的進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、進規程參數小、可實現大直徑基巖孔等都適合於抗滑樁施工.文章在介紹風動潛孔錘進特點的基礎上,據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可行性,並舉出了其應用實例
  7. The discovery well was drilled in 1927 on the basis of magnetic and torsion-balance surveys.

    其發現井是1927年據磁力和扭稱測量結果而探的。
  8. The le - an oil field is located on the southern slope of dong - ying sag. there are two sets of ek basalt in its western block. depending on the drilling, the logging and the seismic date, tha ek basalt has the characteristics of high resistancs, the low sound wave defferance and faradic conductance, the smooth curve of self potential

    樂安油田位於東營窪陷南斜坡上,其西區發育了兩套孔店組玄武巖,井、測井、地震資料,孔店組玄武巖具有電阻率高、聲波時差值和感應電導率值低、自然電位曲線平直的特點,地震波呈板狀強反射;沉積期該區有有二次火山活動,玄武巖平面分佈比較穩定,噴發方式為「裂隙式噴溢」 ,火山口分別位於草12和草31井附近。
  9. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    據光面爆破的基本原理,從最小抵抗線、爆眼密集系數、不耦合系數、線裝藥密度、爆破進尺等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道爆設計在隧道施工中的運用取得的成效,提高了施工進度,同時也保證了施工質量。
  10. Benthic foraminifer fauna, ams14c dating and acoustic sub - bottom profile was analyzed in the core ey02 - 2 and ey02 - 1 drilled from the muddy deposit in the middle southern yellow sea and the mid - shelf of north east china sea. considering the results of core qc2 ? dz4 and the standard oxygen isotope curves, we discussed the late - quaterenary paleo - environment evolution, benthic foraminifer fauna, paleo - climate, the climate events and water mass in postglacial period, average sedimentation rates, paleo - water depth, origin of sediments, average sea level rise rate in the shelf of south yellow sea and east china sea. at last we discussed the condition of sea level rise in the east china, green house effect and the protection of coastal zone

    本文據南黃海中部泥質區和東海中陸架的兩個孔巖芯的古生物、 ams ~ ( 14 ) c測年、淺地層剖面等,參考qc _ 2 、 dz _ 4成果及標準氧同位素曲線探討了黃東海陸架晚第四紀古環境演化、底棲動物群特徵、古氣候、冰後期以來氣候事件、古水團、沉積速率、古水深、沉積物源、海平面平均上升率,討論目前中國東部海平面上升的狀況、溫室效應及海岸帶保護。
  11. Based on [ backlight53 ' s words : in addition to walking with matsu and serving free tea and water because they made the wish, the most important tradition is going through matsu ' s palankeen

    據月巴的說法:扣除跟著一起走的和發願無償供應涼水飲料的人,重點就是傳統習俗:轎底。
  12. My wife was asking for pin money, and the pin she wanted has eight diamond in it

    內人跟我要針線錢(零用錢) ,而她想買的那針是鑲有八粒石的呢。
  13. The sensation was like being touched in the marrow with some pungent and searching acid, and it set my very teeth on edge.

    只覺得好似骨髓里沾上了一種孔入縫的烈性酸液,弄得我牙發酸。
  14. On the basis of kinetics ' basic principle of well drilling shaker, the kinetic condition of solid phased particles in well drilling liquid, under the status of un submersion, doing four movements as backward sliding, tossing, keeping motionless and forward sliding relative to the surface of vibrating sieve has been analyzed

    摘要井篩動力學的基本原理,分析了井液中固相顆粒在非淹沒狀態下相對于振動篩面作后滑、拋擲、靜止和前滑4種運動狀態的動力學條件。
  15. Stock stout, forming an erect trunk sometimes up to 1 m tall, apex densely covered with subulate shining brown scales

    狀莖粗短,直立,高可達1米,頂端密被棕褐色、具光澤的形鱗片。
  16. In view of cost, practicability and maneuverability, the special sintering diamond trepanning drill was developed for drilling ceramic composite components originally

    據復合構件加工中的各種缺陷,分析了採用預壓應力削對改善表面加工質量的重要性。
  17. Make up 2 joints of drill pipe

    接兩根鉆
  18. In this paper, depending on the enormous 356 pile testing date detailed with soil and pile parameters and p ~ s curves, covering xi ' an and adjacent areas, we analyzed the load transmission mechanism of pile in loess foundation, and proposed a kind of hyperbolic load transmission function between pile and it ' s neighboring soil. meanwhile, we created a mathematical model to predict p ~ s curve and bearing capacity of single pile. by analyzing the compacting effect caused by pile - sinking of pressed pile in loess and it ' s influence on bearing capacity and settlement, two parameters, kc and ke are introduced to modify the soil cohesive c and deformation modulus es

    本文利用現己收集到的西安及其周邊地區356打入樁、靜壓樁、灌注樁的現場試樁資料(其中打入樁67,靜壓樁121孔灌注樁168,並有詳細的地層勘探資料,樁深資料,荷載沉降?曲線)對西安黃土地基中的打入樁、靜壓樁、灌注樁的荷載傳遞機理進行了分析研究,認為用雙曲線型的荷載傳遞函數模擬樁土之間的荷載傳遞函數是合適的,並用荷載傳遞分析的方法建立了計算p s曲線的數學模型及極限承載力的確定方法。
  19. Thirty roots of precast reinforced concrete piles and bored and cast - in - place piles in xi ' an had been trained with this model, and nine roots o f precast reinforced concrete piles and eight roots of cast - in - place piles had been predicted by simulating. when contrasted and analyzed the predicting result and actual numerical value, the error is always less than 20 % ( mostly within 15 % ), which has achieved a better result

    利用該模型對西安地區鋼筋混凝土預制樁、孔灌注樁各30作為樣本進行了訓練,並分別對9鋼筋混凝土預制樁和8根鉆孔灌注樁進行了模擬預測,將預測結果與實測值進行了對比分析,其誤差都在20以內(大部分在15以內) ,取得了較好的結果。
  20. Don t set this stand back

    根鉆桿不要放在桿盒上
分享友人