梁間焊接 的英文怎麼說

中文拼音 [liángjiānhànjiē]
梁間焊接 英文
beam-to-beam weld
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 焊接 : weld; welding; soldering; seal; sealing; sealing-in; shutting together
  1. In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given

    另外,作者對重級工作制鋼吊車腹板與上翼緣連縫的縱向水平疲勞裂縫進行了長期的觀察和研究,根據疲勞裂縫產生的不同機理,將其分為支點裂縫和肋裂縫,並討論了兩類裂縫產生的原因、分佈規律、機理以及防治的措施;對工程中經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂縫、腐蝕與老化)進行了機理分析並提出了防治措施。
  2. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車系統的外觀情況(包括連、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車出現疲勞裂縫的原因,制定了初軋廠精整車破損鋼吊車的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  3. Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad

    然後,本文在考慮材料、幾何和狀態三重非線性的基礎上,對該連形式進行了全面的計算機模擬,主要考慮了帶懸臂段全螺栓拼的樑柱連節點與無拼的樑柱連及翼緣對腹板拼的連節點的對比,各種設計方法之的對比,以及翼緣拼和腹板拼的螺栓距、直徑和數量,拼點與端之的距離,和柱的翼緣、腹板厚度,柱的軸力,觸面的摩擦系數,翼緣和腹板拼板的厚度等因素的影響。
  4. Instead of the conventional node - node model, the spot - weld is modeled by a new short beam element introduced into between node and clement, which is subject to the tensile and shear forces

    新型單元在有限元節點與單元之引入短單元來模擬關系,單元承受拉伸力和剪切力。
  5. 962m respectively ). neighbouring segments are linked with bolts and welding. after the girders were segmented, guesseted plates were used with high - strength bolted oints to connect the web plates, and the higher and lower flange plates were butt - welded

    相鄰段之的連形式為栓混合型連,採用節點板把腹板用高強螺栓連後上、下翼緣板分別對
  6. Shear properties in the plane of the panel ( interlaminar shear ) duplicate the kind of shear stress encountered in such glued structural assemblies as structural sandwiches and adjacent to gluelines between flanges and webs in box - beams and i - beams and gusset plates in trusses

    面板平面的剪切特性(層剪切) ,與夾層結構這類粘合組件,以及箱形、工字凸緣與腹板層和桁架加固板附近位置所受的剪切應力類型相同。
  7. Firstly, the analyses on the dynamical response of the tsing ma bridge ( tmb ) under traffic loading are performed on the basis of the three dimensional finite element model of the full - scale structure of the bridge, and some regions critical to fatigue damage are determined from the result of the dynamical response. the hot spot stress approach is usually adopted in the fatigue design and analysis of tubular welded joints. to apply the hot spot stress approach for the fatigue evaluation of long - span suspension bridges, the fem is further used to determine the hot spot stress of the critical fatigue locations

    首先,在青馬大橋三維有限元模型和整體動力響應分析計算的基礎上進一步進行關鍵疲勞構件的局部熱點應力分析,對疲勞危險部位處的構件建立三維有限元模型,施加符合橋實際工況的載荷與位移邊界條件,進行局部熱點應力分析,確定這些構件內的名義應力和相鄰區域內熱點應力之的關系,得到相應的應力集中系數。
分享友人