梁拱梁拱 的英文怎麼說

中文拼音 [liánggǒngliánggǒng]
梁拱梁拱 英文
round of beam
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. Therefore how to simulate exactly an arcuated built - up system bridge, carry calculation and design of it and obtain behaviors in accord with facts, is a urgent task in front of bridge workers

    因此如何正確模擬式組合體系橋,進行式組合體系橋的設計和計算,獲得符合實際的受力性能,一直是擺在橋工作者面前的一項迫切任務。
  2. Either of the sides of an arch, curving down from the apex to an impost

    腋,門上任意一個從頂到墩間的部分
  3. The architectural melting pot is seen in the tall romanesque columns, the gothic hammervault roofing

    建築學上的融合見于高大的羅馬式圓柱和哥特式椽尾形頂上。
  4. Three - dimensional photoelastic test of beam - arch joint of open spandrel rigid - frame arch bridge

    空腹式剛架節點三維光彈性試驗研究
  5. Spatial static behaviors analysis on beam - arch joint of new - type rigid - framed arch bridge with open spandrel

    空腹式新型鋼架節點空間受力分析
  6. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )設計吊桿式架支承結構時,各部分構件應當均勻對稱布置。另外,還應注意頭道腳附近截面的尺寸擬定,克服地震內力造成的大偏心受壓狀態給結構配筋設計增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震荷載分佈均勻一些。
  7. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情況,對於五跨組合橋各孔跨合理的跨度比、疊的受力行為及連續系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續系桿的剛度和應力情況、鋼管混凝土的應力情況。
  8. Controlling the camber of main girder for the overhead travelling crane use for deadweight method

    採用自重法控制橋式起重機主的上
  9. ( 3 ) the deflection upwards of simple supported beam is calculated by the means of unites elastic and plastic analysis into finite - element theory

    ( 3 )利用混凝土的彈性徐變計算理論對預應力混凝土簡支t的起度進行了編程計算。
  10. The deflection upwards of prestressed concrete beam can be predicted much accurately than before and mastered effectively through the massive work of this paper

    通過本文的大量工作證明,預應力混凝土橋的起度是可以較精確地預估並進行有效控制的。
  11. ( 2 ) deflection upwards is programmed and estimated precisely on the concise calculation model. ( 3 ) effective methods in design and construction are provided to control over - deformation

    ( 2 )利用簡潔有效的計算模型較精確地預估了預應力混凝土t的起度,並編制了相應的計算程序。
  12. Single arch beam

    單跨
  13. Stumps were inserted and welded between the two straddles so that the girders become an integrated arched girder

    變異高低跨連接處採用短柱焊接,形成一個完整的鋼
  14. 3 ) the influences on the internal forces by some variable parameters such as the ratio of the rise to span and the stiffness ratio are compared. the optimal range of these parameters is pointed out and some advances are also given

    研究探討了矢跨比、剛度比等參數對預應力混凝土連續組合體系橋結構內力的影響,並得出合理的取值范圍,為設計人員選取結構參數提供參考。
  15. Based on the arch - cantilever method, the stability of arch ring and cantilever beam against elastic buckling in arch dams are analyzed with the theory of elastic stability, and the conclusion is drawn that the stability of arch dam against elastic buckling is governed by the top arch ring

    按照分載法的思想,用彈性穩定理論分別對壩的圈和懸臂的抗屈曲穩定性進行了分析,得出壩的抗屈曲穩定性由壩頂圈控制的結論。
  16. Finite element internal force method is presented in this paper to solve it, based on the result of the routine method. this method utilizes the condition of internal force balance of arch system and beam system to solve their internal forces, then to solve dam body ' s equivalent stresses

    為此,本文提出了有限元內力法,該方法是根據常規有限元法的分析結果,利用的內力平衡條件求解內力,然後求解壩體等效應力。
  17. Abstract : the continuous composite arch bridges are introduced in this paper. some research results of the bridges, such as the basic performance, creep and shrinkage of concrete, principle of the controlled completed bridge state, relation between structure and internal force, construction methods and cases, are also reported. the suggestions for consideration in design are given in this paper

    文摘:介紹了連續組合橋在受力性能、混凝土收縮徐變、成橋狀態控制原則、構造與受力關系,以及常用施工方法與工況描述等方面的研究體會,並給出了可供這類橋設計參考的意見。
  18. After an introduction to the research on the software for the design of the variant steel arched girder construction, the creation of the structural model, the structure of the supporting seat, the design of the variant arched girder, and the measures taken to ensure the stability of the plane surface of the arched girder, the thesis goes to study the methods for the hoisting and the angle setting of the long - span arched girders, as well as the bolting of the axle pin in the hinge support

    論文首先對變異鋼架結構設計可採用的軟體、結構模型的建立、支座構造形式、變異的設計,以及保證平面外穩定所採取的措施等進行了研究,然後研究了大跨度變異鋼架弧形吊裝、角度的調整、鉸支座穿軸銷等的施工方法,最後對施工完成後的位移進行了實際量測。
  19. In this study, sts - - the steel construction design module of pkpm, a software program of china " s institute of the construction science - - is employed to create the construction model in order to study the construction of the supporting seat. a mechanical analysis of the variant arched girders was implemented, with the result that consturction documents meeting mechanical requirements were designed for the hinge support, the roller support and the steel girders

    本文採用中國建築科學研究院pkpm軟體的鋼結構設計模塊sts ,從結構建模入手,根據規范要求研究了支座的構造形式,通過對變異的力學分析,設計出符合力學模型的鉸支座、滑移支座和變異處鋼的施工圖。
  20. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用肋承擔壓力,系預應力束抵抗端推力,吊桿及縱橫橋面系結構承受橋面荷載,既克服了傳統橋巨大的端推力,又改善了連續橋較大的彎矩和剪力的受力狀況,最大限度地發揮了混凝土和預應力鋼筋各自的特點,經濟效益顯著。
分享友人